rs,
y Towers Dalal Street Mumbai-400 001. To Scrip Code : NLCINDIA Scrip Code : 513683 Dear Sirs, As required under Regulation 30 of LODR, we furnish herewith the copy of the Presentation given du
30.6 MT
ond Mining.....Beyond Energy....... NLCIL Overview 6. Power Trading a 1. Lignite Mining 30.6 MTPA \ 5. Coal Mining 20 MTPA NLCIL 3 e h T n i h P ) y y F A t f 2. Thermal Power 364
20 MT
... NLCIL Overview 6. Power Trading a 1. Lignite Mining 30.6 MTPA \ 5. Coal Mining 20 MTPA NLCIL 3 e h T n i h P ) y y F A t f 2. Thermal Power 3640 MW Lignite Based 4. Rene
3640 MW
MTPA \ 5. Coal Mining 20 MTPA NLCIL 3 e h T n i h P ) y y F A t f 2. Thermal Power 3640 MW Lignite Based 4. Renewable Power . ‘ 1421 MW ae « A i , 3. Consultancy for MDO
1421 MW
n i h P ) y y F A t f 2. Thermal Power 3640 MW Lignite Based 4. Renewable Power . ‘ 1421 MW ae « A i , 3. Consultancy for MDO and Solar PAN (i), PRESENC
2.1 MT
MDO and Solar PAN (i), PRESENCE La Tr ad Helcaa Lignite Mines — 2.1 MTPA Lignite based TPS — 2 x 125 - 250 MW a Tamil Nadu Corporate Office = = = " Lignit
250 MW
PAN (i), PRESENCE La Tr ad Helcaa Lignite Mines — 2.1 MTPA Lignite based TPS — 2 x 125 - 250 MW a Tamil Nadu Corporate Office = = = " Lignite Mines — 28.50 MTPA Lignite based TPS
28.50 MT
e based TPS — 2 x 125 - 250 MW a Tamil Nadu Corporate Office = = = " Lignite Mines — 28.50 MTPA Lignite based TPS - 3390 MW Coal based TPS — 1000 MW Solar: 1350 MW " Wind-51 MW " Coal
3390 MW
a Tamil Nadu Corporate Office = = = " Lignite Mines — 28.50 MTPA Lignite based TPS - 3390 MW Coal based TPS — 1000 MW Solar: 1350 MW " Wind-51 MW " Coal based TPS — 1980 MW : Coal
1000 MW
ffice = = = " Lignite Mines — 28.50 MTPA Lignite based TPS - 3390 MW Coal based TPS — 1000 MW Solar: 1350 MW " Wind-51 MW " Coal based TPS — 1980 MW : Coal Mine -9 MTPA | Coal Min
1350 MW
" Lignite Mines — 28.50 MTPA Lignite based TPS - 3390 MW Coal based TPS — 1000 MW Solar: 1350 MW " Wind-51 MW " Coal based TPS — 1980 MW : Coal Mine -9 MTPA | Coal Mine — 20 MTPA a
51 MW
nes — 28.50 MTPA Lignite based TPS - 3390 MW Coal based TPS — 1000 MW Solar: 1350 MW " Wind-51 MW " Coal based TPS — 1980 MW : Coal Mine -9 MTPA | Coal Mine — 20 MTPA a f i ‘é An
Guidance — 7 items
Registered Office
opening
7 GHATAMPUR THERMAL POWER PROJECT (GTPP) V5-— snronere Capacity 3 X 660 MW (1980 MW) Sanctioned Cost Total Cost: = 17,238 Cr RCE: = 19544 Cr (To be approved) Cc letion ompremon Dat eae Scheduled Unit I: 26.11.2020 Unit II : 26.05.2021 Unit III : 26.11.2021 Anticipated 31.03.2023 31.07.2023 30.11.2023 Promoters NLCIL (51%) & UPRUVNL (49%) PPA UP Power Corporation Ltd (UPPCL) Validity of PPA from COD : 75 % : 25 years Estimated Tariff based |.
Registered Office
opening
Activities Under Way to Start Coal Production by Sep-2023 EC: Public Hearing completed EIA/EMP: Report Completed, EC under process FC: Proposal under process Tree enumeration Completed FR: Final FR under process Rail Infrastructure: Final DPR to Eastern Railway under approval “& ny 7 NLC Talabira Thermal Power Project (4 X 800 MW) TS me Project Type Project Phase Supercritical Thermal Power Plant (Coal Based) 3 X 800 MW (1* Phase) And 1 X 800 MW (274 PHASE) Estimated Project Cost Rs 19422 Cr.
Registered Office
opening
Tariff Levetze Tariff: Rs 4.25/Unit (FC: Rs 2.17/ Unit, EC: Rs 2.08/ Unit) Power Allocation 526 MW PPA signed with TANGEDCO Remaining capacity is being taken up with MOP for allocation to TANGEDCO S (AS cA’s 150 MW HYBRID (50 MW WIND & 100 MW SOLAR) ae Jeg Tariff Discovered during e-RA Min CUF as per RfS NLCIL Bid CUF : & 2.34/Unit : 30% : 31.3% Likely Project Cost : % 876.53 Cr.
Registered Office
opening
é Ae 3 FORWELLBEING LIGNITE TO METHANOL 7g a Sty Hele Coal Filter Pulverized coal y — Sour gas Project Highlights O O O 0 o O o O Pilot Plant capacity 0.40 MTPA Estimated Project cost: Rs.4,394 Cr The quantity of lignite required is 2.26 MTPA Expected date of LoA: September-2023 The total period of Project is 42 months from the date of LOA o The Project is expected to complete by March-2027 nl?
Registered Office
opening
Project — Current Status | Raw coal Hopper Dry Gas Niort CO, Lock Hopper Slag Evaportive hot-water one o o o DFR prepared by M/s PDIL & Financial appraisal by M/s SBI Caps approved by Board.
Registered Office
opening
Project implementation mode: Lump-Sum Turn Key (LSTK) NLCIL engaged M/s EIL as Project Management Consultant for implementation ae FORWELLBEING wa Jharna gear COMMERCIAL COAL BLOCK ~ os Sty Hele r fi s s Rampia & dip side of Rampia Dinnatehal HORA = “te ~~ Z t B} = Mahulpali ® ' Kulabira Ujalpur Tangarmun yz ‘
Sundarg
opening
Project area in Ha Capacity of Mine Proposed in MTPA Life of Mine in Years Mineable reserves in MT Stripping Ratio Project cost in Cr Financial IRR in % 4841.99 11.50 35 386.87 1: 7.35 3740.63 11.54 Average Lignite Transfer price in Rs./tonne 1648.00 Linked end use plants op MW OX 600) Anticipated year of Lignite Production 2026 SR EA?
Advertisement
Speaking time
Registered Office
1
Sundarg
1
Opening remarks
Registered Office
No.135, EVR Periyar High Road, Kilpauk, Chennai-600 010. Corporate Office : Block-1, Neyveli-607 801, Cuddalore District, Tamil Nadu. CIN : L93090TN1956GOI003507, Website: www.nicindia.in email: investors@nicindia.in Phone: 044-28360037, Fax: 044-28360057 Arnrit Mahotsav Lr.No.Secy/Reg.30 of LODR/2022 Dt. 05.07.2022 To The National Stock Exchange of India Ltd | The BSE Ltd Plot No. C/1, G Block Bandra-Kurla Complex Bandra (E), Mumbai-400 051. Phiroze JeeJeebhoy Towers Dalal Street Mumbai-400 001. To Scrip Code : NLCINDIA Scrip Code : 513683 Dear Sirs, As required under Regulation 30 of LODR, we furnish herewith the copy of the Presentation given during the analyst meeting held on 5® July 2022 for your reference and record. Thanking you, Yours faithfully, for NLC India he Compan Secrets, ‘ NLC INDIA LTD oe | || & Analyste Meet Investors Beyond Mining.....Beyond Energy....... NLCIL Overview 6. Power Trading a 1. Lignite Mining 30.6 MTPA \ 5. Coal Mining 20 MTPA NLCIL 3 e h T n i h P ) y
Sundarg
fot : Balichuan Sargipali Gnedabahe MoC: Auction process launched for 122 Coat Blocks Following 2 coal blocks in IB valley Coal Field, Sundergarh Dt., Odisha shortlisted by NLCIL Mahik Jhargaon Masani 10 1. Ghogharpalli & its Dip Extn. (20 MTPA) Ha aie Kughedega de Ghogarpalli & It’s Dip Extn. * 9 uctit s Duduk - boul [> Scag Chuabahal Darlipali Mang i Pie laga rer ai Jamgaon Sree Barjha hapada Kanaktora ane Durlaga rm rm nika Madhupur Hansamurakatapali ae ous Ta abira T&iil 7 o_o = * * Area: 14.34 sq.km Geological Reserves: 1288.284 MT Coal Grade: G11 2. Rampia & Dip Side of Rampia (15 MTPA) * * = Area: 12.7 sq.km Geological Reserves: 1179.41 MT Coal Grade: G12 Both coal blocks are explored. Bids submitted. Block auction is scheduled between 27.07.2022 and 03.08.2022. Project area in Ha Capacity of Mine Proposed in MTPA Life of Mine in Years Mineable reserves in MT Stripping Ratio Project cost in Cr Financial IRR in % 4841.99 11.50 35 386.87 1: 7.35 3740.63 11.54 Average Lignite Trans