Hindustan Construction Company Limited
1,162words
1turns
0analyst exchanges
0executives
Key numbers — 40 extracted
rs,
₹13,152
3%
12%
22%
63%
2%
4%
9%
16%
19%
6%
Guidance — 2 items
Operations update
opening
“10 November 6, 2025 Analyst Presentation – Q2 FY26 Results Operations Update: Bhivpuri PSP Upper Reservoir Intake Excavation Powerhouse Excavation Excavation works in Upper Reservoir, Lower Reservoir, Powerhouse and Penstock Fabrication works are in progress.”
Operations update
opening
“11 November 6, 2025 Analyst Presentation – Q2 FY26 Results Standalone Financials: Q2 FY26 Results are in accordance with the Indian Accounting Standards (Ind AS) notified by the Ministry of Corporate Affairs Particular Income from Operations Other Income Total Income Construction Cost (incl.”
Advertisement
Speaking time
1
Opening remarks
Operations update
– Mumbai Metro Line 3 (Pkg UGC02) inaugurated by PM Shri Narendra Modi on Oct 8, 2025 – Tehri PSP: Unit 7 synchronisation with Grid completed – Vishnugad Pipalkoti HEP: 7.5 km of TBM mining completed out of the 12.1 km – The Indore Metro made steady headway at key locations – Bhivpuri PSP: Excavation across the Upper and Lower Reservoirs, Powerhouse, and Penstock Fabrication sites. 5 November 6, 2025 Analyst Presentation – Q2 FY26 Results Operations Update: Mumbai Metro Line 3 Inaugurated by Honourable Prime Minister Shri Narendra Modi on October 8, 2025 CST Station 6 November 6, 2025 Analyst Presentation – Q2 FY26 Results Operations Update: Mumbai Metro Line 3 Kalbadevi Station Girgaon Station Grant Road Station 7 November 6, 2025 Analyst Presentation – Q2 FY26 Results Operations Update: Tehri PSP (4x250 MW) Powerhouse Overview Unit 7 Synchronization with Grid 8 November 6, 2025 Analyst Presentation – Q2 FY26 Results Operations Update: Vishnugad Pipalkoti HEP HRT by TBM Machine Hall U