Welspun Enterprises Limited has informed the Exchange about Investor Presentation
WEL/SEC/2025
November 11, 2025
To, BSE Limited Corporate Relationship Department, 2nd Floor, New Trading Wing, Rotunda Building, P.J. Towers, Dalal Street, Mumbai – 400 001. Scrip Code: 532553
Dear Madam/Sir,
National Stock Exchange of India Limited Exchange Plaza, 5th Floor, Plot No. C-1, Block-G, Bandra-Kurla Complex, Bandra (East), Mumbai – 400 051. NSE Symbol: WELENT
Sub: Investor Presentation pursuant to Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015 (“SEBI Listing Regulations”)
Pursuant to Regulation 30 of the SEBI Listing Regulations, please find attached the Investor Presentation on the Un-audited Consolidated and Standalone Financial Results of the Company for the quarter and half year ended September 30, 2025.
The same is also updated on the website of the Company at www.welspunenterprises.com
You are requested to take the above information on record.
Thanking you,
For Welspun Enterprises Limited
Nidhi Tanna Company Secretary ACS-30465
Encl.: As above
WELSPUN ENTERPRISES LIMITED
Q2FY26 Investor Presentation 11th November 2025
BSE: 532553 | NSE: WELENT |ISIN: INE625G01013
Safe Harbor
The information contained in this presentation is provided by Welspun Enterprises Limited (the “Company”). Although care has been taken to ensure that the information in this presentation is accurate, and that the opinions expressed are fair and reasonable, the information is subject to change without notice, its accuracy, fairness or completeness is not guaranteed and has not been independently verified and no express or implied warranty is made thereto. You must make your own assessment of the relevance, accuracy and adequacy of the information contained in this presentation and must make such independent investigation as you may consider necessary or appropriate for such purpose. Neither the Company nor any of its directors assume any responsibility or liability for, the accuracy or completeness of, or any errors or omissions in, any information or opinions contained herein. Neither the Company nor any of its directors, officers, employees or affiliates nor any other person accepts any liability (in negligence, or otherwise) whatsoever for any loss howsoever arising from any use of this presentation or its contents or otherwise arising in connection therewith.
The statements contained in this document speak only as at the date as of which they are made, and the Company expressly disclaims any obligation or undertaking to supplement, amend or disseminate any updates or revisions to any statements contained herein to reflect any change in events, conditions or circumstances on which any such statements are based. By preparing this presentation, none of the Company, its management, and their respective advisers undertakes any obligation to provide the recipient with access to any additional information or to update this presentation or any additional information or to correct any inaccuracies in any such information which may become apparent. This document is for informational purposes and does not constitute or form part of a prospectus, a statement in lieu of a prospectus, an offering circular, offering memorandum, an advertisement, and should not be construed as an offer to sell or issue or the solicitation of an offer or an offer document to buy or acquire or sell securities of the Company or any of its subsidiaries or affiliates under the Companies Act, 2013, the Securities and Exchange Board of India (Issue of Capital and Disclosure Requirements) Regulations, 2009, both as amended, or any applicable law in India or as an inducement to enter into investment activity. No part of this document should be considered as a recommendation that any investor should subscribe to or purchase securities of the Company or any of its subsidiaries or affiliates and should not form the basis of, or be relied on in connection with, any contract or commitment or investment decision whatsoever. This document is not financial, legal, tax, investment or other product advice.
This presentation contains statements of future expectations and other forward-looking statements which involve risks and uncertainties. These statements include descriptions regarding the intent, belief or current expectations of the Company or its officers with respect to the consolidated results of operations and financial condition, and future events and plans of the Company. These statements can be recognized by the use of words such as “expects,” “plans,” “will,” “estimates,” or words of similar meaning. Such forward-looking statements are not guarantees of future performance and actual results, performances or events may differ from those in the forward-looking statements as a result of various factors and assumptions. You are cautioned not to place undue reliance on these forward looking statements, which are based on the current view of the management of the Company on future events. No assurance can be given that future events will occur, or that assumptions are correct. The Company does not assume any responsibility to amend, modify or revise any forward-looking statements, on the basis of any subsequent developments, information or events, or otherwise.
Any reference herein to "the Company" shall mean Welspun Enterprises Limited, together with its consolidated subsidiaries.
Inside this Presentation
About Welspun World
Advantage Welspun Enterprises Ltd.
Financials Q2FY26
Infrastructure play across verticals
Welspun Michigan Enterprises Ltd.
WEL – ESG At the Core
Summary Historical Financials
Appendix – Project & Investment Details
04
05
11
15
17
20
23
27
Industrial Water Treatment Plant, Dewas, Madhya Pradesh
Global Conglomerate
The USD 5 Bn Welspun Group is one of India’s fastest growing global conglomerates, with business interests in Line Pipes, Home Textiles, Building Materials, Infrastructure, Water, Steel, Warehousing, New Energy, Advanced Textiles and Flooring solutions.
The group has a strong foothold in 50+ countries and its clientele includes Fortune 500 companies.
USD 5 Bn* Revenue
USD 1.8 Bn* Net Fixed Assets
30,000+
Workforce
9
Manufacturing Facilities in India, USA, and Saudi Arabia.
* As on 31st March 2025
w e l s p u n e n t e r p r i s e s . c o m
Global leader in Home Textiles
Amongst world’s largest Line-Pipe manufacturers
Robust portfolio of Roads, Water & Tunnelling Infrastructure projects
Integrated Grade-A Warehousing Solutions
Advantage Welspun Enterprises
This is a 3-D Render of Dharavi WwTF
Creating Value through a Clear Strategy
Remain “Asset Light”
+ Ensure P&L supports new business
Bid for selective projects
Asset Monetization
Monetize Balance Sheet heavy assets
Deploy right mix of contractors for seamless execution
Undertake O&M Create capacity for lifecycle O&M for various segments of Water projects
Manage, Complete & Stabilize Project
Municipal Water Treatment
Industrial Water Supply
Sewerage Treatment
Rural Water Supply
National/State Highways
Tunneling
Independent & Experienced Board
Balkrishan Goenka Executive Chairman
Rajesh Mandawewala Non-Executive Director
Sandeep Garg Managing Director
Deepak Chauhan Director – Legal & Ethics
S Madhavan Lead Independent Director
Dr. Anoop Kumar Mittal Independent Director
Dr. Aruna Sharma Independent Director
(Ex-PWC,and Member, Eminent Boards)
(Ex-CMD, NBCC)
(Ex-Secretary, Steel)
Raghav Chandra Independent Director
(Ex-Chairman, NHAI)
Through an Experienced Management
Sandeep Garg
Managing Director
Abhishek Chaudhary
CEO (Transportation)
Saurin Patel
CEO, Integrated Water SBU
Asim Chakraborty Executive Director
Yogen Lal CEO – Strategy , Business Development
Lalit Jain Chief Financial Officer
Hardik Dhebar President Finance WEL &
Chief Financial Officer - WMEL
Lekha Raghavan Head - HR
Awards, Accreditation & Accolades
Letter of appreciation by Prime Minister of India Shri Narendra Modi
Gold Award for Excellence in Project Management under PPP mode from MoRTH
Most Admired Company in the Transportation for ASRP at ET Now Infra Focus Awards
Best Brand in Construction & Infrastructure for Water Infrastructure at ET Now Infra Focus Awards
Wealth Creator Award at Construction World Global Awards 2025
Excellence in OHS & Management System for Dharavi at OSH India 2025
Sustainable Organization – 2025 at UBS Forums 6th Sustainability & Summit Awards
Maharashtra Best Employer Brand Award at Employer Branding Awards 2025
Strong platform set for future growth
Robust portfolio of Water, Tunnelling and Transport
Current order book at
~₹ 15,600 Cr.*
Segment wise Break-up
Tunnelling and Rehabilitation 24%
Transport 8%
Water 68%
Current Order Book provides strong growth visibility
* Consolidated order book as on September 30, 2025 and incl. ~₹ 5,393 cr. for O&M & asset replacement in MCGM STP project , Bhandup WTP project , UPJJM project and Panjrapur Project.
Financials
Income Statement Snapshot – Consolidated
Particulars (₹ Cr)
Revenue from Operations
Other Income
Total Income
EBITDA
EBITDA margin
PBT Before Exceptional Item
Exceptional Item
PBT
Profit from discontinuing operations (net of tax)
PAT
Q2 FY26
Q2 FY25
YoY %
H1 FY26
H1 FY25
YoY %
784
19
803
192
815
23
838
150
-4%
-14%
-4%
28%
1,629
1,745
45
1,674
399
52
1,798
343
-7%
-14%
-7%
17%
23.9%
17.9%
598 bps
23.9%
19.1%
480 bps
126
0
126
3
98
102
0
102
-12
62
24%
24%
59%
279
0
279
-10
199
255
0
255
-18
171
9%
9%
16%
Income Statement Snapshot – Standalone
Particulars (₹ Cr)
Revenue from Operations
Other Income
Total Income
EBITDA
EBITDA margin
PBT Before Exceptional Item
Exceptional Item
PBT
PAT
Q2 FY26
Q2 FY25
YoY %
H1 FY26
H1 FY25
YoY %
593
25
618
116
663
25
688
99
-11%
-1%
-10%
18%
1,197
1,409
-15.1%
57
1,254
240
55
3.6%
1,464
-14.4%
228
5.6%
18.8%
14.3%
448 bps
19.2%
15.5%
362 bps
95
-
95
73
87
-
87
65
9%
9%
13%
212
0
212
160
206
0
206
154
3.0%
3.0%
4.1%
Returned ~INR 800 crore through buyback & dividends over the last 8 years.
Balance Sheet Snapshot
Long Term Debt Short Term Debt (Working Capital Loan)
Consolidated Balance Sheet Snapshot (₹ Cr.) Net worth Gross Debt - - Cash & Cash Equivalents# Net Debt / (Cash) Other Long-Term Liabilities Total Net Fixed Assets (incl. CWIP) Net Current Assets (Excl. Cash & Cash Equivalents) (adj.)*
30s September 2025 2,870 1,731 1,582 149 1,043 688 127 222 674
31s March 2025 2,709 1,300 1,269 31 1,155 145 126 228 368
Other Long-Term Investments and Assets (adj.)
2,790
2,383
Long Term Debt Short Term Debt (Working Capital Loan)
Standalone Balance Sheet Snapshot (₹ Cr.) Net worth Gross Debt - - Cash & Cash Equivalents# Net Debt / (Cash) Other Long-Term Liabilities Total Net Fixed Assets (incl. CWIP) Net Current Assets (Excl. Cash & Cash Equivalents) (adj.)* Other Long-Term Investments and Assets (adj.)
# Includes Fixed Deposits kept with banks & investments * Mobilization advance has been included into Net Current Assets
30s September 2025 2,810 100
-
100 986 -886 11 26 503 1,405
31s March 2025 2,690 0 - 0 1,061 -1061 8 18 255 1,364
Infrastructure play across verticals
Water
Transport
Tunnel
• Exponential Budgetary surge for
creating water infrastructure ~ ₹6 lakh crore between 2020-25 an increase of over ~6x over 2015-20
• Rapidly expanding highway network ~1,46,000 kms in 2025 to ~1,85,000 kms in 2030
• Tunnelling — a solution
for urbanization
• Technology partners- Xylem, Veolia, etc.
• Clear focus on BOT (Toll) and
HAM projects
• ~ 3,000 km in 10 years as against ~2,500 km in 75 years.
• Strengthening O&M
capabilities for a sustainable business model.
• Stringent NHAI norms
plus larger project sizes present a strong entry barrier
• Enhancing in-house strong &
specialized tunnelling capabilities
20.0 20.0
15.0 15.0
10.0 10.0
5.0 5.0
0.0 0.0
Wastewater Generation & Treatment Capacity GAP at City level in India (2023)
16.4 16.4
90% 90%
90% 90%
96% 96%
95% 95%
63% 63%
6.0 6.0
5.9 5.9
8.0 8.0
7.3 7.3
5.8 5.8
0.6 0.6
0.8 0.8
0.4 0.4
0.2 0.2
Cities with >10 lac Cities with >10 lac population population
Cities with 5-10 lac Cities with 5-10 lac population population
Cities with 2-5 lac Cities with 2-5 lac population population
Cities with 1-2 lac Cities with 1-2 lac populatin populatin
Cities with 0.5-1 lac Cities with 0.5-1 lac population population
Sewage generation 000 (MLD) Sewage generation 000 (MLD)
Sewage treatement - (Installed capacity 000 MLD) Sewage treatement - (Installed capacity 000 MLD)
Gap Gap
Source: Central Pollution Control Board
Building Water Resilience in India
Welspun SmartOps – Unique proprietary Bioengineered Solution S.A.B.R.E*
120% 120%
100% 100%
80% 80%
60% 60%
40% 40%
20% 20%
0% 0%
Low on Capex & Opex
No Drain Network
Low Land Footprint – Up to 1/5th
Welspun SmartOps Treatment Plants
No Pumping Station
Low Deployment Time – Up to 1/10th
Low Energy Cost – Up to 1/10
*Stabilized Aerobic & Anaerobic Bioengineered Reaction Environment
Key Projects
Holy Durga Kund, Varanasi (Uttar Pradesh): Rejuvenation completed
Chandrabhaga River, Vitthal Mandir (Pandharpur, Maharashtra): Project handover completed in July 2025
Mathura Project: The work is underway.
Welspun Michigan Engineers Ltd. (WMEL)
Welspun Michigan Engineers (WMEL)
• WMEL (60.09%), subsidiary of WEL, part of Welspun World, established in 1973
•
Leading EPC firm in tunnelling and pipeline rehabilitation for water & wastewater
• Pioneer in trenchless technology with presence across tunnelling, micro tunnelling, pumping stations, bridges, and subways
• Strong ties with municipal corporations
•
In-house capabilities in engineering, fabrication and assembly
• Executed diverse urban infrastructure
projects — marine, drainage, tunnelling, and pumping systems
• Revenue and EBITDA growth over 5 years @ CAGR of 34% and 38% respectively
• As on 30th Sept. 2025, Order Book of ~
₹ 2,650 Cr (includes DGT order)
WMEL Order Book break-up (%)
Welspun Michigan Engineers (WMEL) - Snapshot
Financial Snapshot
Types of Projects
Financial Year (₹. Cr.)
Q2 FY26 Q2 FY25
YoY growth
H1 FY26 H1 FY25
YoY growth
• Micro tunnelling
• Segment tunnelling
• Rehabilitation of Underground pipelines
Revenue
169
105
60%
377
249
51%
• Deep Storm water pumping stations
EBITDA
35
21
65%
81
57
42%
• Underwater, Drilling, Blasting, Dredging
EBITDA Margin 20.8% 20.2% 60 bps
21.4% 22.9% -150 bps
• Bridges, Subways
• SmartOps
WEL - ESG At The Core
ESG Risk Rating
56
36
(Progressive Industry Average)
(Stable Transition Zone)
CRISIL
Sustainalytics
Carbon Emission 50,707 tCO₂e avoided through various initiatives
Water 17,163 KL water saved 3.11 lakh KL rainwater harvested
Waste 11.3 lakh MT pond ash used 18,189 MT fly ash used 96 % waste diverted
Note: ESG Data FY24-25
Audit Committee
• 3 Members - all Independent Directors
Nomination & Remuneration Committee
• 3 Members - all Independent Directors
Stakeholders’ Relationship, Share Transfer & Investors’ Grievance
• 3 Members - all Independent Directors
Risk Management
• 3 Independent Directors & Managing Director
Environment, Social & Governance & Corporate Social Responsibility
• 3 Independent Directors
Project Review
• 2 Independent Directors & Managing Director
Summary Historical Financials
Consistent Performance
13,800
14,354
8,437
8,400
10,100
3,695
2,758
2,872
1,530
1,401
FY21
FY22
FY23 Order Book (in ₹ Cr.)
FY24
FY25
FY21
FY22
FY23 Revenue (in ₹ Cr.)
FY24
FY25
730
616
313
323
391
FY21
FY22
FY23 EBITDA (in ₹ Cr.)
FY24
FY25
Particulars
Revenue
EBITDA
EBITDA Margin (%)
PAT
Net Debt
Net Worth
Long term Investment
Payback to Investors
FY23
2,758
391
13%
684*
(1,088)
2,362
258
135
FY24
2,872
616
20%
349
(214)
2,490
283
292
₹ Cr
FY25
3,695
730
19%
384
145
2,709
299
42
Steady & Robust Growth
• EBITDA has increased by ~86% and Revenue by ~35%, over 2 years • Average 3-year PAT margin of ~16% encapsulates our strategy of Value Creation through monetization of projects
*This includes gain from divestment of Road assets to Actis ₹ 483 Cr
APPENDIX
Existing Portfolio of Projects
1
2
3
4
5
6
7
8
9
HAM: Aunta - Simaria (Ganga Bridge with Approach Roads)
HAM: Sattanathapuram – Nagapattinam
EPC: Varanasi Aurangabad NH2 Project
EPC: UP State Water and Sanitation Mission
EPC: Dharavi Wastewater Treatment Facility (Mumbai)
EPC: Bhandup Water Treatment Complex (Mumbai)
EPC: Water Conveyance Tunnell (Mumbai)
BOT: Dewas Water
Investment in oil & gas blocks: potential value accretion
10
Portfolio of Welspun Michigan Engineers Projects
Project Names
Contract Type
Status
Water/ Wastewater Treatment
Dewas Water UP State Water and Sanitation Mission
Bhandup Water Treatment Complex (Mumbai)
Dharavi Wastewater Treatment Facility (Mumbai)
2 Smart Ops Treatment Project
Panjrapur Water treatment Faclity (Maharastra)
Water Vertical
DGT- Water Conveyance Tunnel
Tunneling
3 Segment Tunnelling Projects
4 Micro Tunnelling Projects
Pumping and Rehabilitation
6 Pumping Station Construction
2 Sewer Line Rehabilitation
1 Marine Disposal Line Replacement
BOT
EPC
EPC
EPC
EPC
EPC
EPC
EPC
EPC
EPC
EPC
EPC
Operational
Under Execution
Under Execution
Under Execution
Under Execution
Awarded
Under Execution
Under Execution
Under Execution
Under Execution
Under Execution
Under Execution
Project Names
Contract Type
Status
Aunta-Simaria (ASRP)
Transport Vertical
Road Assets
Sattanathapuram-Nagapattinam (SNRP)
Varanasi Aurangabad NH2 Project (VARP)
Pune Shirur NH-753F
HAM
HAM
EPC
BOT
PCOD received
Under Execution
Under Execution
L1 Emerged
01
HAM Aunta-Simaria (Ganga Bridge with Approach Roads)
SCOPE Six- Laning from Aunta-Simaria (Ganga Bridge with Approach Roads) Section from km 197.9 to km 206.1 of NH-31 in Bihar. Includes widest extradosed bridge on Ganga river
BARAUNI REFINERY
SIMARIA
STATUS NHAI declared the Appointed Date as 30th August 2018
AUNTA
The project is completed and inaugurated by PM.
Project details
Project Length (Kms)
Acquisition Date
Financial Closure
Appointed Date
08.15 Km
Aug 2018
Achieved
30th Aug 2018
Scheduled Construction Period
42 Months^
Concession Period after COD
15 Years
^ PCOD received on 15th May 2025
Project cost & financing * (₹ Cr.)
Bid Project Cost (with escalation)
1,603.0
MALHIPUR
Means of Finance
NHAI
Debt
Sponsor’s Commitment
First year O&M Payment (excluding escalation)
624.0
648.0
160.0
9.9
02
HAM Sattanathapuram- Nagapattinam (SNRP)
SCOPE 4 laning of Sattanathapuram to Nagapattinam (Design Ch Km 123.8 to Km 179.6) section of NH-45A (New NH -332) in Tamil Nadu
STATUS Received Appointed Date on 5th October 2020 with 4 lane road & 4 lane structures as against 4 lane road & 6 lane structures specified in the Concession Agreement
The project is under execution.
SATTANATHAPURAM
NAGAPATTINAM
Project details
Project Length (Kms)
Award Date
Financial Closure
Appointed Date
55.755 Km
July 2018
Achieved
5th Oct 2020
Scheduled Construction Period
24 months^
Concession Period after COD
15 Years
^ EOT up to 31st Oct 2025 received, & Further EOT is in process
Project cost & financing * (₹ Cr.)
Bid Project Cost (with forecasted escalation)
Means of Finance
NHAI
Debt
Sponsor’s Commitment
First year O&M Payment (excluding escalation)
* Forecasted figures
2,511.0
1,000.9
1,057.0
272.0
5.0
03
EPC Varanasi Aurangabad NH2 Project (VARP)
SCOPE
Six laning of Varanasi – Aurangabad
section of NH-2 from km 786.00 to
km 978.00 (length 192.400 km) in
the State of Uttar Pradesh & Bihar
Project details
Project Length (Kms)
192.4
Original Contract
Commencement Date
Construction Period
Additional Contract
Construction Start Date
Construction End Date
30th Sep 2021
24 Months
May 2022
Nov 2023^
^ EOT available up to 30th Jun 2025. EOT up to 28 February 2026 is under process with
client. Status •
Total contract value of ~₹ 3,266 Cr. (excluding GST)
04
EPC UP State Water and Sanitation Mission
SCOPE
Rural Water Supply project under Jal
Jeevan Mission by State Water
Sanitation Mission UP, scope includes
Survey, Design, Preparation of DPR,
Construction, Commissioning and
O&M for 10 years of various Rural
Water Supply Projects in the State of
Uttar Pradesh
Project details
Project Scope
Water Supply to Villages
Est aggregate contract value (excluding O&M value and GST)
₹ ~ 2,800 Cr.
S No.
Revenue Division
District
No of Villages
1
2
3
4
5
Varanasi
Jaunpur
Varanasi
Sant Ravidas Nagar
Ayodhya
Ambedkar Nagar
Ayodhya
Amethi
Meerut
Bulandshahr
Total No of Villages
747
877
241
240
439
2,544
05
EPC Wastewater Treatment Facility - Mumbai Sewage Disposal Project, Dharavi
SCOPE
Design, Build, Operation and
Maintenance of 418 MLD Dharavi
Wastewater Treatment Facility
including 209 MLD Tertiary treatment
facility under Mumbai Sewage
Disposal Project, Stage II (Priority
Works)
Above is a 3-D model
Project details
Contract period
60 Months for Design Build, 15 years of operation and maintenance
Status
LOA received on May 27, 2022 Project Commencement date – July 4, 2022
Total consideration (includes O&M and Asset replacement) of ~₹ 4,636 Cr. (inclusive of GST)
05
EPC Dharavi Project - India’s First Multi-Storeyed Wastewater Treatment Facility
• A first-of-its-kind project in the country, this facility is being constructed vertically, due to the space constraints at the project site.
• Being built on just 12.7 acres of land, it has one of the lowest footprint per MLD
• Capable of treating sewage
generated by a population of nearly 3.5 million people
• 50% of this treated wastewater will
be tertiary treated
Above is a 3-D render
06
EPC Water Treatment Plant – Bhandup Complex, Mumbai
SCOPE
Design, Build, Operation and
Maintenance of 2,000 MLD Water
Treatment Plant at Bhandup
Complex, Mumbai.
Above is an illustrative image
Project details
Contract period
48 Months for Design Build, 15 years of operation and maintenance
Status
LOA received on Feb 29, 2024
Received Notice to Commence effective July 23, 2024
Total consideration (includes O&M and Asset replacement) of
~ ₹ 4,123.8 Cr. (inclusive of GST)
07
EPC Water Conveyance Tunnel from Dharavi WWTF to Ghatkopar WWTF– Mumbai
SCOPE
Design and construction of Tertiary
Treated Water Conveyance Tunnel of
8.48km length with a 3,500 mm
bored diameter.
Above is an illustrative image
Project details
Contract period
93 Months for Design Build of a 8.48 km tunnel with a 3,500 mm bored diameter
Status
LOA received on Oct 8, 2024
Received Notice to Commence effective Nov 29, 2024
Total consideration of ~₹ 1,989.4 Cr. (Excluding GST)
07
EPC Water Treatment Plant (WTP) at Panjrapur, Maharashtra
SCOPE
Design, Build, Operation and
Maintenance of 910 MLD Water
Treatment Plant including
comprehensive civil, mechanical,
electrical and instrumentation works,
along with the construction of a
treated water pump and pumping
station.
Above is an illustrative image
Project details
Contract period
48 Months for Design Build, 15 years of operation and maintenance
Status
LOA received on Nov 6, 2025
Total consideration including GST ~₹ 3,145 Cr. (includes O&M and Asset replacement ~ ₹1,156 Cr. )
08
BOT Dewas Water
Sector
Project Name
Location
COD
Concession End
Water Supply
Dewas Water*
MP
Apr-20
Jun-37
*Dewas Water – Modified Project
▪ Modified project involves the supply of treated water of up to 23 MLD to industrial customers in Dewas
▪ FY26 H1 revenue stands at ₹ 7.0 Cr. with EBITDA of ₹ 3 Cr.
Oil & Gas Oil & Gas Oil & Gas
• Collective GIIP* : ~1.1 TCF
• Gas Evacuation Plan Through a National Oil and Gas Company’s Network – in advance stages of discussion
• Monetization Expected in FY ‘29
Location of Fields
*Gas Initially In Place
Gas Evacuation Schematic
39
Thank You
For further details please contact
investorrelations_WEL@welspun.com/Sangeeta_tripathi@welspun.com Sangeeta Tripathi- Head Investor Relations Mr Salil Bawa, Head – Group Investor Relations