PSP Projects reported a challenging quarter with revenue declining 9% YoY, EBITDA down 29%, and PAT down 37%. Despite these declines, the company highlighted a strong order book of ₹5,081 crore, including notable wins in government and private sectors. Management emphasized growth drivers like precast capabilities, geographical expansion, and strategic project execution.
Scale of reported figures
Key financials
| Revenue from Operations | ₹357 crore | YoY -9% |
| EBITDA | ₹38.61 crore | YoY -29% |
| PAT | ₹22.95 crore | YoY -37% |
Segment commentary
Government Projects
Constituted 56% of the order book in Q2FY23 vs 68% in FY22.
Precast Factory
Order Book from Precast is ₹236.43 crore, with first order from L&T for National High Speed Rail project.
Guidance & outlook
- Focus on expanding geographical footprint into Uttar Pradesh, Rajasthan, Karnataka, and Maharashtra.
- Aim to increase precast capacity to 3 mn. Sq.ft.
Key takeaways
- Revenue and profitability declined YoY due to macroeconomic challenges.
- Strong order book reflects sustained demand despite short-term pressures.
- Precast facility expansion is a strategic growth driver for future projects.





Educational analysis only. Not investment advice. Consult a
SEBI-registered advisor before investing. Source: https://nsearchives.nseindia.com/corporate/PSPPROJECT_18102022143118_20221018_InvestorPresentation_62.pdf
Full transcript (5,548 words)
Ref No: PSPPROJECT/SE/62/22-23 October 18, 2022
Corporate Relations Department Listing Department
BSE Limited National Stock Exchange of India Limited
Floor 25, P.J. Towers, Exchange Plaza, Bandra Kurla Complex,
Dalal Street, Mumbai- 400 001 Bandra (East), Mumbai – 400 051
Scrip code: 540544 Scrip Symbol: PSPPROJECT
Dear Sir/Madam,
Subject: Investor Presentation for the quarter and half year ended September 30,
2022
Pursuant to Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements)
Regulations, 2015, please find enclosed herewith the Investor Presentation for the quarter
and half year ended September 30, 2022.
Kindly take the same on your record.
Thanking You,
Yours faithfully,
For PSP Projects Limited
Kenan Patel
Company Secretary and Compliance officer
Encl: As Above
Investor
Presentation
Q2 / H1FY23
October 2022
www.pspprojects.com
©2021 – PSP Project Ltd., All Rights Reserved. 1
Contents
PSP Projects Limited - Build to Last:
01
The growth story In a Nutshell
02 A look at the quarter gone by
03 Indian Construction Industry
04 The drivers that transcended PPLs growth since inception
Precast Factory:
05
Enhancing capabilities. Exploring newer technologies.
06 Investment Rationale
07 Project Profile
Key Strategy to strengthen the legacy of trust
08
associated with PSP Brand going forward
09 Awards and Recognition
©2021 – PSP Project Ltd., All Rights Reserved. 2
PSP Projects limited – Build to Last
The growth story in a Nutshell
§ Incorporated in 2008, successfully led by First Generation
As on 30 September 2022
Civil engineer having 36 years of experience.
1,500 / 18,000
§ India based construction company offering a diversified Workforce /
range of construction and allied services across industrial, Contract Labor (avg)
institutional, government, government residential, 196 49
₹5,081 crore
residential projects and precast. Completed On-going
Order Book* Projects Projects
₹1,850cr
§ Integrated EPC company across construction value chain
During H1FY23 FY22 Largest Project
from Design, Construction, Mechanical, Electrical, Plumbing
till Date
(MEP), Interior, O&M Services.
§ Geographically diversified with presence in six states viz.
₹1,512
Gujarat, Rajasthan, Karnataka, Uttar Pradesh, Maharashtra 13 ₹1,802 17 'CARE A+; Stable /
and New Delhi. crore Completed crore Completed CARE A1+
Order Inflow Projects Projects
Order Inflow Credit Rating
§ Listed on NSE and BSE on May 29, 2017, raising Rs.211.68
crore.
5-year CAGR
34.27%
§ In December 2021, Commissioned Precast facility in Gujarat Growth Rate 31.22% 31.21%
Revenue from
with the objective to provide Sustainable Building Solutions FY17-FY22 EBITDA PAT
Operations
and Technological Upgradation.
©2021 – PSP Project Ltd., All Rights Reserved. * Orders on Hand include Rs.236 crore of Precast 3
A Look at the
Quarter gone by
www.pspprojects.com
©2021 – PSP Project Ltd., All Rights Reserved. 4
Financial Performance during Q2/H1FY23
Q2FY23 Standalone Highlights
Revenue from Operations1 (₹ crore) EBIDTA1 (₹ crore) & EBITDA Margin (%) PAT1 (₹ crore) & PAT Margin (%)
YoY Growth -9% YoY Growth -29% YoY Growth -37%
60 40
50 55 35 37
390 30
40 47
25 29
39
30 20
23
357 20 15
345 10
10
5
- -
Q2FY22 Q1FY23 Q2FY23 Q2FY22 Q1FY23 Q2FY23 Q2FY22 Q1FY23 Q2FY23
H1FY23 Standalone Highlights
Revenue from Operations1 (₹ crore) EBIDTA1 (₹ crore) & EBITDA Margin (%) PAT1 (₹ crore) & PAT Margin (%)
YoY Growth -1% Y0Y Growth -9% Y0Y Growth -17%
96 64
94 62
92 94 60 62
708 58
90
56
88
54
86
52
702 84 86 50 51
82 48
80 46
H1FY22 H1FY23 H1FY22 H1FY23 H1FY22 H1FY23
©2021 – PSP Project Ltd., All Rights Reserved. Notes: (1) Numbers have been rounded off 5
Standalone Profit & Loss : Q2 / H1FY23
Particulars (₹ Lakhs) Q2FY23 Q2FY22 YoY (%) Q1FY23 QoQ (%) H1FY23 H1FY22 YoY (%)
Revenue from Operations 35,660.39 39,044.08 -9% 34,524.24 3% 70,184.63 70,779.66 -1%
Cost of materials consumed including WIP 8,046.56 12,946.80 10,206.57 18,253.13 22,851.37
Construction Expenses 20,994.03 18,549.75 16,889.27 37,883.30 34,422.94
Employee benefits expense 2,248.68 1,551.34 2,179.13 4,427.81 3,070.11
Other expenses 510.58 524.08 538.49 1,049.07 1,023.00
Total Operating Expenses 31,799.85 33,571.97 -5% 29,813.46 7% 61,613.31 61,367.42 0%
EBITDA 3,860.54 5,472.11 -29% 4,710.78 -18% 8,571.32 9,412.24 -9%
EBITDA Margin 10.83% 14.02% 13.64% 12.21% 13.30%
Other Income 833.40 461.83 561.65 1,395.05 841.13
Finance costs 704.93 376.48 559.40 1,264.33 717.51
Depreciation 905.89 703.04 872.35 1,778.24 1,244.95
Profit Before Tax and Exceptional Item 3,083.12 4,854.42 -36% 3,840.68 -20% 6,923.80 8,290.91 -16%
Exceptional Gain/(Loss)(net of tax) - - - - -
Profit Before Tax and after Exceptional Item 3,083.12 4,854.42 -36% 3,840.68 -20% 6,923.80 8,290.91 -16%
Tax Expense 790.81 1,195.40 991.73 1,782.54 2,123.12
Other comprehensive income 2.30 2.31 2.30 4.60 4.61
Profit After Tax 2,294.61 3,661.33 -37% 2,851.25 -20% 5,145.86 6,172.40 -17%
PAT Margin (%) 6.29% 9.27% 8.13% 7.19% 8.62%
Earnings Per Share (₹) 6.37 10.16 7.91 14.28 17.13
©2021 – PSP Project Ltd., All Rights Reserved. 6
Standalone Balance Sheet : H1FY23
Particulars (₹ Lakhs) H1FY23 FY22 Particulars (₹ Lakhs) H1FY23 FY22
ASSETS Equity
Non current Assets (a) Equity Share Capital 3,600.00 3,600.00
(a) Property, Plant and Equipment 19,795.06 20,601.82 (b) Other Equity 68,217.39 64,871.52
(b) Capital Work-In-Progress - Total Equity 71,817.39 68,471.52
(c) Other Intangible Assets 132.21 135.31 Non-Current liabilities
(d) Financial Assets (a) Financial Liabilities
(i) Investments 71.68 71.68 (i) Borrowings 2,077.17 1,718.07
(ii) Loans - (b) Provisions 212.58 151.87
(iii) Other Financial Assets 20,359.71 22,785.47 Total Non-Current Liabilities 2,289.75 1,869.94
(e) Deferred Tax Asset (Net) 1,011.50 937.57 Current Liabilities
(f) Other Non Current Assets 241.57 191.63 (a) Financial Liabilities
Total Non-Current Assets 41,611.73 44,723.48 (i) Borrowings 13,705.10 8,247.62
Current Assets (ii) Trade Payables
- Total outstanding dues of micro enterprises and small
(a) Inventories 11,426.66 8,064.91 893.14 1,284.41
enterprises
- Total outstanding dues of creditors other than micro
(b) Financial Assets 27,039.58 24,476.48
enterprises and small enterprises
(i) Trade receivables 28,038.48 31,177.92 (iii) Other Financial Liabilities 4,273.08 3,600.55
(ii) Cash and cash equivalents 8,267.10 8,758.63 (b) Other Current Liabilities 21,533.25 18,689.78
(iii) Bank Balances other than (ii) above 15,264.51 10,759.46 (c) Provisions 80.22 19.59
(iv) Loans 724.97 593.25 (d) Current Tax Liabilities (Net) - 0.73
(v) Other Financial Assets 18,552.34 13,339.23 Total Current Liabilities
67,524.37 56,319.16
(c) Other Current Assets 17,647.42 9,243.74 Total Liabilities
69,814.12 58,189.10
(d) Current Tax Assets (Net) 98.30 -
Total Current Assets 1,00,019.78 81,937.14 Total Equity and Liabilities
1,41,631.51 1,26,660.62
Total Assets 1,41,631.51 1,26,660.62
©2021 – PSP Project Ltd., All Rights Reserved. 7
Management Commentary on Key Quarterly Highlights
PSP Projects has once again recorded ‘Highest ever Order Book till
date of Rs.5,081 crore’. In comparison to all previous H1, the
We continued to grow organically by
company has received highest ever order inflow of Rs.1,512 crore in
focusing on executing projects in
H1FY23 as compared to Rs.637 crore during H1FY22, a growth of 137%
timely manner while maintaining
year on year.
consistent quality.
There were 14 projects awarded during the quarter:
1. Corporate Office Building Project by a leading multi-national company
of value Rs.290 crore.
2. Repeat order in Precast for National High-Speed Project from L&T of
value Rs.195 crore
3. Fore Court Development at Ahmedabad Airport of value Rs.128 crore
4. Repeat order to construct Phase II of Noodle plant by a leading multi-
national company of value Rs.115 crore.
5. Repeat order to construct manufacturing unit by a leading
pharmaceutical company of value Rs.99 crore
Mr. Prahaladbhai Patel
6. Archaeological museum of value Rs.97 crore awarded by Government
.
of Gujarat
CHAIRMAN, MD AND CEO
PSP PROJECTS LIMITED
During Q2FY23, completed 10 projects which includes High rise
commercial building in GIFT city, Corporate office building for Indian
Potash Limited, Four Precast projects, medical college & hospital in
Rajasthan, etc.. All the projects were completed in time. Total projects
completed till date totals to 196 projects.
©2021 – PSP Project Ltd., All Rights Reserved. 8
Annual Financial Performance
Revenue from Operations1 (₹ Crore) EBITDA1 (₹ Crore) PAT1 (₹ Crore)
#CAGR : 34% #CAGR : 31% #CAGR : 31%
161
1,749
257
1,499
129
1,241 191
1,044
90
149
135 81
730 702 64
101
86 51
41
401 66
FY17 FY18 FY19 FY20 FY21 FY22 H1FY23 FY17 FY18 FY19 FY20 FY21 FY22 H1FY23 FY17 FY18 FY19 FY20 FY21 FY22 H1FY23
Notes: # CAGR based on five years completing on 31.03.2022 (FY 22)
(1) Numbers have been rounded off
©2021 – PSP Project Ltd., All Rights Reserved. 9
Business Robustness in Numbers
EBITDA / Revenue from Operations Profit After Tax / Total Revenue
EBITDA Margin% PAT Margin%
14.7%
14.3%
13.9%
12.7%
12.2%
10.9%
9.1%
8.6% 8.5% 8.5%
7.2%
6.4%
FY18 FY19 FY20 FY21 FY22 H1FY23 FY18 FY19 FY20 FY21 FY22 H1FY23
©2021 – PSP Project Ltd., All Rights Reserved. 10
Prudent Working Capital Cycle in Construction Space
76
65 65
55 55
54
53
50
26 26
28
24
26
21
17
15
FY19 FY20 FY21 FY22
Inventory (Days) Receivable (Days) Payable (Days) Working Capital Cycle (Days)
©2021 – PSP Project Ltd., All Rights Reserved. Notes: (1) Numbers have been rounded off 11
Along with comfortable Leverage Position
FY19 FY20 FY21 FY22
Total Debt (₹ crore) 26 75 81 100
Networth (₹ crore) 371 457 538 685
Debt-Equity (x) 0.07 0.16 0.15 0.15
©2021 – PSP Project Ltd., All Rights Reserved. Notes: (1) Numbers have been rounded off 12
Indian Construction
Industry
www.pspprojects.com
©2021 – PSP Project Ltd., All Rights Reserved. 13
An Important growth driver of India’s Economy
Initiatives taken by GoI to bolster growth in construction sector
8%
Governments Push FDI Inflow
Construction Industry’s
§ High-speed bullet trains and metro rail, construction of Delhi- § The infrastructure and construction sector is
contribution to India’s GDP
Mumbai Industrial Corridor, concept of sustainable smart cities allowed for 100% foreign investment through
like GIFT City, hospitals and greenfield industrial smart city automatic route.
projects are contributing to India’s dynamic transformation
15.9%
§ GoI announced an ambitious project of adding 100 new
Growth airports by 2024
Consolidation
Industry is expected to register an § Pradhan Mantri Awas Yojana (PMAY) program, to provide
§ Consolidation in the private sector will further
annual growth of 15.9% in real
affordable housing to all urban poor by 2022
terms in 2021, following a decline intensify as stronger players will become more
of 12.3% in 2020. § National Infrastructure Pipeline (NIP) earmarked 7,400 projects stronger by gaining market share
focused on building roads, housing, urban development,
railways, conventional power, renewable energy, and irrigation.
$5tn § The extension of tax holiday up to March 2022 announced by
Pandemic induced Incentives
the Finance Minister to increase the supply of affordable
Economy
housing units § GoI has introduced favourable policies such as
GoI’s intent of lowering the bank guarantee requirement, faster
§ Allocated ₹ 6,450 crore in Union Budget 2021-22 for the Smart
becoming a $5tn economy clearance of bills, and speedier clearances /
Cities Mission
it plans to achieve through
approvals.
infrastructure development due to
the high multiplier effect
We believe that owing to healthy balance sheets, access to capital and many unlisted/weaker players being shunted out of
the market, the market share of large organized players is set to grow further in the next 2-3 years
©2021 – PSP Project Ltd., All Rights Reserved. 14
Drivers that transcended
PPLs growth since
inception
www.pspprojects.com
©2021 – PSP Project Ltd., All Rights Reserved. 15
Our Hybrid Approach with presence in Private and Public projects
Industrial Projects Institutional Projects Government Projects Government Precast
Residential Projects
Construction of industrial Construction of buildings for Undertake various challenging and Manufacture all elements of
buildings for pharmaceuticals, hospitals and healthcare prestigious real estate and Execution of prestigious residential- building and infrastructure
Tyre, Dairy, Engineering services, educational infrastructure projects spearheaded by cum-commercial projects, industry, such as Beams,
companies, etc. institutes, malls, hospitality the government and PSUs such as spearheaded by the government in Columns, Slabs, Load Bearing
services and corporate offices. CM’s Office, Riverfront Development,
the affordable housing category Walls, Partition Walls, Staircase,
Renovation of Vidhansabha Building.
under Mukhya Mantri GRUH Yojana. and Lift Cores, among others
63* 83* 26* 03* 17*
§ Total Order on Hand as on 30 September 2022:
₹ 5,081 crore
§ Government projects comprised 56% of the order
book in Q2FY23 vs 68% in FY22.
§ By diversifying skill sets and order book across
different projects, PSP Projects can pursue a
broader range of project tenders and consequently,
optimize business volume and profit margins
071
83
392 073
685,1
379
695
221,1
094
708,1
869,1
409,1
447 037
769 359
38
275
554 694
44
632
Residential Projects
Construction of private residential
buildings for group housing,
townships and independent houses
for select private customers.
04*
* Number of Projects Completed as on 30 September 2022
Oder Book across Private & Public
FY20 FY21 FY22 Q2FY23
Projects1 (₹ crore)
Industrial Institutional Government Govt. Resi. Residential Precast
©2021 – PSP Project Ltd., All Rights Reserved. Notes: (1) Numbers have been rounded off 16
Robust Order Book and Growing Pre-Qualification Credentials
Growing Order Book1 (₹ crore) Work on hand across Private and Public Projects
As on Q2FY23
5%
10%
5,081
4,324
4,121
37%
3,074
2,978
22%
2,559
7%
19%
FY18 FY19 FY20 FY21 FY22 Q2FY23
Government Govt Residential Industrial Institutional Residential Precast
©2021 – PSP Project Ltd., All Rights Reserved. Notes: (1) Numbers have been rounded off 17
Our Confidence to replicate the Success Story outside our Home State
§ Being headquartered in Ahmedabad, not only are we
Growing Geographical Footprint
strategically located in the core market of Gujarat but have
gradually expanded our presence to six different states of
India, establishing a pan-India presence.
As on Q2FY23
§ Now, PPL is present in six states viz. Gujarat, Rajasthan, UP,
Karnataka, New Delhi and Maharashtra.
14%
§ Initially, PPL established itself as a renowned name in the
construction space in Gujarat construction market, after 8
36%
years of operations only in 2016 did PPL hatch out of Gujarat.
0.5%
Badaun
§ Dairy Project for Bangalore Milk Union Limited in Karnataka New Delhi Lucknow
Kushinagar
and Medical College & Hospitals at two locations in Rajasthan Kanpur
Auraiya
are key projects completed outside the state of Gujarat.
Sultanpur
Varanasi
GandhinagarLalitpur Sonbhadra
Ahmedabad
Nadiad
Key on-going projects outside Gujarat (₹ crore) Jamnagar
Vadodara
Bhavnagar
Dahej Surat
UTTAR PRADESH: EPC projects for Medical
1 1,491
Colleges and Hospitals at 7 locations in Uttar Pradesh Bhiwandi 50%
Pandharpur
MAHARASHTRA: EWS Housing Projects in
2 759
Bhiwandi and Pandharpur
Gujarat Rajasthan
UTTAR PRADESH: Development of Shri Kashi Kanakpura
3 Vishwanath Dham and its Beautification Including All 398 Mandya Maharashtra UP
Development Works
4 UTTAR PRADESH: Affordable Housing project 238
Giving momentum to our strategy of geographical diversification, 50%
RAJASTHAN: Medical Colleges and Hospitals in
5 27 of order book are from markets other than Gujarat as on 30 September 2022
Rajasthan
©2021 – PSP Project Ltd., All Rights Reserved. 18
Belief, Trust and Support of our Customers
Proven Track Record Ethics & Trust Biggest Project
In delivering projects on-time and quality Strong work Ethics makes PSP a
Surat Diamond Bourse
projects, the faith and confidence rested by the favourable and preferred choice
clients can be assessed by esteemed projects and
repeat orders secured over the years. Worked with more than 100
private and public clients across India
PSP has repeatedly serviced projects for:
Zydus Cadila Group 29
Torrent Group 15
UP – Public Works Department 8
Sabarmati Riverfront 8
SDB is the world’s largest office building
Adani Group 7
on a single basement.
Claris Group 6
It’s a ₹1,850 Crore project, size of 66 lakh sq. ft.
Road & Building, Gujarat 4
With completion of this project, PPL will enter
Reliance 2
the big league of handling prestigious projects
Intas Group 2
up to ₹2,500* crore
As on FY22
©2021 – PSP Project Ltd., All Rights Reserved. 19
Clientele with High Quality Business
Work on Hand as on 30 September 2022 - (Major Projects) | [₹ Crore]
Outstanding
Description of Project Location Name of the Client Contract value
Contract Value
Medical Colleges & Hospitals at 7 Locations Uttar Pradesh Public Works Department 1,491 1,239
EWS Housing Project Maharashtra Municipal Corporation 601 601
Sports Complex Gujarat Municipal Corporation 504 488
Corporate Office Building Gujarat Institutional
290 290
Residential Project Gujarat Private Company 252 240
Residential Buildings of PAC Mahila Battalion
Uttar Pradesh Public Works Department 239 224
at Badaun, UP
Residential Project Gujarat Adani Estate Management Pvt. Ltd. 349 210
Precast Order for National High Speed Project Gujarat L&T 195 195
Construction Of Steel Plant Gujarat Private Company 257 145
Fore Court Development at Ahmedabad
Gujarat Private Company 128 128
Airport
Noodle Factory Phase II Gujarat Industrial 115 115
Total 4,421 3,876
©2021 – PSP Project Ltd., All Rights Reserved. 20
The Team that made PPL fulfil its ambitions
Ably Supported by Experienced Professionals
Mahesh Patel Maulik Patel Hetal Patel Viplav Shah Girish Ramkumar
Senior Vice President - Operations Vice President - Procurement Chief Financial Officer Vice President - Planning Vice President - HR
§ Holds a diploma in civil § Attended the course for § Member of the Institute of § Diploma in Construction § Master Of Arts - Political
engineering bachelor’s degree in commerce Chartered Accountants of India Technology from School of Science) From Karnataka Stare
and holds a masters degree in Building Science & Technology Open University. An MBA from
§ Heads the project operations of § Heads the procurement,
commerce from Gujarat (Currently CEPT University) and Indian Institute of Management
our company, management of plants and
University Management Education (IIM), Kozhikode in 2014.
machineries and form works.
§ He has been an instrumental Program from IIM Ahmedabad.
§ Also a certified internal auditor § He brings with him nearly 24
part of all the projects § He has been associated with
from the Institute of Internal § He brings 25 years of years of diverse experience in
completed by PSP Projects till the company since inception
Auditors (USA) experience in the construction diverse Industries
date. and played a pivotal role in
field.
PPL’s growth. § With our company since the § He brings 25 years of
§ He has been with the company
past 8 years experience in the construction
since inception
field.
©2021 – PSP Project Ltd., All Rights Reserved. 21
The Team that made PPL fulfil its ambitions
Ably Supported by Experienced Professionals
Ramjibhai Parmar Pratik Thakkar Kenan Patel Sanjay Kumar Rai Pushpesh Singh
General Manger - Tender General Manager - BD Company Secretary and Sr. Manager - SAP/IT Dy. General Manager – Contracts
Compliance Officer
§ Ramjibhai Parmar is the § Pratik Thakkar is General § Associate member of the § Sanjay Kumar Rai is the Senior § Pushpesh Singh is Manager –
General Manger - Tender of Manager - Business Institute of company SAP/IT Manager at our Contracts of our company
our company Development of our company Secretaries of India (ICSI) company
§ Bachelor’s degree in civil
§ Diploma in civil engineering § Attended the course for § Holds a bachelor’s degree in § Attended the course for engineering from Gujarat
bachelor’s degree in commerce law from Gujarat University bachelor’s degree in science University
§ Associated with our company
and diploma in marketing from Ch. Charan Singh
for the past 10 years § 7 years of experience in all § 12 years of experience in
management University (Meerut) and
Company Secretarial functions construction industry
completed honours diploma in
§ Experience in Business and Compliances
computer from NIIT § 8 years of experience with
Development
Larsen & Toubro
§ Experience in IT and SAP
§ Associated with our company
support across Packing,
for the past 7 years
Chemical, Textile, Steel and
Automobile industry
§ Working with our company
since 2018
©2021 – PSP Project Ltd., All Rights Reserved. 22
Leadership and Management
Prahaladbhai Patel Pooja Patel Sagar Patel Sandeep Shah Vasishtha Patel Achala Patel
Chairman, MD and CEO Whole Time Director Executive Director Independent Director Independent Director Independent Director
He has a bachelor’s degree in She has a bachelor’s degree in He has a bachelor’s degree He has a double bachelor’s He has a bachelor’s degree She is a Post Graduate and
civil engineering from Saurashtra civil engineering from Gujarat in civil engineering from degree in commerce and law in business administration M.Phil from school of
University, and has been working Technological University and a Gujarat Technological from Gujarat University. He is from Sardar Patel University languages, Gujarat
in the civil construction space by post-graduate diploma in University. He is actively currently a director of Creative and a master’s degree in University. She is Gold
way of a proprietorship business, financial management from involved in project planning, Infotech Private Limited. He has business administration Medallist and 1st rank
before the incorporation of PSP Ahmedabad Management project tendering, contracts, many years of experience in the from South Gujarat holder at University level at
Projects Limited. He has an Association. She has been and execution of projects. business of information University. Over 20 years of both her Graduation and
experience of 36 years in the actively involved in planning of technology products and experience he has had in Post-Graduation levels. She
construction space, and has projects, procurement of services. management and exports, is a founder and Designated
played a significant role in the materials and execution of he has held managerial Partner of MAP Power LLP
growth of PSP Projects since its projects for PSP Projects positions in international and Chopper Worx
incorporation. He has been Limited since 2015. She has also division of several Construction LLP. She is
featured in the book titled represented PSP Projects in companies. He is currently a actively involved in the
‘Business Game Changers: Indian Concrete Institute Managing Director of business of high voltage
Shoonya se Shikhar’ authored by Chapter-1, Ahmedabad. Multico Exports Private power transmission
Prakash Biyani. Limited, which is involved in representing few European
the export of companies in India and in
pharmaceuticals and raw few neighbouring countries
materials. since more than 16 years.
©2021 – PSP Project Ltd., All Rights Reserved. 23
Our 14 years of Journey of Constructing Buildings
Started Operations in Uttar
Pradesh with a marquee
SAP Implementation projects "Beautification of
Sri Kashi Vishwanath Dham"
Started Operations in
Karnataka & Rajasthan
Started Turnkey
Awarded project for Projects Started Construction
work for Beautification of PSP's Precast
Incorporation of riverfront Manufacturing unit
2008 2009 2010 2011 2014 2015 2016 2017 2020 2021
PSP Projects Listed
Acquired business
on NSE & BSE
of BPC Projects Awarded order to Awarded 7 Medical
construct 72-Meter- Started design & College & Hospitals
High Hospital, build (EPC) project for on EPC Basis in UP
Ahmedabad Affordable Housing in
Commissioned the
Ahmedabad
Awarded project to precast factory and
construct Medical received first order
College & Hospital from L&T
Awarded project for
for Leading Medical
Inauguration of
Socitey, construction of CM’s office Awarded Surat Diamond
1st Order inside the first Kashi Vishwanath
Ahmedabad Bourse Project
Smart City - GIFT City, Later Dham by
PSP did 6 Projects in GIFT Honourable PM
Narendra Modi ji
©2021 – PSP Project Ltd., All Rights Reserved. 24
Precast Facility
Enhancing capabilities. Exploring newer technologies
A state-of-the-art manufacturing plant of precast concrete building. Benefits of Precast
Manufacturing Facility
Production Capacity
Phase I
§ Reduces labour-intensive
1 Mn. Sq. ft.
traditional building methods by
way of maximum prefabrication
and use of cutting-edge
Spread across technology,
60 Acres
§ Thereby reducing turnaround time
for projects,
Project Cost § Unlocks the best land potential,
₹109 Crore
§ Helps in delivering consistent
quality,
§ Precast enables manufacturing all elements of building and infrastructure industry, such as Beams, Columns,
§ Helps to increase operating
Slabs, Load Bearing Walls, Partition Walls, Staircase, and Lift Cores, among others.
efficiency and margins.
§ Going forward the precast capacity will be increased to 3 mn. Sq.ft.
§ Order Book from Precast is to the tune of ₹ 236.43 crore. First Order received was from L&T to the tune of ₹ 49
crores as part of National High Speed Rail project. Balance orders are from Residential and Industrial segments.
Offsite Modular Construction Technology is the future to achieve seamless quality,
speed in delivery and larger volumes in a controlled environment.
©2021 – PSP Project Ltd., All Rights Reserved. 25
Precast Factory
©2021 – PSP Project Ltd., All Rights Reserved. 26
Investment Rationale
One-stop shop solution construction company present throughout the value chain starting from planning, design, construction and
post-construction services including MEP work and other interior fit-outs which provides us with several opportunities, faster
project turnaround time & higher ticket size.
With proven track record, financial discipline, multi vertical presence, large equipment base and cutting-edge technologies, the
company has managed to create a strong brand recall synonymous with trust.
Execution capabilities have grown significantly with time, both in terms of the size of projects that we bid for and execute, and the
number of projects that we can execute simultaneously, upon successful completion of SDB, PSP becomes eligible to bid for larger
value projects.
Prudent financial performance, Comfortable leverage position at 0.15 times (incl. mobilization advance), giving sufficient room to
raise debt in the future. Despite being WC intensive, the company has comfortable WCC at 28 days.
At the helm is an Experienced, Skilled and Passionate first-generation entrepreneur whose passion to build quality buildings
aided PSP to attain manifold growth along with support and dedication of experienced team and Process driven approach followed
by PSP.
©2021 – PSP Project Ltd., All Rights Reserved. 27
Project Profile
Prominent Projects Completed in FY22
NOODLE FACTORY PROJECT IN GUJARAT SPORTS COMPLEX FOR AHMEDABAD UNIVERSITY HOSPITAL PROJECT IN UDAIPUR RAJASTHAN
INTERIOR FIT-OUT AT LEELA HOTEL, GANDHINAGAR ZYDUS HOSPITAL, BARODA AUDA LIBRARY, AHMEDABAD
©2021 – PSP Project Ltd., All Rights Reserved. 28
Landmark Projects – Kashi Vishwanath Dham
©2021 – PSP Project Ltd., All Rights Reserved. 29
Landmark Projects – Surat Diamond Bourse
Actual image October.22
©2021 – PSP Project Ltd., All Rights Reserved. 30
Landmark Projects– Surat Diamond Bourse
Actual image October.22
©2021 – PSP Project Ltd., All Rights Reserved. 31
Prominent Projects – Smart City
Prestige Fintech
IBIS Hotel by Brigade
World Trade Center
BSE Brokers Forum
Brigade International Finance Center
The Signature by Hiranandani
©2021 – PSP Project Ltd., All Rights Reserved. 32
Prominent Projects
ZYDUS HOSPITAL SITAPUR (EPC PROJECT)
MEDICAL COLLEGE & HOSPITAL AT DAHOD
BEAUTIFICATION OF AHMEDABAD C.G.ROAD R&D AND RESEARCH CENTERS IN GUJARAT
(EPC PROJECT)
©2021 – PSP Project Ltd., All Rights Reserved. 33
Prominent Projects
COMMERCIAL BUILDING AT GIFT CITY ZYDUS CORPORATE HOUSE AT AHMEDABAD PUNISKA HEALTHCARE PLANT
BANGALORE MILK UNION DAIRY PLANT AT GRAND MERCURY HOTEL AT GIFT CITY MEDICAL COLLEGE AND HOSPITAL FOR
KANAKPURA, KARNATAKA FOR BRIGADE GROUP DHARAMSINGH DESAI UNIVERSITY (DDU)
©2021 – PSP Project Ltd., All Rights Reserved. 34
Prominent Projects
BRIGADE INTERNATIONAL
GOVERNMENT OFFICE BUILDING RIVER FRONT DEVELOPMENT HOSPITAL PROJECT
FINANCIAL CENTRE AT GIFT CITY
ZYDUS HOSPITALS DAIRY PROJECT AFFORDABLE HOUSING PROJECT GOVERNMENT PROJECT
©2021 – PSP Project Ltd., All Rights Reserved. 35
Key Strategies
www.pspprojects.com
©2021 – PSP Project Ltd., All Rights Reserved. 36
Key Strategies
Building is my
Focus on Building construction
(commercial, residential, industrial & institutional)
passion
Leverage our position
Strengthen our
Mr. Prahaladbhai Patel
as a fast-growing
human capital
Chairman, MD and CEO construction
company in India
Enhance our project
Expand our geographical
execution capabilities –
footprint, projects in UP,
In Sync with the latest
Rajasthan, Karnataka and
Technology
Maharashtra
Augment customer relationships and
optimize our project mix
©2021 – PSP Project Ltd., All Rights Reserved. 37
Awards and
Recognition
www.pspprojects.com
©2021 – PSP Project Ltd., All Rights Reserved. 38
Awards and Recognition
PSP Projects Ltd has been awarded as Fastest Growing Construction Company PSP Projects Ltd has been awarded as India’s Top Challengers during the
(below 2000 Cr Category) during the Construction World Annual Awards 2022 Construction World Annual Awards 2021
©2021 – PSP Project Ltd., All Rights Reserved. 39
Awards and Recognition
PSP Projects Ltd has been awarded as 2nd Fastest
Growing Construction Company (below 2000 Cr Times Inspiring Entrepreneur Award for the Fastest
Patidar Udhyog Ratna Award by Sardardham 2020
Category) 3rd year in a row during the Construction Growing Construction Company of the Year 2020
World Annual Awards 2021
ICI-Ultratech Outstanding Structure Awards 2020 ICI-Ultratech Outstanding Structure Awards 2020 ICI-Ultratech Outstanding Structure Awards 2020
(State) in the category – Commercial (Regional) in the category – Institutional (Regional) in the category - Mass Housing
awarded to our project “ONE42" awarded to our project – “Lilavati Library at CEPT" awarded to our project “GHB Naranpura"
©2021 – PSP Project Ltd., All Rights Reserved. 40
Safe Harbor Statement
This document does not constitute or form part of and should not be construed as an offer to sell or issue or the solicitation of an offer to buy or acquire securities of the Company or any of
its subsidiaries or its joint ventures or affiliates in any jurisdiction or as an inducement to enter into investment activity. No part of this document, nor the fact of its distribution, should form
the basis of, or be relied on in connection with, any contract or commitment or investment decision whatsoever. This document is not financial, legal, tax or other product advice.
This document has been prepared by the Company based on information available to them for use at a non-deal road show presentation by the Company for selected recipients for
information purposes only and does not constitute a recommendation regarding any securities of the Company or any of its subsidiaries or its joint ventures or affiliates. The information has
not been independently verified. No representation, warranty, guarantee or undertaking (express or implied) is made as to, and no reliance should be placed on, the accuracy, completeness
or correctness of any information, including any estimates, targets and opinions, contained herein, and no liability whatsoever is accepted as to any errors, omissions or misstatements
contained herein and, accordingly, none of the Company, its advisors and representative and any of its or their affiliates, officers, directors, employees or agents, and anyone acting on behalf
of such persons accepts any responsibility or liability whatsoever, in negligence or otherwise, arising directly or indirectly from this document or its contents or otherwise arising in
connection therewith.
The Company may alter, modify or otherwise change in any manner the contents of this document, without obligation to notify any persons of such change or changes.
This document contains certain supplemental measures of performance and liquidity that are not required by or presented in accordance with Indian Accounting Standards or Indian GAAP,
and should not be considered an alternative to profit, operating revenue or any other performance measures derived in accordance with Indian Accounting Standards or Indian GAAP or an
alternative to cash flow from operations as a measure of liquidity of the Company.
The statements contained in this document speak only as at the date as of which they are made, and the Company expressly disclaims any obligation or undertaking to supplement, amend
or disseminate any updates or revisions to any statements contained herein to reflect any change in events, conditions or circumstances on which any such statements are based. By
preparing this presentation, none of the Company, its management, and their respective advisers undertakes any obligation to provide the recipient with access to any additional information
or to update this presentation or any additional information or to correct any inaccuracies in any such information which may become apparent.
This presentation is not an offer of securities for sale in the United States. Securities may not be offered or sold in the United States absent registration or an exemption from registration.
This presentation contains forward-looking statements based on the currently held beliefs and assumptions of the management of the Company, which are expressed in good faith and, in
their opinion, reasonable. Forward-looking statements involve known and unknown risks, uncertainties and other factors, which may cause the actual results, financial condition,
performance, or achievements of the Company or industry results, to differ materially from the results, financial condition, performance or achievements expressed or implied by such
forward-looking statements. Given these risks, uncertainties and other factors, recipients of this document are cautioned not to place undue reliance on these forward-looking statements.
By accessing this presentation, you accept that this disclaimer and any claims arising out of the use of the information from this presentation shall be governed by the laws of India and only
the courts in Ahmedabad, Gujarat, India and no other courts, shall have jurisdiction over the same.
©2021 – PSP Project Ltd., All Rights Reserved. 41
For more information please contact:
Thank You
PSP Projects Limited Ernst & Young LLP
Hetal Patel Krishna Patel / Vikash Verma
grievance@pspprojects.com krishna.patel2@in.ey.com
✉ ✉
vikash.verma1@in.ey.com
✉
PSP Projects Limited
‘PSP House’, Opp. Celesta Courtyard, Opp. Lane of Vikramnagar Colony, Iscon-Ambli Road, Ahmedabad - 380058
NSE: PSPPROJECT | BSE: 540544 | ISIN: INE488V01015
© 2020 PSP Projects Limited, All Rights Reserved.
“PSP Projects” and The PSP Projects Logo are trademarks of PSP Projects Limited. In addition to Company data, data from market research agencies, Stock Exchanges and industry publications has been used for this presentation. This material was used during an oral presentation; it is not
a complete record of the discussion. This work may not be used, sold, transferred, adapted, abridged, copied or reproduced in whole on or in part in any manner or form or in any media without the prior written consent. All product names and company names and logos mentioned
herein are the trademarks or registered trademarks of their respective owners.
©2021 – PSP Project Ltd., All Rights Reserved. 42