JSWENERGY · Q1 FY27 · results presentation
JSWENERGY
The company reported a 2% YoY increase in EBITDA to ₹3,103 Cr and PAT of ₹533 Cr for Q1 FY27. Despite challenges like lower thermal generation due to hydrology issues and one-off plant evacuations, they achieved significant capacity additions across renewables and thermal segments. The company emphasized strategic initiatives including stake monetization in JSW Steel, a Qualified Institutional Placement (QIP), and progress on energy storage projects.




Key financials
| EBITDA | ₹3,103 crore | YoY |
| PAT | ₹533 crore | YoY |
| Net Generation (MUs) | 12.9 BUs | YoY |
| Renewables Generation | 3.4 BUs | YoY |
| Thermal Generation | 8.0 BUs | YoY |
Segment commentary
Renewables
Achieved 11% YoY increase in generation, driven by capacity additions.
Thermal
Generation decreased 6% YoY due to lower PLFs and plant evacuations.
Financials
EBITDA increased 2% YoY despite challenges, supported by strategic initiatives.
Guidance & outlook
- Targeting 3 GW capacity addition in FY27 with significant progress already made.
- Focus on deleveraging through strategic fund raises and operational efficiency improvements.
- Expectations of continued growth in renewables and thermal segments with execution-ready projects.
Notable quotes
“We are firmly on track to deliver 3 GW capacity addition in FY27.”— Management
“Our strategy includes significant investments in renewable energy and thermal expansion, supported by strong fund-raising efforts.”— Management
Key takeaways
- Strong focus on capacity expansion in renewables and thermal segments despite operational challenges.
- Significant strategic fund-raising efforts to support growth and deleveraging.
- Challenges remain with hydrology and plant evacuations, but management remains confident in achieving targets.
Risks flagged
- Hydrology issues impacting hydro plants.
- One-off plant evacuations affecting thermal generation.
- Global macroeconomic uncertainties influencing demand.
Educational analysis only. Not investment advice. Consult a
SEBI-registered advisor before investing. Source: https://nsearchives.nseindia.com/corporate/KRUTIKAJSWEL_22072026144727_Finalsigned.pdf
Full transcript (7,639 words)
Energy Limited
Regd. Office : JSW Centre
Bandra Kurla Complex
Bandra (East), Mumbai - 400 051
CIN: L74999MH1994PLC077041
Phone: 022 – 4286 1000
Fax: 022 – 4286 3000
Website: www.jsw.in
SEC / JSWEL
22nd July 2026
BSE Limited National Stock Exchange of India Limited
Phiroze Jeejeebhoy Towers Exchange Plaza
Dalal Street Bandra - Kurla Complex, Bandra (E)
Mumbai - 400 001 Mumbai - 400 051
Scrip Code: 533148 Scrip Code: JSWENERGY- EQ
Subject: Results Presentation in connection with the unaudited Standalone and
Consolidated Financial Results of the Company for the quarter ended 30th June
2026
Regulation 30 of the Securities and Exchange Board of India (Listing Obligations
and Disclosure Requirements) Regulations, 2015
Dear Madam / Sirs,
Further to our letter dated 17th July 2026, please find attached the Results Presentation in
connection with the unaudited Standalone and Consolidated Financial Results of the Company
for the quarter ended 30th June 2026.
Yours faithfully,
For JSW Energy Limited
Monica Chopra
Company Secretary
Part of O. P. Jindal Group
Q1 FY27
Result Presentation
22nd July 2026
Forward Looking and Cautionary Statement
This presentation has been prepared by JSW Energy Limited (the “Company”) based upon information available in the public domain solely for information purposes without regard to any
specific objectives, financial situations or informational needs of any particular person. This presentation should not be construed as legal, tax, investment or other advice. This presentation is
strictly confidential, being given solely for your information and for your use, and may not be copied, distributed or disseminated, directly or indirectly, in any manner. Furthermore, no person is
authorized to give any information or make any representation which is not contained in, or is inconsistent with, this presentation. Any such extraneous or inconsistent information or
representation, if given or made, should not be relied upon as having been authorized by or on behalf of the Company.
This presentation contains statements that constitute forward-looking statements. These statements include descriptions regarding the intent, belief or current expectations of the Company or
its directors and officers with respect to the results of operations and financial condition of the Company. These statements can be recognized by the use of words such as “expects,” “plans,”
“will,” “estimates,” “projects,” or other words of similar meaning. Such forward-looking statements are not guarantees of future performance and involve risks and uncertainties, and actual
results may differ from those specified in such forward-looking statements as a result of various factors and assumptions. The risks and uncertainties relating to these statements include, but are
not limited to, (i) fluctuations in earnings, (ii) the Company’s ability to manage growth, (iii) competition, (iv) government policies and regulations, and (v) political, economic, legal and social
conditions in India. The Company does not undertake any obligation to revise or update any forward-looking statement that may be made from time to time by or on behalf of the Company.
Given these risks, uncertainties and other factors, viewers of this presentation are cautioned not to place undue reliance on these forward-looking statements.
The information contained in this presentation is only current as of its date and has not been independently verified. The Company may alter, modify or otherwise change in any manner the
contents of this presentation, without obligation to notify any person of such revision or changes. No representation, warranty, guarantee or undertaking, express or implied, is or will be made
as to, and no reliance should be placed on, the accuracy, completeness, correctness or fairness of the information, estimates, projections and opinions contained in this presentation. None of
the Company or any of its affiliates, advisers or representatives accept any liability whatsoever for any loss howsoever arising from any information presented or contained in this presentation.
Please note that the past performance of the Company is not, and should not be considered as, indicative of future results. Potential investors must make their own assessment of the relevance,
accuracy and adequacy of the information contained in this presentation and must make such independent investigation as they may consider necessary or appropriate for such purpose. Such
information and opinions are in all events not current after the date of this presentation.
The Potential investors shall be in compliance with the applicable Insider Trading Regulations, with respect to the Company in reference to the information provided under this presentation.
JSW Energy Q1 FY27 Results Presentation
2
Indian Economy
Real GDP Growth (%)
• Indian economy continues to grow amid global
uncertainties
22.6
13.5 o Real GDP grew by 7.8% YoY in Q4 FY26 and is
9.9 9.7 9.3 9.5 estimated to remain healthy at 6.6% for FY27, as per
6.9 8.4 7.5 6.6 7.4 7.0 6.8 8.3 8.0 7.8
5.5 6.0 RBI
4.8
4.5
1.8
o PMI continues to remain robust at 57.4 for Services
3.3
and 54.2 for manufacturing in Jun-26
0 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
- - - - - - - - - - - - - - - - - - - - - -
c r n p c r n p c r n p c r n p c r n p c r
e D a M u J e S e D a M u J e S e D a M u J e S e D a M u J e S e D a M u J e S e D a M o GST collection at ₹ 1.95 trillion in Jun-26, indicating
a 13.9% YoY growth
GST Collection (₹ Lakh Cr) PMI – Manufacturing & Services
2.8
65 • Inflation
2.3 57.4
60
o June-26 CPI inflation rose to 4.38% up from 3.93% in
1.8 May as the U.S.-Iran war and a weak monsoon
1.95 55
54.2
raised food and fuel prices
1.3
50
PMI Manufacturing PMI Service o Index of Industrial Production (IIP) grew 5.1% YoY in
0.8
45
11222233334444555566 May-26
22222222222222222222 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6
-------------------- 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
pcrnpcrnpcrnpcrnpcrn - - - - - - - - - - - - - - -
e S e D a M u J e S e D a M u J e S e D a M u J e S e D a M u J e S e D a M u J c e D r a M n u J p e S c e D r a M n u J p e S c e D r a M n u J p e S c e D r a M n u J
India's economic growth remains resilient, supported by strong GDP growth, robust GST collections, healthy industrial activity
JSW Energy Q1 FY27 Results Presentation
3
Power Demand Trends in Q1 FY27
Power Demand in BUs Power Demand Growth (% YoY)
• All-India power demand rose 8.5% YoY
FY 2027 FY 2026 FY 2025 FY 2027 FY 2026 to 483 BUs in Q1 FY27, supported by an
extended heatwave, delayed monsoon
166
progression and higher cooling demand,
driving increased residential and
11.5%
commercial power consumption.
Demand growth accelerated to 11.5%
YoY in June 2026
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
• Q1 FY27 power demand growth was led
by the South (+14.4% YoY to 122 BUs)
Peak Demand in GW Power Demand in BUs
and West (+9.8% YoY to 152 BUs), while
North West South East & NE India
the North reported growth of 3.6% YoY
FY 2027 FY 2026 FY 2025
445 483 149 166 to 144 BUs. East & NE demand
265 61 65 21 23 increased 6.5% YoY to 65 BUs
107 122 34 38
138 152 42 51 • India recorded its highest-ever peak
power demand of 271 GW in May 2026,
139 144 52 55 while peak demand remained robust at
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
265 GW in June 2026
Q1 Q2 Q3 Q4 Q1 FY26 Q1 FY27 Jun-26 Jun-26
Robust demand growth and record peak load underscore India's strengthening power consumption trend in Q1FY27
JSW Energy Q4 FY26 Results Presentation
Source: Central Electricity Authority (CEA) 4
Agenda
01 02 03
Operational &
Company Strategy 3.0:
Financial
Highlights Growth Blueprint
Performance
04 05
Safety & Appendix
Sustainability
JSW Energy Q1 FY27 Results Presentation
5
Q1 FY27 - Key Highlights
Record Capacity Addition of ~1.1 GW till July 8th Largest Growth Capital Raise in Indian Power
Sector (₹ 10,150 Cr)
Preferential allotment to Promoters
Hybrid, 381
Wind, 108 Inorganic, 150 ₹1,125 Cr received; balance to be received before June
₹3,000 Cr
2027
1,081 MW 1,081 MW
Partial Stake Sale in JSW Steel
₹3,150 Cr
2.5 Cr JSW Steel shares monetized out of 7 Cr shares
held, augmenting liquidity
Hydro, 150
Solar, 442
Tidong HEP commissioned
ahead of Oct'26 target, Organic , 931
capturing hydro season
₹4,000 Cr Qualified Institutions Placement (QIP)
Raised from marquee global and domestic institutional
investors
More than One-third capacity addition target of FY 27 Achieved
[Already achieved ~87% of total organic capacity added in entire FY26]
Ample Liquidity Cushion (Cash balance)
₹12,881 Cr
FY27 Capex Guidance Sizable cash balances & future internal accruals to fund
of ₹ 20,000 Cr
equity portion of estimated Capex till FY30 (~₹ 1.1
1,500 trillion)
Total capex in Q1 FY27
at ₹ 4,076 Cr
4.95x Improving Net operational leverage (TTM)
419
Net operational leverage improved from ~5.2x (TTM) in
H1 FY27 targeted addition of
FY26
1,081 1,081 ~1.5 GW
YTD ( 8th Jul'26) FY27 Target
Commissioning Target of 1.5 GW by H1FY27 Strategic fund raises aiding growth and deleveraging
JSW Energy Q1 FY27 Results Presentation
7
Q1 FY27 - Quarterly Highlights (1/2)
LT Thermal Generation (MUs)
Operational performance
Utkal* +805
•
Net generation volume: Declined by 5% YoY, from 13.5 BUs to 12.9 BUs, but up 10% QoQ
Standalone (596)
•
RE (Wind & Solar) generation increased 11% YoY from 3.1 BUs to 3.4 BUs; up 41% QoQ
Mahanadi (564)
•
Thermal generation was down by 6% YoY from 8.5 BUs to 8.0 BUs; down 9% QoQ Barmer (78)
• Long Term PPA Generation: Decreased by 4% YoY, from 11.8 BUs to 11.2 BUs; up 30% QoQ Total (433)
ST Thermal Generation (MUs)
•
Short Term PPA Generation: Down 7% YoY, from 1.7 BUs to 1.6 BUs; down 48% QoQ
Mahanadi + 380
Q1 FY27 | Net Generation (MUs) Standalone +375
Utkal* (797)
Renewables Thermal
Total (42)
13,494 65 273 12,868
-42
-489 -433
338
1,558 MW YoY
Generation down 3% YoY Generation down 6% YoY Increase in Capacity
(from 4,990 MUs to 4,840 MUs) (from 8,504 MUs to 8,029 MUs)
Installed Installed
Capacity up 1,558 MW YoY Capacity unchanged YoY
Capacity Capacity
12,768 MW 14,326 MW
Q1 FY26 Hydro Wind Solar ST LT Q1 FY27
Thermal Thermal
Capacity addition leading to RE(Solar& Wind) generation growth of 11% YoY
JSW Energy Q1 FY27 Results Presentation
*Impact of Utkal capacity PPA tie up starting April 2026: Short Term; LT: Long Term 8
Q1 FY27 - Quarterly Highlights (2/2)
Consolidated Financial
Growth Projects Strategic Updates
Performance
• Q1FY27 EBITDA up 2% YoY to ₹3,103 Cr • Renewable capacity up 1,081 MW till • Monetized part stake in JSW Steel on
from ₹3,057 Cr July 8th (Solar +442 MW, Wind +108 18th May, as part of a strategic liquidity
MW, Hybrid +381 MW, Hydro +150 release; gross proceeds of ₹3,150 Cr
• Q1FY27 PAT stood at ₹533 Cr vis-à-vis
MW); Total capacity now at 14,535 MW
₹836 Cr in Q1FY26 • Raised ₹4,000 Cr via QIP on 25th May to
o 150 MW Tidong Hydro plant fully accelerate growth and reduce net
• Cash PAT for the quarter stood at ₹1,464
commissioned on 12th June, well leverage
Cr
ahead of Oct'26 schedule
• Increased stake in Toshiba JSW Power
• Net Debt to Equity at 1.70x, Operational
• Halol wind blade manufacturing facility Systems JV to 10.7% (from 2.4%) -
Net Debt to EBITDA at 4.95x
operationalized on 8th June - fortifies thermal growth
• DSO stood at 65 days strengthens backward integration
• Received first large external order (200
• Robust liquidity buffer with Cash & Cash • Definitive agreement signed for MW/400 MWh) for the Company's
Equivalents at ₹12,881 Cr acquisition of 300 MW Maruti Thermal battery assembly facility
Plant, on 13th June
Momentum compounding across operations and balance sheet — the foundation for Strategy 3.0
JSW Energy Q1 FY27 Results Presentation
9
Operations & Financial Performance
Pune, Maharashtra
Consolidated Performance
Operational Highlights
Net Generation (MUs) Total Revenue (₹ Cr)
• Net generation softened by 5% YoY, primarily
-5% Flat
13,494 5,411 5,437 driven by lower PLFs at Hydro plants and
12,868
Mahanadi
Short Term
FY26 • Hydro plants were impacted due to weak
87% 87% Long Term hydrology in Q1FY27 despite plant
FY27
11,752 11,242 availability; continues to receive capacity
Total
charges, basis plant availability
• Mahanadi plant impacted due to a one-off
Q1 FY26 Q1 FY27
Q1
evacuation availability (Force Majeure);
normalized in June’26
EBITDA (₹ Cr) Cash Profit After Tax * (₹ Cr)
• RE generation declined 3% YoY from 5.0 BUs to
4.8 BUs; Thermal generation decreased 6% YoY
-7%
2% from 8.5 BUs to 8.0 BUs
3,057 3,103 1,579
1,464 Financial Highlights
FY26 FY26
• Revenue remained flat YoY at ₹5,437 Cr, while
FY27 FY27
EBITDA increased 2% to ₹3,103 Cr
• Cash PAT fell 7% YoY to ₹1,464 Cr; reported
PAT at ₹ 533 Cr declined from ₹ 836 Cr in Q1
Q1 Q1
FY26
Capacity addition rendering stable EBITDA outlook
JSW Energy Q1 FY27 Results Presentation
11
*Cash Profit after tax computed as PAT to shareholders+ Depreciation+ Deferred Taxes – Dividend income +/(-) Exceptional items for operational assets.
Consolidated Financial Results
Total Revenue (Q1 FY27) EBITDA (Q1 FY27) EBITDA Margin (Q1 FY27) Cash PAT (Q1 FY27)
₹5,437 Cr Flat ₹3,103 Cr 57% ₹1,464 Cr
-7%
+2% 0.6 pp
vs ₹5,411 Cr Q1 FY26 vs ₹3,057 Cr Q1 FY26 vs 56% Q1 FY26 vs ₹1,579 Cr Q1 FY26
Particulars in ₹ Crore Q1 FY27 Q1 FY26
Total Revenue 5,437 5,411
EBITDA 3,103 3,057
EBITDA Margin(%) 57% 56%
Depreciation 890 739
Finance Cost 1,519 1,306
Profit Before Tax 696 1,012
PAT 533 836
Non-Controlling Interest 62 93
PAT to Shareholders 471 743
Cash Profit After Tax 1,464 1,579
Diluted EPS (₹) 2.57 4.25
RE Capacity addition leading to higher EBITDA margin
JSW Energy Q1 FY27 Result Presentation
12
EBITDA Bridge
Q1 FY27
Particulars in ₹ Cr
₹ (186) Crore from Thermal
3,057 122 16 3,103
95
(109)
(77)
+2% YoY
₹ 217 Crore from Renewables
EBITDA Thermal - LT Thermal - ST Solar & Wind Hydro Others EBITDA
Q1 FY26 Q1 FY27
RE capacity addition and LT PPA tie up supporting EBITDA growth
JSW Energy Q1 FY27 Results Presentation
13
Net Debt Movement Q1 FY27
Operational Net Debt (₹ Cr) CWIP Debt (₹ Cr)
3,654
57,779 8,055
-64 54,885
-2,212 -1,277
-2,995
6,437
-1,618
New Debt Taken Repayment Change in
(incl. acquisition Cash & Cash
debt and Eq.*
Net Debt as on reclassification) Forex restatement Movement in Net Debt as on Net Debt as on Net Addition Net Debt as on
Mar 31,2026 Jun 30,2026
Mar 31,2026 and other short term Jun 30,2026
borrowings
Net Debt: ₹ 61,322 Cr = Operational Net Debt: ₹ 54,885 Cr + CWIP Net Debt: ₹ 6,437 Cr
(TTM Net Leverage: 5.53x)
TTM Operational Net Leverage Declined to 4.95x
JSW Energy Q1 FY27 Results Presentation
14
Superior Credit Profile
Net Debt (₹ Cr) Net Worth (₹ Cr)* & Cash Returns (%)
36,161
59,313 61,960 63,771 65,834 61,322 27,362 27,738 19% 29,124 20% 29,634 20% 30,752
18%
16%
31,336
20,746 21,378 22,031 22,413 23,781
14%
Mar-25 Jun-25 Sep-25 Dec-25 Mar-26 Jun-26
Adjusted Net Worth (₹ Cr) ** Net Worth (₹ Cr) Cash Return on Adj. Net Worth (%)
Jun-25 Sep-25 Dec-25 Mar-26 Jun-26
QIP leading to higher Networh; impacting Returns in Q1FY27
Leverage Ratios Wt. Average Cost of Debt
ND/EBITDA ND (Excl. CWIP)/EBITDA ND/Equity
9.05%
5.95 6.03 6.05 5.96
5.53 8.87%
4.96 8.79%
8.57%
5.23
4.66 4.82 4.92 4.95
3.89 8.36% 8.36%
2.14 2.13 2.15 2.15
1.61 1.70
Mar-25 Jun-25 Sep-25 Dec-25 Mar-26 Jun-26 Mar-25 Jun-25 Sep-25 Dec-25 Mar-26 Jun-26
JSW Energy Q1 FY27 Results Presentation
* Net Worth is impacted by change in value of listed equity investments through Other Comprehensive Income ** Adjusted for value of investments (net of taxes) 15
Healthy Trade Receivables
Trade Receivables* (₹ Cr ) Off-taker Profile: Installed Capacity#
HR, 2% Others, 10%
4,151
3,696
Open, 4%
TN, 4%
Hybrid,
UP, 8%
1,696
Group Captive, 20%
Hydro, Thermal,
1,781 5,658
C&I, 5%
GJ, 3% 14,535 MW
HP, 2% Wind,
3,125
MH, 3%
Jun 30, 2025 Jun 30, 2026
AP, 3%
Solar, SECI, 12%
2,275
KA, 5%
TS, 3%
Receivable Days 58 65
PTC, 7% RJ, 9%
Receivables days is based on Q1 FY27 capacity of 14,326 MW
Marginal Increase in DSO driven by higher LT tie-ups Diversified Fuel Source and Offtaker, leading to De-risked Business Model
*Includes unbilled revenue; # Reclassified 225 MW solar and ~639 MW wind capacity as hybrid projects following revisions to Vijayanagar Group Captive PPA modalities
JSW Energy Q1 FY27 Results Presentation
16
Cash Returns on Adjusted Net Worth
₹ Cr (Unless mentioned otherwise)
Jun-26
Quarter ended Mar-24 Jun-24 Sep-24 Dec-24 Mar-25 Jun-25 Sep-25 Dec-25 Mar-26 Jun-26
(TTM)^
PAT to Shareholders 351 522 853 168 408 743 705 420 372 471 1,967
Add: Depreciation 427 375 392 406 482 739 809 829 809 890 3,336
Add/(less): Deferred Taxes (92) 61 (4) (66) (146) 97 18 (745) (481) 103 (1,105)
(Less): Dividend Received - - (51) - - - (20) - - - (20)
Add/(less): One-offs - - - - - - - 65 - - 65
Cash PAT 686 958 1,190 507 744 1,579 1,512 570 699 1,464 4,244
Cash PAT (TTM) 3,237 3,452 3,462 3,341 3,399 4,019 4,341 4,471 4,359 4,244 4,244
Adjusted Net Worth* 15,501 20,972 21,553 21,504 20,746 21,378 22,031 22,413 23,781 31,336 31,336
Cash Returns on Net Worth (%) 21% 17% 16% 16% 16% 19% 20% 20% 18% 14% 14%
Recent QIP leading to higher Networth; impacting Returns in Q1FY27
Healthy Cash Returns at 14%
JSW Energy Q1 FY27 Results Presentation * Adjustment in net worth by excluding the value of shares of JSW Steel
17
Strategy 3.0: Growth Blueprint
Vijayanagar, Karnataka
Generation Capacity – 30 GW by 2030
Wind, 5,370MW, 17%
Hydro, 1,781MW, 5%
Capacity (MW)
Strategy 3.0 Target: 30 GW by 2030
32,363
Merchant, ^ e
Solar, 6,280MW, n
2,396MW 3,961 ile
19% p
32.4 GW * 28,402 iP
300
Locked-in Hybrid, 7,974MW,
25% 4,417
Group
Captive/ C&I,
5,646MW 3,105
Utility Scale,
24,321MW 2,245
3,800
Thermal, 14,535
10,958MW, 34% 28,402
Hybrid,
1,696
Thermal, 5,658
Hydro, 1,781
13,567 MW Under construction
PPA signed (excl. 600 MW Mahanadi)
14,535 MW
W 3,1 in 2 d 5 , Installed Capacity t n e r r u C la m r e h T d n iW r a lo S d ir b y H -r e d n U n o itis iu q c a + d e lla t s n I - r e d n U n o it c u r ts n o C la to T g n id u lc n I ^ e n ile p iP
Solar, 2,275
^ Pipeline: Projects where LoA/LoI is received and PPA to be signed
JSW Energy Q1 FY27 Results Presentation Installed capacity to reach 30 GW by 2030, at CAGR of 17%
19
Under-Construction and Pipeline Projects
Under Construction : 13,567 MW Pipeline Projects^: 4,261 MW
Thermal Assets Wind Assets Solar Assets
Fixed cost ( ₹/ Project Installed (MW) Project Installed (MW)
Project Installed (MW)
Kwh) NTPC Solar III 400
SECI XII 300
Salboni 1 3.6 1,600 SECI XV (Solar +ESS) 500
SECI XVI 1,025
Salboni 2 4.06 1,600 Total Solar 900
C&I (Amazon) 182
Thermal- Wt. Tariff (₹5.6 / KWh) 3,200
Adani Energy - Wind I 250
JSW Mahanadi - 600 Hybrid Assets
O2 Power 488
Total Thermal - 3,800
Total Wind- Wt.tariff (₹3.5 / KWh) 2,245
Project Installed (MW)
SECI (Hybrid VIII) 330
Solar Assets SJVN (Hybrid - II) 330
NTPC (Hybrid VI) 330
Hybrid Assets
Group Captive 250
Project Installed (MW)
O2 Power 621
SJVN (Tranche I) 700
Project Installed (MW)
Total Hybrid 1,861
SECI XIII 700
GUVNL (Phase 2) 234
GUVNL (Khavda) 17
MSEDCL (Hybrid III &IV) 1,600 NTPC Solar II 700 Thermal
C&I 243 Pavagada (Karnataka) 150
C&I (Indus Tower) 130
FDRE IV 350
Project Installed (MW)
KREDL (Solar + BESS) 100
Group Captive 1,062 JSW Mahanadi Thermal Optionality 1,200
Group Captive 72
O2 Power 928 O2 Power 536 Maruti Clean Coal & Power- Under Acquisition 300
Total Hybrid- Wt. tariff (₹3.7 / KWh) 4,417 Total Solar – Wt. Tariff (₹2.8 /KWh) 3,105 Total Thermal 1,500
^ Pipeline: Projects where LoA/LoI is received and PPA to be signed
JSW Energy Q1 FY27 Results Presentation
20
Firmly on Track to Deliver 3 GW Capacity Addition in FY27
3.0 GW ~1.1 GW 36%
FY27 Guidance Achieved YTD Of Target Achieved
~1.1 GW ~1.9 GW
1.9 GW fully backed by secured land, connectivity and a diversified offtaker mix
Diversified offtaker mix across utility, C&I and Connectivity In Place for 1.9 GW 99% of the Required Land in Possession
Captive projects
Acquisition
Captive, 13% underway, 1%
C&I Captive
99%
30% Projects
100%
secured
28%
CTU, 49%
secured
STU, 38%
1.9 GW
Land Secured,
99%
Captive Projects STU, 54% Captive, 46% Captive Projects Land Secured, 100%
Utility
42%
Utility Projects CTU, 74% STU, 26% Utility Projects Land Secured, 100%
C&I Projects CTU, 60% STU, 40% C&I Projects Land Secured, 95%
Execution certainty of 3 GW capacity addition in FY27
JSW Energy Q1 FY27 Results Presentation
21
Execution-Ready Thermal Growth Platform
De-risked thermal expansion - backed by land, infrastructure, fuel access and advanced project readiness
Salboni Phase I Mahanadi
ACTIVE EXECUTION DE-RISKED EXPANSION
1,600 MW Greenfield — Under Active Execution
1,800 MW Under Construction • BOP In Place for all three units
1,600 MW • Entire Land Secured • 25-yr PPA (WBSEDCL) 600 MW: Target COD - FY28 1,200 MW: Target COD - FY29
Land Secured: Entire project land already in possession Ready Expansion Platform: Land, water, rail and transmission infrastructure
✓ ✓
already available for entire 3,600 MW platform
Regulatory Milestone Achieved: Environmental Clearance received and
✓
construction commenced ✓ Environmental Clearance in place for entire 3,600 MW platform
Equipment Order: Placed
✓ Brownfield Advantage: 600 MW unit already ~40% complete; BOP infrastructure
✓
in place for full all three units
Construction Mobilized: Civil package awarded, advancing project execution
✓
Equipment Order: Placed for one unit (600 MW), discussion ongoing for balance
✓
2 units ( 600 MW each)
✓ Fuel Framework : Domestic coal allocation under SHAKTI policy
Evacuation Infra: Double circuit line under construction, common for remaining
✓
✓ Evacuation Infra: In WBSEDCL Scope as per PSA 3x600 MW
Thermal growth pipeline is fully execution-ready
JSW Energy Q1 FY27 Results Presentation
22
Energy Storage – Target of 40 GWh by 2030; 29.6 GWh Locked-in
BESS Projects
PSP Projects
BESPA
BESS (GWh) Capacity Quoted Tariff SCOD
Signed Tariff-
PHESFA
Pumped Hydro Storage(GWh) Capacity Lakh/MW SCOD
₹ 4.41 Signed
SECI (Kerala) Yes 0.5 Dec-2026
/ Annum
Lakh/MW/Month
Group Captive Yes 0.5 Various Sep-2026
MSEDCL Yes 12.0 ₹ 84.6 FY 2030
₹2.24
RVUNL Yes 0.5 Dec-2026
Lakh/MW/Month
UPPCL Yes 12.0 ₹ 77.2 FY 2031
KREDL (Solar + BESS) Yes 0.1 ₹ 4.31/KWh Jan-2027
FDRE Yes 0.1 ₹ 4.98/KWh Jul-2027
Total Pumped Hydro Storage:
Total BESS: Under- 24.0
1.7 Under-construction
construction
SECI (Rajasthan) - 1.0
PCKL 2.4
SECI XV (Solar + BESS) - 0.5
Total Pumped Hydro Storage Inc. Pipeline 26.4
Total BESS incl. Pipeline 3.2
BESPA: Battery Energy Storage Purchase Agreement | PHESFA: Pumped Hydro Energy Storage Facility Agreement
Projects yielding better than mid-teen returns in storage
JSW Energy Q1 FY27 Results Presentation
23
Energy Storage – Pump Storage Project updates
Tariff-
Tariff- PHESFA Capacity
PHESFA Capacity Pumped Hydro Storage(GWh) Lakh/MW/ SCOD
Pumped Hydro Storage(GWh) Lakh/MW/ SCOD Signed (GWh)
Signed (GWh) Annum
Annum
MSEDCL (1,500 MW) Yes 12.0 ₹ 84.6 FY 2030 UPPCL (1,500 MW) Yes 12.0 ₹ 77.2 FY 2031
Bhavali PSP (1,500 MW)
Kandhuara PSP (1,680 MW)
Civil Work and Construction Civil Work and Construction
• Progressing, on track with completion of Phase I power supply
• Award process for civil and electromechanical works is underway
• Water supply infrastructure has achieved >55% progress; pontoon
foundation works completed
Environment and Forest Clearance
Environment and Forest Clearance
• Secured EAC recommendation for Environmental Clearance from
• Formal EC approval letter received in June-2026 MoEF&CC
• Forest Clearance- Stage-I approval received in Jun-2026 • Application for Forest clearance submitted
Grid Connectivity
Grid Connectivity
• Grid connectivity milestone achieved with receipt of in-
• Connectivity Application Submitted to UPPTCL – Under Process
principle approval from MSETCL at 400 kV level
24
Safety & Sustainability
Agrivoltaics at Vijayanagar
Sustainability in every action — harmonizing farming with clean energy generation
Solar Power Plant, Vijayanagar
Sustainability: Framework and Policies
17 Focus Areas with 2030 Targets - from 2020 as Base Year Governance & Oversight by
Sustainability Committee
Climate Change Renewable Power Biodiversity
Independent Directors Mr. Sunil Goyal
▪ Committed to being carbon Enhance the renewable power No Net Loss for Biodiversity Ms. Rupa Devi Singh
neutral by 2050 to 2/3rd of our Total Installed
Executive Director Mr. Sharad Mahendra
Capacity
▪ Reduce our carbon emissions
by ~50%
ESG Ratings – best amongst peers
Waste Water Waste Water Resources
S & P Global (DJSI -ESG) : 82/100
Zero Liquid Discharge 100% Ash (Waste) utilization Reduce our water consumption
per unit of energy produced TPI: Level 5 (highest rating)
MSCI - “A”
FTSE4Good Index constituent
Operational Resources Social Local Indigenous Human Rights
Health & Safety Sustainability Considerations People
Carbon Neutrality by 2050
Committed to keep global warming to 1.5°C in line
with Paris Agreement - UN Climate Change
Supply Chain Employee Air Emissions Business Ethics Cultural Heritage Energy
Conference
Sustainability Wellbeing
Integrated Reporting since FY19
FY 2026 Annual Report
Aligned to National
Annual Reports
& International
Frameworks
ESG Data book
ESG Data book
JSW Energy Q1 FY27 Results Presentation
26
Sustainability: Targets and Strategy
Sustainability: Targets and Strategy
FY20 Improvement FY30
SD Targets Strategic Initiatives and Approach
Actuals (FY20 to FY30) Targets
• GHG Emissions • Increased share of RE for de-carbonization - Total RE operational capacity
Climate Change 0.76 48% 0.39
tCO e / MWh increased from 7,110 MW in Q1 FY26 to 8,668 MW in Q1 FY27
2
• TCFD/IFRS S2 risk assessment completed for the Ratnagiri thermal power plant,
with identified risk mitigation measures under implementation
• Water neutrality risk assessment completed at the Vijayanagar plant, with water
• Specific fresh
efficiency initiatives currently being implemented.
Water Security water intake 1.10 38% 0.68
(m3/MWh) • Dry robotic cleaning is implemented across most solar plants, saving nearly ~400
m³ of water daily
• Zero Waste to landfill certification in progress for the hydropower plant at Sholtu.
• Specific Waste
Waste (Ash) Generation 0.070 40% 0.042
(t/MWh)
• Sustainable waste management as per State Control Pollution Board guidelines
• WasteRecycled implemented at all plant locations
100 - 100
– Ash(%)
Specific process
• Ensuring ESP (Electrostatic Precipitator) Fields availability for lower PM emissions
AirEmissions emissions (Kg/MWh)
• PM 0.16 60% 0.064 • Optimizing lime dozing system efficiency to reduce SOx emission
• SOx 1.78 58% 0.75 • Boiler air and stack emissions monitoring in place to optimize efficiency
• NOx 1.01 54% 0.46
• Aiming to achieve No Net Loss of biodiversity by 2030, a comprehensive
• Biodiversity at
Achieve Biodiversity Management Plan is being implemented across major operational
Biodiversity our operating
‘no net loss’ of plants to support conservation and habitat enhancement.
sites as per
biodiversity
baseline 2020 • ESIA studies are currently underway for renewable energy plants to assess and
manage environmental and social impacts.
JSW Energy Q1 FY27 Results Presentation
27
Sustainability: Q1 FY27 Performance
Key Highlights Performance
▪ Supply Chain Sustainability Assessment for FY 2026-27 has been initiated in line with SEBI Ash Utilisation (%)
requirements. Critical Tier-1 suppliers will be assessed on sustainability parameters to
100% 100%
enhance ESG transparency, risk management and responsible sourcing.
Climate Change
▪ Addition of more than ~1.1 GW of RE capacity till YTD 27 has contributed to overall
reduced GHG emissions intensity
▪ Rainwater harvesting initiatives across major thermal, hydro and solar plants are
Q1 FY27 FY27
contributing to reduced freshwater consumption and enhanced water sustainability
Water Security Target
▪ Regular Recycling & Reuse of process water through Effluent Treatment Plants contributes
significantly for optimization of water consumption. CO2 intensity (tCO2e/MWh) PM Emissions (kg/MWh)
▪ STP (Sewage Treatment Plants) at all major plants are significantly contributing to waste 0.57 0.55 0.087
0.075
water utilization in horticulture
Waste
▪ Solid Waste disposal plant operationalized in Hydro-power plant at Sholtu, with compost
produced from waste being utilized across gardening and orchard initiatives
Q1 FY27 FY27 Target Q1 FY27 FY27 Target
▪ Real-time monitoring of boiler performance and stack emissions to drive operational
efficiency and emission compliance SOx Emissions (kg/MWh) NOx Emissions (kg/MWh)
Air Emissions ▪ Achieved 46% reduction in Particulate matters emissions from Apr 2020 baseline
▪ Achieved 29% reduction in NOx emissions from Apr 2020 baseline
0.72 0.75
1.75
1.60
▪ Around 4,000 saplings of diverse native species have been planted across JSW Energy
locations, supporting habitat restoration, enhancing biodiversity, and strengthening
ecosystem resilience
Biodiversity
▪ Environmental and Social Due Diligence (ESDD) and Environmental & Social Impact
Q1 FY27 FY27 Target Q1 FY27 FY27 Target
Assessment (ESIA) studies are underway across newly acquired renewable energy assets
to strengthen environmental and social risk management.
JSW Energy Q1 FY27 Results Presentation 28
Continued Focus on Health Safety Excellence
ContinuedFocusonHealth&SafetyExcellence
All Figures are for Q1 FY2027 Safety Culture in Action
Safety Performance
Leadership Safety Training Safety Week Celebrations at Thermal & MFG sites
• LTIFR - 0.05
Contractor Safety Management
• Integrated 100% of Contractor Field Safety Audits (CFSA) into the MySetu Safety platform
across thermal operations, with implementation currently in progress across all (RE) sites
• Contractor score card has been initiated at thermal sites to improve the safety performance
• Enhanced safety performance through periodic HSE reviews of partner facilities and
deployment of a robust HSE governance framework aligned with JSW Group standards
• Improved contractor safety standards through the completion of 106 CFSA audits across
project sites
Comprehensive Worker Training Programs at Project Sites
• 10+ sessions on Subject Matter Expert has been conducted at JSW Energy Vijayanagar,Halol &
Barmer on critical safety standards, 220+ employees has been participated.
• Monthly emergency rescue mock drill has been conducted across the thermal sites on various
scenario’s i.e. Electrical safety, Height work, Chlorine leak and Fire evacuation etc.
• Total 999 Trainings sessions covering topics like Subject Matter Expert (SME) – Management of
Change (MOC) and site based critical work at Renewable sites implemented
Emergency Response and Preparedness
JSW Barmer and Mahanadi plant has been honored with 18th CII National
• Hazardous Vehicle entry inspection system has been digitalized into VMS portal at Barmer site Awards and JSW Energy Ltd has been honored with the Golden Peacock Award
• In collaboration with State Fire Services and NDRC, capability-building sessions were
conducted to enhance emergency response readiness Benchmarking the Safety Culture of JSW Energy with Best Global
• National Fire Safety Week celebrated across all JSW Energy Thermal, Manufacturing, and
Organizations around the Globe
Renewable Energy (RE) sites
JSW Energy Q1 FY27 Results Presentation
29
Sustainability: Empowering Our
Communities
Sustainability: Empowering Our Communities
Sustainability: Empowering Our Communities
Skills and Livelihoods
Health and Nutrition
• Strengthened rural livelihoods in Ratnagiri through
• Provided 3,472 health consultations at the URJA Clinic in Ratnagiri,
agri-allied and dairy initiatives, with 8 trained
organized eye screening camps across four villages benefiting 122
Gopalas providing veterinary services to local
people, and supported healthcare infrastructure through medical
farmers and 100+ farmers supplying ~1,000 litres
equipment deployment at the Primary Health Centre in Bhadresh,
of milk daily through two collection centres.
Barmer
• 5,688 health consultations done through Mobile Health Unit
(MHU) in 20 villages of Tuticorin. • Continued support to 381 applique handicraft
artisans in Barmer, promoting sustainable
Water and Sanitation Initiatives
livelihoods and preserving traditional
• Improved rural water security by commissioning and handing craftsmanship.
over a water supply scheme to the Group Gram Panchayat of
Nandiwade, Ratnagiri, benefiting around 100 households.
• Strengthened women empowerment and skill
development through the formation of 8 Village
• JSW Barmer continued to supply piped drinking water which Development Committees (VDCs) in Maniyachi and
benefits about 4,000 community members vocational training at the CHARKHA Stitching
Training Centre in Sholtu.
Sports Promotion
Education
• Promoting grassroots sports development through four SHIKHAR
Boxing Centres in Himachal Pradesh, providing structured boxing • Improving English language skills among 2,050
and fitness training to 90 aspiring athletes students across 14 government schools in Tuticorin
through Language and Learning Programme
Driving community well-being through focused efforts in health, livelihoods, water, sanitation, and infrastructure
Our Core
Principles Health & Water, Environment& Waste Agriculture and Skills& Art,Culture & Sports
Education
Nutrition Sanitation Management Allied Livelihoods Livelihoods Heritage Promotion
JSW Energy Q1 FY27 Results Presentation
31
Growth Projects Operationalized
Sholtu, Himachal Pradesh
Tidong Hydro Commissioned Ahead of Schedule
Hydro Capacity Addition Execution Excellence PPA Tied up for 75 MW
• Commissioned 150 MW Tidong Hydro • COD achieved on 12th June ahead of • Long-term PPA with UPPCL for 75 MW
Project on Tidong river in Sutlej basin, Oct'26 guidance, capitalizing ongoing (May–October) at ₹5.57/kWh
Himachal Pradesh. hydro season, leading to incremental • Merchant optionality for the balance
• Generating synergies with Karcham EBITDA capacity
Wangtoo
JSW Energy Q1 FY27 Results Presentation
33
Strengthening Backward Integration Capabilities
Wind Blade Manufacturing Scale & Technology Competitive Advantage
• Commissioned wind blade • Annual capacity of up to 450 blades • Strengthens supply chain security, and
manufacturing plant at Halol, Gujarat, (~600 MW of wind projects); drives capex efficiencies, unlocking
strengthening vertical integration across manufactures 82-metre blades better project IRRs for wind generation
the wind energy value chain compatible with 4 MW WTGs projects
• Sizeable addressable market, given the
impetus on the wind
JSW Energy Q1 FY27 Results Presentation
34
Battery Assembly Plant- Pune
BESS Manufacturing Domestic Content Readiness BESS Order Book expansion
• Secured first large external order for a
• Well-positioned to comply with
• Stabilized the 5 GWh battery container 200 MW/400 MWh BESS project in July
potential domestic content
assembly plant in Pune, strengthening 2027— a step forward in the Company's
requirements for BESS through in-house
in-house manufacturing capabilities strategic expansion in the energy storage
manufacturing capabilities
segment
JSW Energy Q1 FY27 Results Presentation
35
ESG Data Profile
JSW Energy
ESG Data Profile
Investor Relations Contact:
ir.jswenergy@jsw.in
Capacity and Off taker Details: Installed + Under construction Portfolio
Capacity Addition Offtaker Profile (Installed + Under construction Portfolio)
Total Thermal Renewables HR, 1% WB, 11%
Capacity (MW) (A + B) (A) (B) Wind Solar Hybrid Hydro TN, 2% Others, 7%
UP, 4%
Installed Capacity 14,535 5,658 8,877 3,125 2,275 1,696 1,781 C&I, 5% Open, 4%,
(1.1 GW)
GJ, 3%
Percentage 100% 39% 61% 21% 16% 12% 12%
HP, 1%
28.1 GW
Under Construction 12,567 3,800 9,767 2,245 3,105 4,417 - MH, 7% Group Captive,
15% (4.1 GW)
Percentage 100% 28% 72% 17% 23% 33% - AP, 2%
KA, 4%
Installed + Under Construction Portfolio 28,102 9,458 18,644 5,370 5,380 6,113 1,781 TS, 2%
NTPC, 4%
SECI, 15%
% 100% 34% 66% 19% 19% 22% 6% SJVN, 6%
PTC, 4% RJ, 5%
Total Thermal Renewables
C&I (MW) Wind Solar Hybrid
(A + B) (A) (B)
C&I Portfolio Mix at Installed + Under construction Portfolio level
Installed Capacity 3,650 1,683 1,967 230 230 1,508
Group Captive C&I 2,958 1,683 1,275 129 53 1,093
Third party C&I 692 - 692 101 177 415
Group Captive
Under Construction Capacity 2,053 - 2,053 432 286 1,335
72%
Group Captive C&I 1,134 - 1,134 - 72 1,062
5.7 GW
Third Party C&I 919 - 919 432 214 273
Installed + Under Construction C&I 5,703 1,683 4,020 661 516 2,842 Third Party C&I
28%
Group Captive C&I 4,092 1,683 2,409 129 125 2,155
Third Party C&I 1,611 - 1,611 532 391 687
JSW Energy Q1 FY27 Results Presentation
*After inter-company adjustments and eliminations 37
Financial Results – Major Entities
Entity-wise Revenue from Operations
Particulars in ₹ Crore Q1 FY27 Q1 FY26
Standalone 1,101 916
JSW Energy (Barmer) 562 621
JSW Energy (Utkal) 516 604
Mahanadi 1,294 1,557
JSW Hydro Energy 250 339
O2 Power 480 244
Mytrah 431 473
JSW Renewable Energy (Vijayanagar) 189 124
JSW Renew Energy (SECI IX) 138 135
JSW Renew Energy Two (SECI X) 76 79
Kutehr 193 -
JPTL 11 11
Consolidated* 5,207 5,143
Entity-wise EBITDA (Including Other Income)
Particulars in ₹ Crore Q1 FY27 Q1 FY26
Standalone 500 443
JSW Energy (Barmer) 171 170
JSW Energy (Utkal) 227 264
Mahanadi 728 867
JSW Hydro Energy 235 315
O2 Power 308 219
Mytrah 387 519
JSW Renewable Energy (Vijayanagar) 176 118
JSW Renew Energy (SECI IX) 132 122
JSW Renew Energy Two (SECI X) 72 75
Kutehr 185 -
JPTL 10 11
Consolidated* 3,103 3,057
JSW Energy Q1 FY27 Results Presentation
*After inter-company adjustments and eliminations 38
Segment Wise Performance | Thermal
Ratnagiri TPP, Maharashtra Barmer TPP, Rajasthan Vijayanagar TPP, Karnataka Utkal TPP, Odisha
5,658 MW 3,800 MW 1,500 MW 10,958 MW
Installed Under-construction Pipeline + Under-acquisition Thermal Capacity
JSW Energy Q1 FY27 Results Presentation
39
Thermal Assets | Q1 FY27 (1/2)
Offtaker Profile Operational Assets (5,658* MW ) / Under-Construction, Pipeline & Acquisition (5,300 MW )
Others, 4%
Open, 7% Under-construction
UP, 21%
5,658
MH, 6%
MW
KA, 8%
Group
RJ, 21% Captive, 33% Ratnagiri (1,200 MW) Barmer (1,080 MW) Vijayanagar (860 MW) Utkal (700 MW) Mahanadi (3,600 MW) Salboni (3,200 MW)
1,200 MW 1,080 MW 860 MW 700 MW 1,800 MW - 2 PPAs of 1,600 MW
Installed Capacity
each with W.Bengal
discoms
Under-Construction / Pipeline - - - - 600 MW / 1,200 MW
- COD in phases from
FY30-FY32
PPA /Tied up 1,105 MW 1,080 MW 860 MW 639 MW^ 1,712 MW ^
Under-acquisition
Fuel Type Imported Coal Lignite Imported Coal Domestic Coal Domestic Coal
Maruti TPP (300 MW)
LT 1,481 MUs (-9% YoY) 1,312 MUs (-6% YoY) 898 MUs (-33% YoY) 805 MUs 1,924 MUs (-23% YoY) - Broad EV of ₹1,410 Cr
Net Generation
- LT PPA with Rajasthan
0f 8,029 MUs
discoms for 195 MW
Total 1,911 MUs (-7% YoY) 1,312 MUs (-6% YoY) 1,363 MUs (-5% YoY) 864 MUs (1% YoY) 2,559 MUs (-7%)
(net), 5% offtake to
Chattisgarh State at
LT 68%/(92%) 64%/(78%) 53%/(110%) 91%/(66%) 55%/(78%) Variable cost; 64 MW
PLF/(Deemed PLF) merchant exposure
- Est FY26 EBITDA: ₹
Total 79% 64% 79% 61% 70%
279 Cr
JSW Energy Q1 FY27 Results Presentation
#Salboni 3,200 MW under construction Project *Including 18 MW TPP at Nandyal ;^Factoring in 7.5% Auxiliary Consumption & power at Variable cost to state 40
Thermal Assets| Q1 FY27 (2/2)
Net Generation (MUs) Thermal : PLF – long term Operational Highlights
•
Total Net Generation down 6% YoY to 8.0
-6%
8,504
8,029
BUs, impacted by lower generation from
100%
84%
Short Term 79%
Mahanadi and Ratnagiri plants
63%
Long Term
•
81%, 6,874 80%, 6,441 Short Term generation de-grew 3% YoY to
Total
1.6 BUs, primarily driven by shift to LT tie-up
PLF Deemed PLF
in Utkal
Q1 FY26 Q1 FY27 Q1 FY26 Q1 FY27
•
Long Term generation decreased 6% YoY in
Segmental Revenue from Operations (₹ Cr) EBITDA excl. Other Income (₹ Cr) the quarter
Financial Highlights
-5%
3,622 -11%
3,453 1,569
•
1,392 Total operating thermal revenue at ₹ 3,453
Cr, down 5% YoY
•
EBITDA excluding other income declined
11% to ₹ 1,392 Cr
Q1 FY26 Q1 FY27 Q1 FY26 Q1 FY27
Thermal Generation impacted YoY due to one-off at Mahanadi
JSW Energy Q1 FY27 Results Presentation
41
Operational Performance – Thermal
Net Generation (MUs) PLF (%)
Location (Current Capacity) Capacity (%) Q1 FY27 Q1 FY26 Change YoY Q1 FY27 Q1 FY26
LT 92% 1,481 1,630 -9% 68 (*92) 74 (*91)
Ratnagiri (1,200 MW)
Total 100% 1,911 2,061 -7% 79 86
Barmer (1,080 MW) LT 100% 1,312 1,390 -6% 64 (*78) 70 (*78)
LT 100% 898 1,340 -33% 53 (*110) 100 (*100)
Vijayanagar (860 MW)
Total 100% 1,363 1,430 -5% 79 82
LT 95% 1,924 2,488 -23% 55 (*78) 72 (*98)
KSK Mahanadi (1,800 MW)
Total 100% 2,559 2,743 -7% 70 75
LT 100% 805 - NA 99 (*66) NA
Utkal (700 MW)
Total 100% 864 855 1% 61 61
Nandyal (18 MW) LT 100% 20 25 -18% 59 (*100) 71 (*100)
LT 85% 6,441 6,874 -7% 63 79
Total Thermal (5,658 MW)
Total 100% 8,029 8,504 -6% 71 76
JSW Energy Q1 FY27 Results Presentation LT : Long Term; ST: Short Term, NM : Not meaningful, * denotes Deemed PLF 42
Figures rounded off to nearest units digit
Segment Wise Performance | Renewables
Tuticorin, TN Jaisalmer, Rajasthan Vijayanagar , Karnataka Kutehr, Himachal Pradesh
8,877 MW 9,767 MW 2,761 MW 21,405 MW
Installed Under-construction Pipeline Renewable Capacity
JSW Energy Q1 FY27 Results Presentation
Renewable Assets | Q1 FY27 (1/2)
Off taker Profile Total Wind – 5,370 MW Hydro-1,781MW Solar–5,380 MW HHyybbrirdid––5,62,41123M MWW
18,644 MW
Operational 3,125 MW Operational 1,781 MW Operational 2,275 MW Operational 1,696 MW
Others,
Open,
HR, 3% 13%
3%
UP, 1% Group
C&I, 8% Captive,
14%
GJ, 5%
8,877 MW
HP, 3%
MH, 2%
SECI, Operational* Total Capacity | Operational Total Capacity | Operational Total Capacity | Operational Total Capacity | Operational
AP, 5% 8,877MW
20% AcquiredWind2,251 | 1,762 KarchamWangtoo1,091|1,091 AcquiredSolar2,325|1,789 Acquired Hybrid 1,435 | 507
KA, 4%
TS, 5% * As on 8th July SECIX 454 | 454 Baspa300|300 Barmer Group Captive 5 | 5 Group Captive 2,155 | 1,093
PTC,
RJ, 3% C&I 339|96
11% SECIIX 810 | 810 Kutehr 240 | 240 Vijayanagar Floating 20 | 20
Group Captive99|99 Tidong 150 Others28|28
Group Captive: 1,275 MW (14%) GUVNL 300 | 283
Pavagada 300 | 150
Under Total Capacity | Under construction Total Capacity | Under construction Total Capacity | Under construction
Construction
Acquired Wind 2,251 | 488 Acquired Solar 2,325| 536 Group Captive 1,926 | 1,062
9,767MW
SECI Projects 2,589 | 1,325 SJVN700 |700 MSEDCL 1,600 | 1,600
Adani Energy 250 | 250 SECIXIII700|700 Acquired Hybrid 1,435 | 928
C&I 182 | 182 NTPC700|700 FDRE IV 350 | 350
GUVNL300|17
C&I 339 | 243
Pavagada300|150
GUVNL 234|234
KREDL (Solar + BESS) 100 | 100
GroupCaptive/C&I202| 202
LT 2,220 MUs (3% YoY) 1,385 MUs (-23% YoY) 1,197 MUs (29% YoY)
Included in wind & solar
NetGeneration
Total 2,220 MUs (3% YoY) 1,423 MUs (-26% YoY) 1,197 MUs (29% YoY)
LT 27% 42% 21%
PLF (%)
Total 27% 40% 21%
JSW Energy Q1 FY27 Results Presentation All under construction projects are tied-up under long-term PPA
44
Renewable Assets |Q1 FY27 (2/2)
Installed Green Capacity (MW) Net Generation (MUs)
Capacity Addition
•
8,668 Capacity addition reached 1,081 MW till
7,110 4,990 July 8th (Q1FY27: +873 MW); 1,558 MW
4,840
of RE capacity commissioned in the 12-
Short Term
months ending Jun’26 period
(98%) (99%)
Long Term
4,878 4,802
Operational Highlights
Q1 FY26 Q1 FY27
Q1 FY26 Q1 FY27
•
Net RE generation during Q1 FY27
declined by 3% YoY due to softer hydro
PLF amid subdued hydrology
Segmental Revenue from Operations1 (₹ Cr) EBITDA excl. Other Income1 (₹ Cr)
+17%
1,740 Financial Highlights
+23%
1,492 1,485
•
Total operating RE revenue increased
1,212
17% YoY to ₹ 1,740 Cr driven by
contribution from both organic capacity
additions and O2 Power RE portfolio
•
Operating EBITDA in Q1 FY27 was up
Q1 FY26 Q1 FY27 23% YoY to ₹ 1,485 Cr
Q1 FY26 Q1 FY27
RE Capacity Expansion Drive EBITDA Growth
JSW Energy Q1 FY27 Results Presentation 1 Includes consolidation adjustments 45
Operational Performance – Renewables
Net Generation (MUs) PLF/CUF (%)
Location (Current Capacity) Capacity (%) Q1 FY27 Q1 FY26 Change YoY Q1 FY27 Q1 FY26
LT 93% 1,385 1,799 -23% 42 64
Hydro (1,781 MW)*
Total 100% 1,423 1,911 -26% 40 66
Solar (2,728 MW) ** LT 100% 1,197 925 29% 21 21
Wind (4,160 MW) ** LT 100% 2,220 2,154 3% 27 30
LT 99% 4,802 4,878 -2% NA NA
Total Renewables (8,668 MW)
Total 100% 4,840 4,990 -3% NA NA
LT : Long Term; ST: Short Term, Figures rounded off to nearest units digit. *Includes generation from hybrid capacities
JSW Energy Q1 FY27 Results Presentation
46
JSWHEL- Karcham Wangtoo & Baspa| Q1 FY27
Net Generation (MUs) PAF & PLF Operational Highlights
• Weaker hydrology impacted hydro
102% 100%
1,911
generation; output down 45% YoY to
Short Term 66%
Q1 FY26 1,059 MUs
1,059
94% Long Term 36%
Q1 FY27
1,799 100% Total • Plant Availability maintained at 100%
1,059
during Q1 FY27; continues to receive
Q1 FY26 Q1 FY27 PAF PLF
capacity charges
Segmental Revenue from Operations EBITDA (₹ Cr)
Financial Highlights
-25%
-26% 315 • JSW Hydro’s revenue and EBITDA declined
339
235 26% and 25% to ₹250 Cr and ₹235 Cr,
250
respectively, driven by weaker hydrology,
which impacted generation and sales
volumes
Q1 FY26 Q1 FY27
Q1 FY26 Q1 FY27 • Hydrology impact to be viewed as
Hydrology Weighed on Generation; Asset Availability Remained Strong transient; Capacity charge remain secure
JSW Energy Q1 FY27 Results Presentation
47