SWSOLARNSE18 October 2022

Sterling and Wilson Renewable Energy Limited has informed the Exchange about Transcript of Analysts/Institutional Investor Meet/Con. Call

Sterling and Wilson Renewable Energy Limited

October 18, 2022

BSE Limited Phiroze Jeejeebhoy Towers Dalal Street Mumbai – 400 001

National Stock Exchange of India Limited Exchange Plaza Bandra Kurla Complex Bandra (East), Mumbai – 400 051

Scrip Code: 542760

Symbol: SWSOLAR

Sub.: Investors Call Q2 FY23- Transcript

Ref.: Regulation 30 read with Part A of Schedule III of the Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 (“SEBI Listing Regulations”)

Dear Sir/ Ma’am,

Please find enclosed the Transcript of the Investors Call held on Friday, October 14, 2022 at 11:00 a.m. for the Unaudited Consolidated and Standalone Financial results of the Company for the quarter and half year ended September 30, 2022.

The same is also available on the Company’s website at www.sterlingandwilsonre.com

Request you to take the same on records.

Yours faithfully, For Sterling and Wilson Renewable Energy Limited

Jagannadha Rao Ch. V. Company Secretary and Compliance Officer

Encl.: As above

Sterling and Wilson Renewable Energy Limited (Formerly known as Sterling and Wilson Solar Limited) Regd. Office: Universal Majestic, 9th Floor, P. L. Lokhande Marg, Chembur (W), Mumbai - 400043 Phone: (91-22) 25485300 | Fax: (91-22) 25485331 | CIN: L74999MH2017PLC292281 Email: info@sterlingwilson.com | Website: www.sterlingandwilsonre.com

“Sterling & Wilson Renewable Energy Limited Q2 FY2023 Earnings Conference Call”

October 14, 2022

Disclaimer: E&OE - This transcript is edited for factual errors. In case of discrepancy, the

audio recordings uploaded on the stock exchange on 14th October 2022 will prevail.

MANAGEMENT: MR. AMIT JAIN - GLOBAL CHIEF EXECUTIVE OFFICER -

STERLING & WILSON RENEWABLE ENERGY LIMITED MR. BAHADUR DASTOOR – CHIEF FINANCIAL OFFICER - STERLING & WILSON RENEWABLE ENERGY LIMITED MR. SANDEEP THOMAS MATHEW – HEAD INVESTOR RELATIONS - STERLING & WILSON RENEWABLE ENERGY LIMITED

Page 1 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

Moderator:

Ladies and gentlemen, good day and welcome to Sterling & Wilson Renewable Energy

Limited Q2 FY2023 earnings Conference Call. This conference call may contain forward-

looking statements about the company, which are based on the beliefs, opinions and

expectations of the company as on date of this call. These statements are not the guarantees

of future performance and involve risks and uncertainties that are difficult to predict. As a

reminder, all participant lines will be in the listen only mode, and there will be an

opportunity for you to ask questions after the presentation concludes. Should you need

assistance during the conference call, please signal an operator by pressing “*” then “0” on

your touchtone phone. Please note that this conference is being recorded. I now hand the

conference over to Mr. Sandeep Thomas Mathew – Head Investor Relations for his opening

remarks. Thank you, and over to you, Sir.

Sandeep Mathew:

Very good morning, everyone. I welcome you all to the Q2 FY2023 earnings call. Along

with me I have Mr. Amit Jain, our Global CEO, Mr. Bahadur Dastoor, our CFO, and SGA,

our IR Advisors. We will start the call with an update on the solar power industry and

operational highlights for the quarter by Mr. Amit followed by the financial highlights by

Mr. Bahadur, post which we will open the floor for Q&A. Thank you and over to you,

Amit.

Amit Jain:

Thanks Sandeep and a warm welcome to all the participants on this call. I would like to

give a quick update on the solar power industry, other allied renewable businesses and

status on our business operations.

Now coming to solar EPC industry and opportunities. The global solar market is growing

exponentially. It took around a decade for worldwide solar capacity to reach one terawatt

from 100 gigawatt in 2012. In just three years, SolarPower Europe predicts global solar

power to more than double to 2.3 terawatts in 2025.

Solar remains the fastest growing renewable energy, representing over half of the 302

gigawatts of renewable capacity installed internationally in 2021. With 168 gigawatt of

additions, solar installed over 70 gigawatts more than the next greatest installer - wind - and

more than all non-solar renewables combined. The role of solar in the global energy

transition is getting more and more prominent, considering that in 2021, solar alone

installed more capacity than all other renewable technologies combined. In 2022, global

solar is expected to continue the decade-long record-breaking streak, installing more than

200 gigawatt of solar for the first time.

Solar success story over other technology has many reasons, but a key factor is its steep cost

reduction curve over the last decade, which has made solar the global cost leader. While the

Page 2 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

cost of solar has been lower than fossil fuel generation and nuclear for several years, it is

also now lower than wind in many regions around the world.

BloombergNEF’s (BNEF) estimates for the global LCOE for utility scale PV stood at $45

per megawatt hour, in the first half of 2022. Despite losing some ground, this still marks an

86% reduction since 2010 in nominal terms. New build solar projects are now around 40%

lower than BNEF’s global benchmarks for new coal- and gas-fired power which are at $74

and $81 dollars per megawatt hour respectively. The spread with conventional generation

technologies is widening, considering that the cost of coal, gas and nuclear went up. Despite

the record increase in modules, commodities and freight over the last 24 months, the LCOE

for solar plant is still cheaper than the traditional source of energy as well as other

renewable sources of energy.

There are strong levers which will drive robust growth globally over the coming years.

Stronger policy support from the government in terms of tax incentives, favorable policies

for renewable sector coupled with ambitious climate targets announced for COP26 are

going to drive demand for solar energy to new records worldwide.

Solar industry is well poised to grow in long-term, as IPP’s have huge plans for global

capacity additions. The global tariffs have already corrected upwards with the revision in

prices and a lot of projects are expected to get finalized in FY2023, especially H2 FY2023.

Indian solar power capacity has surged over 17-fold to 59 gigawatts since Honorable Prime

Minister Narendra Modi came to power in 2014. The Indian government has accelerated its

plans for clean energy transition, with Prime Minister Narendra Modi pledging to build 500

gigawatts of renewable energy, with 60% of it coming from solar. This is to ensure that half

of our energy requirements will come from renewable resources by 2030. Thus, we expect

outstanding growth in Indian solar power industry in the years ahead. The public sector has

been called upon to join the cause too, with state-run giants such as NTPC, NHPC, SJVN,

NLC India limited, Coal Indian limited etc., crafting solar plans and indicating a strong

pipeline. The government is also persuading and incentivizing the private sector to shape

India’s clean energy future and make it a sunrise sector, just like IT Services after 1991

economic reforms. Major Indian conglomerates have announced Investments and

commitments towards renewable energy targets - with about 151 gigawatts of renewable

energy expected to be added by private clean energy companies alone.

India has also announced a road map to become a hub for the production and export of

green hydrogen - made from water and renewable electricity. India has set a 5 million ton

green hydrogen production target by 2030 to help boost its geopolitical heft and be a game

changer for the country’s energy security. With the government promoting the new age,

Page 3 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

emission free fuel, Reliance Industries has also shown significant interest in the space. With

this development we expect huge increase in the scale of average project size in the Indian

solar industry.

Utility scale solar market performance was mixed in the second quarter. A total of 2.7

gigawatts were installed in Q2, just 500 megawatt more than Q1 - constituting a 25%

decrease from Q2 2021 and 17% increase from Q1 2022. Through the first half of the year,

deployments are at their lowest level since 2019. Supply chain constraints and trade policy

issues continued to suppress utility scale solar installations.

The US utility scale segment experienced a volatile period over the last several months.

First, the Executive Order delaying new tariffs was released which allowed developers to

resume activities as Southeast Asian manufacturers could restart module shipments to US.

But then UFLPA (the Uyghur Forced Labor Prevention Act) implementation led to

detention of several module shipments, further constraining supply and hindering project

construction. Post that, the historic passage of the Inflation Reduction Act (IRA) in August

will prove to be a massive growth catalyst for the solar industry. However due to the near-

term supply chain constraints, according to Wood Mackenzie report, most (77%) of the

effect of IRA will be materialize in utility scale segment after 2024. The lack of equipment

availability has led to continuous project delays, thereby decreasing the 2022 forecast by

600 megawatts to 8.1 gigawatts, the lowest annual total since 2018. The industry will

continue to navigate the UFLPA requirements during the rest of the year, and supply is

expected to return to a steady state at some point in 2023. More than 30 gigawatts of

renewable power projects are expected to be permitted on BLM lands between fiscal years

2022 and 2025. The vast majority of the capacity will be solar powered.

In Australia, the torrential rains adversely impacted the solar EPC activity. It is also facing

resource shortage of white and blue collar manpower. However, the recent election has been

a game changer in terms of the policy support for renewable energy. The new Labor

government has plans to unlock the renewable investments, upgrade the grid and bring

federal policy more in line with states and territories, many of which have more ambitious

climate goals. Labor’s main energy policy, ‘Rewiring the Nation’ includes plan to funnel

$20 billion Australian dollars into new transmission links to accelerate the take of more

clean energy. The plan is part of Labor’s pledge to cut Australia’s 2005-level greenhouse

emission 43% by 2030, projecting renewable reach and 82% share (which was earlier 69%)

in the national electricity market by then. The government also raised the migration cap in

September 2022 to address the issue of skill and labor shortages. GlobalData says in a new

report that solar installations in Australia could grow by a factor of 4 by 2030. It estimates

that the country will reach the solar capacity of 80.22 gigawatts in 2030, from 17.99

gigawatts in 2020.

Page 4 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

In June 2022, the EU energy ministers agreed to increase the share of European energy

consumption coming from renewables such as solar or wind power to 40% by 2030. The

impact of the Russian war on Ukraine and the accompanying energy security challenges

alongside EU climate goals, are driving the continent’s renewable transition - with 25 of 27

EU member states to install more solar in 2022 than 2021. As the continent reels from the

Russian war of Ukraine, the EU has refocused its attention on the role of renewables in

energy security with EU expected to install 39 gigawatt of solar power this year. The real

acceleration will happen in the medium-term, with upward of 100 gigawatt of annual

installations by 2025 raising the way to 1 terawatt of solar by 2023.

As per the International Energy Agency, by 2026, global renewable electricity capacity is

estimated to rise more than 60% from 2020 levels to over 4800 gigawatts - equivalent to the

current total global power capacity of fossil fuels and nuclear combined. Renewables are set

to account for almost 95% of the increase in global power capacity through 2026, with solar

PV alone providing more than half. Our focus is to grab large share of EPC capacity

additions in FY2023 like 23 gigawatt in USA, 16 gigawatt in Europe, three gigawatts in

Australia and 16 gigawatt in India.

It is estimated that solar PV utility scale market (excluding China) is expected to grow at

15% CAGR over the next few years with the growth led by developed markets like US,

Europe, Australia as well as the India market.

During the recent 45th AGM, Reliance Industries announced plans for starting production of

solar cells, battery packs and green hydrogen from the Dhirubhai Green Energy Giga

Complex. Reliance plans to commence manufacturing of solar photovoltaic cells and

modules by 2024 with an annual capacity of 10 gigawatts. That will be scaled up to 20

gigawatt in a phased manner by 2026. Reliance is already one of the largest producers of

grey hydrogen globally and aims to progressively start the transition from grey hydrogen to

green hydrogen by 2025. Importantly, Reliance plans to have 25 gigawatts of solar energy

generation by 2025 for its own captive needs. We expect to get a meaningful pie of work

from Reliance’s new energy goals.

I would like to state that with our global reach, strong relationships with customers and

lenders as well as the induction of Reliance group as additional promoters of the company,

we are well positioned to capitalize on these growth opportunities. Reliance group’s

investment in company has led to strengthening of company’s balance sheet and increased

confidence to customers, suppliers, bankers and other stakeholders.

Now I will give you the overview of our solar O&M business. Our solar O&M portfolio as

of date is 7.2 gigawatts with third party O&M constituting approximately one third of the

Page 5 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

portfolio. While our portfolio has increased vis-à-vis March 2022, we anticipate about 1.8

gigawatt of the portfolio, which is currently under construction/comissioning phase to start

contributing to the top line by Q4 FY2023. O&M constituted 5.4% of the revenue in H1

FY2023 and stood at Rs.82 Crores. We are focusing on increasing international O&M

portfolio through organic and inorganic growth. With more and more processes and

procedures digitized in O&M, we are unlocking the value of predictive maintenance and

making increased use of it, which results in improvement in efficiencies and general

reduction of our levelized cost of electricity. We aim to further increase our market share in

O&M segment by identifying profitable opportunities through global customer mapping.

We are also leveraging our strong partnerships with global IPPs.

Now I will present you with the BESS opportunity. With the increase in clean energy

capacity in the grid and its subsequent decarbonization, ramping up energy storage has

become critical and extreme necessity, moving forward. On a global scale, a 20 times

growth is estimated in energy storage by 2030 and till 2040, a 60 times growth has been

projected compared to 34 gigawatt of energy storage currently available. According to

Vision 2030 report of India Energy Storage Alliance (IESA), at least 160 gigawatt hour of

energy storage will be needed by India by 2030 to integrate a targeted 500 gigawatts of non-

fossil fuel energy, based on its analysis of India’s energy sector and outlining the

requirement of energy storage in the country. We recently entered into a MOU for an EPC

project which includes battery energy storage system for total installed capacity of 455

megawatt hour in Nigeria.

We have added team of battery experts, sales and execution team to capture this market

opportunity and we have bid pipeline of 1.4 gigawatt hours across US, Australia, US and

LATAM. We see pretty robust growth in this market and with RTC tenders due from

government of India in coming years, we see a robust growth in Indian market as well with

respect to battery energy and storage space.

With this I will ask Mr. Bahadur, our CFO to take you through the order book and

consolidated financial highlights. Thank you very much.

Bahadur Dastoor:

Thank you Amit and good morning friends. Speaking about the order book, in August 2022

the company emerged as the L1 bidder for the BOS package comprising four blocks of the

solar PV plant of NTPC Renewable Energy Limited at Khavda RE Power Park, Rann of

Kutch, Gujarat with an aggregate capacity of 1570 megawatt DC. The total bid value

including O&M for three years aggregated to Rs.2212 Crores inclusive of taxes. The

contract agreement for the project has been signed between the company and NTPC

Renewable Energy in October 2022.

Page 6 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

In September 2022, the US step-down subsidiary of the company signed a memorandum of

understanding with the government of the Federal Republic of Nigeria along with its

consortium partner Sun Africa

for

the development, design, construction, and

commissioning of solar PV power plants aggregating to 961 megawatt at five different

locations in Nigeria along with battery energy storage system with total installed capacity of

455 megawatt hour. Financing for these projects is under negotiation between US EXIM,

ING, and the Government of Nigeria. The transaction is expected to consummate by Q4

FY2023. Here I would like to add that Sterling and Wilson group has a strong presence in

Africa and has an excellent reputation in Nigeria for successfully executing projects in the

power sector.

Our unexecuted order book as on September 30th stands at Rs.2,654 Crores with nearly

78% domestic EPC which is executable over the next 12 months. Our order bid pipeline

remains robust and we are still awaiting results of approximately 19 gigawatt of bids that

are likely to be announced in H2 FY2023. We are on track to achieve and may exceed our

earlier given FY2022 guidance of $1 billion in new orders, other than those of group

companies.

The prices of modules, commodities and logistic costs, which had hardened due to

geopolitical tension in the first half of the year have begun to moderate. A lower cost curve

is likely to help tendering activity gather momentum, which should help result in more

order finalizations in the second half of FY2023.

I will now take you through the consolidated financials for the half year ended September

30, 2022. Revenue for H1 has been at Rs.1,520 Crores as compared to Rs.2,630 Crores in

H1 FY2022. Revenue and margin trajectory in the EPC business is anticipated to normalize

from Q1 of FY2024. O&M constituted 5.4% of total revenue in H1 FY2023. New site

additions to O&M portfolio is likely to start contributing to top line from Q4 FY2023.

Company level, the gross margin remains suppressed primarily on account of international

EPC projects. In the US, labor costs increased due to shortage of labor supply and in

Australia, labor cost, site and site overheads increased due to loss of productivity on

account of extreme weather conditions. Further there was a translation loss due to adverse

movement in exchange rate between the USD and the INR and the AUD, INR compared to

March 2022. O&M margins were impacted by projects where O&M costs were incurred,

however revenue recognition has not commenced due to clients delaying final handover.

O&M margins were also impacted by non-recurring costs of about Rs.10 Crore during the

quarter. While we anticipate revenue to be recognized on a retrospective basis, we have

provided for the cost incurred upfront.

Page 7 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

Coming to the balance sheet. As on September 30, 2022 the net worth stood at Rs.338

Crores on a consolidated basis and cash and cash equivalence stood at approximately

Rs.428 Crores. Our net debt stood at Rs.885 Crores. We expect net debt to decrease with

new order inflows and completion of US and Australia projects. Advance and performance

bank guarantees encashed by four customers amounted to Rs.588 Crore. With one

customer, we have signed the final settlement agreement and the encashed amounts for two

projects totaling to Rs.350 Crores have been refunded by the customer. With respect to the

balance two customers whose projects are completed, the company is in discussions with

them.

As on September 30th, we had negative working capital of Rs.272 Crores as compared to

negative working capital of Rs.302 Crores as on March 2022.

Receivables due for more than one year as at September 30th stood at Rs.362 Crores

compared to Rs.261 Crores as on June 30th. They comprised related party receivable of

Rs.30 Crore which is net of Rs.175 Crore that the company needs to pay back to the related

party against advance received for the Waste to Energy project.

With this we can now open the floor to questions and answers.

Moderator:

Thank you very much. We will now begin the question and answer session. The first

question is from the line of Abhineet Anand from Emkay Global. Please go ahead.

Abhineet Anand:

Thanks for the opportunity. I just wanted to understand on the Nigeria MOU. Can you give

some details in terms of the size, in terms of value and our share given that we have

probably bid with Sun Africa as a partner.

Amit Jain:

To start with the Nigeria opportunity, Sun Africa is a very reputed developer, which is

developing projects across multiple geographies including Africa, they are developing

projects in Europe, they are developing projects in Africa, and in Africa particularly they

are very active in Angola and Nigeria. So, they have developed a portfolio of five projects

in Nigeria in which we are cooperating with them and have entered into alliance to develop

and carry out EPC activity on those projects. We have signed the MOU with the Ministry of

Government of Nigeria for construction of these projects and we are in negotiation to

conclude the EPC agreement with them.

Abhineet Anand:

Any color on the order value.

Amit Jain:

We have given that the values to the tune of like we are expecting, we are still negotiating,

but we expect it to be close to $1.5 billion.

Page 8 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

Abhineet Anand:

Then that itself as Bahadur did mention that for the current year we are expected to exceed

our earlier guidance of $1 billion of inflows right that self you are saying and this $1.5

billion that you are saying is our share.

Amit Jain:

$1.5 billion is share for both the parties.

Abhineet Anand:

And what is our share in that.

Bahadur Dastoor:

Our share would be in excess of about 95% of the total value rest being on account of

development, but as Mr. Amit has mentioned this is still under various stages of

negotiation, the range though is what is the number that he has mentioned.

Abhineet Anand:

So then it takes to the point that probably our guidance looks to be significantly below what

we probably might achieve obviously it is in negotiation stage, but if I have to just add here

that if we look into a two years perspective rather than just one year that what guidance we

have seen what could be a realistic number in terms of inflows that one can have. Two year

or three year whatever is suitable to you guys.

Amit Jain:

As we are stating in our various conference calls that domestic market is significantly

moving up and we have recently bagged 1.5 gigawatt order from NTPC. The value of that

order net of tax is approximately 1800 Crore plus and we have stated that Reliance would

be carrying about worth of 20 gigawatts and we expect to get a meaningful pie of that work.

So that values can be extrapolated from that aspect what kind of inflows can be expected.

We are negotiating deal in Nigeria and international, and both domestic markets other than

these particular projections continue to be robust. So we expect that the values or the

guidance of $1 billion which was provided earlier we significantly expect to move up and

the revenues inflow will grow significantly in next two years.

Bahadur Dastoor:

And to add further that could be the kind of target that we are aspiring to work on over the

next two to three years of course trying to exceed that as well.

Abhineet Anand:

And just on the balance sheet side, if you see your first half basically almost our networth

has come down from 600 crores to 300 odd crores largely because of the loss that we have

incurred. Now we have a bit of cash do you think there will be a need of some either raising

your debt or equity infusion that will be needed this year given that inflows will probably

happen in H2. So revenues would probably start kicking in 1Q 2024.

Bahadur Dastoor:

There would be some amount of funding that would be required to complete the existing

projects. The company is also internally having discussions in terms of the networth. We

will be able to provide guidance on what exactly needs to be done by the time we have the

Page 9 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

call for the next quarter, but there will be a certain increase which will happen right now in

the funding requirement, which the company has more or less tied up.

Abhineet Anand:

Last one from me. Amit did talk about the battery storage part. India is still in the nascent

stage and there is a lot of growth opportunities that people feel are there. If you can

highlight from your international experience as to the pricing what is in the other parts of

the world and what pricing that India is presently having and what can happen. So per unit

how will the battery power look like, if we use battery storage today in India and globally

what is happening in the pricing front.

Amit Jain:

See as far as the battery pricing is concerned, so the major battery supplier still continue to

be from international markets. So as the major part of the cost comes from the battery

supply part and the EPC portion or the construction portion constitute only 15% to 20% of

that part and the cost of that continues to be $250 per kilowatt hour for the battery supply

portion and total EPC part is around $300 per kilowatt hour. The per unit rate depends upon

the usage what kind of usage and what kind of RTC requirements clients have or what kind

of grid requirements it would be used for. So, it is extremely variable and various multiple

business models are evolving and same will be emulated in India. So, the per unit cost of

stored electricity or from the bess model will be varied as per the use on the customer

requirements.

Abhineet Anand:

Okay Sir thanks for the answer and I will get back in the queue. Thank you.

Moderator:

Thank you. Next question is from the line of Faisal Hawa from H. G. Hawa & Co. Please

go ahead.

Faisal Hawa:

Sir this Nigeria order as well as the new NTPC order, what are the kind of estimations we

have made for the gross margin in these two projects and if at all you could also mention

about the ultimate EBITDA will be from these projects. My second question is that we are

now going for a multi country execution and also in the case of Nigeria there are almost like

three counterparties involved the Government of Nigeria, then Sun Power and also US

EXIM. So we have these various countries that we operate in and there are various vagaries

like you just said that in US the employee cost has risen, in Australia there are some

problems of rain, so mathematically how will you see to it that Sterling & Wilson is not

affected due to this because one project failing and our EBITDA margins do not really

allow for any kind of deviation and there are so many factors which are just beyond our

control. So how will we do it because this is like multi-country and then there are multi-

risks?

Page 10 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

Bahadur Dastoor:

I will start out Mr. Hawa and then maybe Amit can pitch in a little later, I will try and

answer all your questions one by one. See I would not want to go down to project level

margins and say what kind of margins we are obtaining in Nigeria or what kind of margins

are there in NTPC. Suffice to say it would be close to what we have been historically doing

in a range and that is what we are aspiring to do. That is to answer your first question.

Second as far as you know the unseasonalities of rain that have happened as well as in

Australia as well as labor costs which have gone up - the company has now strengthened its

risk matrices. We earlier used to also take this into account in the case of Nigeria as well as

in the case of NTPC most of it is subcontracting, it is not something that is going to be self-

performed and therefore all those risks we would as an organization also pass on to the

subcontractors. As far as pricing is concerned, yes while there would be a pricing which is

there even for modules in the case of the Nigeria job, the NTPC job is without modules.

There are firm commitments which are being taken from vendors having learned from all

our experiences in the past to ensure that there is no slippage of margins. When we talk of

margins. we always talk of gross margin because for us the overheads are basically a total

cost across the various entities of this organization. So we do not look at EBITDA level

margins for projects that would be at an organizational level. That number is in the range of

400 to 450 Crores and as your turnover increases which you can see from the order book,

your operating leverage is obviously going to kick in which gives you a greater EBITDA

margin. We will of course need to be more careful in Australia and US, we will be more

selective and risk averse in these geographies - though historically in India and Africa we

have always made good margins even in the toughest of times. As far as the Nigeria job is

concerned it is funded through US EXIM or it is proposed to be funded through US EXIM

and most of the suppliers would be US suppliers, contracts there are extremely strong and

US EXIM has already done funding of a similar project in Angola of a very large size. If I

have missed anything, please just remind me and Amit can pitch in if I have missed

anything.

Amit Jain:

Bahadur you have summarized it well. You have captured practically all the things. So Mr.

Hawa in multi-geography now as Bahadur alluded to the risk matrices are being reviewed

and we are changing our risk profile. So we are negotiating the contracts and building

contingencies around the inclement weather or labor shortages. So we are bidding

selectively and we are taking care of the risk profile we are taking, so that the margins

remains intact whichever geography we are working in. And all the geographies wherever

we are working we have put in very, very strong teams so that the execution risk is

minimum and we pass on the risk through subcontracting model to our subcontractors.

Faisal Hawa:

So in any of these two contracts will we have to give some kind of bank guarantees also to

the counterparties?

Page 11 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

Bahadur Dastoor:

Yes, of course bank guarantees are always part of every contract.

Faisal Hawa:

So, at least can you tell me what are the gross margins we have targeted in these two

projects because that gains very much importance because we have to as investors also get

into our calculations various vagaries that will come through in future. So whatever steps

we might take but these vagaries are such that many times even the management cannot

budget for them. And we have seen in the past that it is not only the solar modules many

times one or two projects have affected our entire year’s performance?

Bahadur Dastoor:

So I would just like to say this much that the mix for gross margins for all new jobs would

be low double digits combining all contracts together. I would not want to go into

discussing project level margins.

Faisal Hawa:

What is our realistic target for orders now because we have already achieved the target for

the year. So how many more orders will we take so that we do not go too far into the future

where prediction of raw material then all may become much more difficult? Or will we just

take all the orders and then just make the counter bookings with the suppliers?

Bahadur Dastoor:

So I will start off by saying that most of the orders that we generally take are having a

closure period of between 15 months to two years. So it is not something that we would

take and then sit on the order for the next two to three years - that is not how the solar

business operates. We have presently - so while it is an MoU you can say that we are

looking at exceeding our targets; however, that does not mean that we are shutting shop.

We are right now involved in bids as has been mentioned by Amit as well as me for a very

large portfolio across the world plus there are a lot of bids coming in India. India has always

been our strength; our domestic margins continue to be protected. They were so in March,

they are so in June quarter as well as in September quarter as part of our investor

presentation and it is something that we are aggressively pursuing so long as our blended

margins that we internally have are taken care of.

Faisal Hawa:

What is our hiring program for engineers for the next two to three years, for the next one

year at least?

Bahadur Dastoor:

So we have mentioned that we are looking at increasing our total team size to take care of

all of these new ones, new jobs. We are already looking at increasing our domestic

headcount to about 1,500 from the present head count that we had in March of about 467.

At the same time there have been some reductions in places like Australia where jobs are

coming to an end - that is to of course be very efficient and lean in terms of our operations.

But right now also we are looking at increasing our head count for design and engineering

by about 195 people, construction 615, project management about 120. You will see that

Page 12 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

the corporate head count the backend is just about 40 people, because as a backend we

already have enough strength to take care of the projects that we are looking at.

Faisal Hawa:

Okay.

Moderator:

Thank you. The next question is from the line of Siddharth from MK Ventures Capital.

Please go ahead.

Siddharth:

Thank you for the opportunity. My first question is on the gross margins again. You guided

for a low double digit margins. Just wanted to understand the difference between the

projects where you have taken with solar modules and the projects where we are not taking

with solar modules. If you can just give some bifurcations where we know further whenever

we win project what kind of gross margins we will make on those projects?

Bahadur Dastoor:

We always get margins even on the modules, though module price is being known to

everyone the profit margin on modules is a little lower as compared to if you were to take a

BOS margin. When we are giving you this number of low double digit it is considering a

blend. Though if you were to look at it purely from a BOS perspective, it would be maybe a

slight higher number as compared to the one with modules.

Siddharth:

The Reliance projects whenever we win, those projects will be also at similar margins?

Bahadur Dastoor:

We hope and expect that they will be because both parties have to come to a conclusion on

what the margins will be, but yes that is our aspiration. Just to add that both NTPC as well

as Reliance will be all BOS. There are no modules in that.

Siddharth:

So that will be at relatively higher margins from percentage terms?

Bahadur Dastoor:

Yes, we will try to upgrade our margins.

Siddharth:

The current order book as of now which is booked as 2600 Crores. So out of this how much

is the legacy orders where there will be still some losses and what can be the extent of these

losses which will flow through all P&L in the next two quarters?

Bahadur Dastoor:

So let me put in a little bit of perspective. So out of the order book that we have, we have

roughly between 550 to 600 Crores of the legacy orders where there is no loss but there is

no profit either. They are at more or less a break even because we always account for all the

losses up to a point in time. To give you a perspective of this 500, 600 Crores it is only

about 6% to 7% of the total order values of all of these legacy orders. So today we are at the

fag end of all of this we are hopeful of closing (audio cut).

Page 13 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

Siddharth:

Are you suggesting that we will not have any further P&L losses or cash outflow on the

legacy orders from now or we are mostly provided for all the losses?

Bahadur Dastoor:

Losses we have accounted for whatever we had to. And wherever we had any subjectivity

we have given that in the notes to the financials. As far as cash outflow is concerned, yes,

we would require to do a certain incremental borrowing to complete those existing projects.

So right now we have done borrowings of about Rs.700 Crores of which we have about

Rs.400 Crores lying as a cash and bank balance. Over and above that there will still be a

requirement because one is accounting for the loss and second is paying for those payables

to complete the projects. We will be doing that part of our borrowing plan most of it which

is already tied up with participating banks.

Siddharth:

So how much is the cash outflow which will happen on this legacy projects going forward,

a broad range if you can share the estimate?

Bahadur Dastoor:

That figure would be in the range of a further Rs.300 to 400 Crores over and above the bank

balance that we have.

Siddharth:

This is after the indemnity agreement which we had with...

Bahadur Dastoor:

It is after the indemnity claim for crystallized items as on September 30, 2022.

Siddharth:

Last question from my side. Broadly we have Rs.885 Crores of net debt and customer

advances of say Rs.300 Crores negative working capital of Rs.300 crores. So we are in a

way around Rs.1,200 Crores of borrowing and further Rs.300 to 400 Crores is the

maximum liability which can arise. So by the end of this year when we are done with all the

legacy projects we can have Rs.1,500 Crores of liabilities if we exclude the customer

advances. Is that broadly correct Sir?

Bahadur Dastoor:

Yes, but it also depends on the advances which we will get from the new jobs that we are

working on right now, which will go to reduce that. You are looking at it at a gross level.

There will always be customer advances from the jobs which will go to bring it down.

Siddharth:

Understood, great Sir thank you thanks for the clarification.

Moderator:

Thank you. The next question is from the line of Anupam Goswami from B&K Securities.

Please go ahead.

Anupam Goswami:

The NTPC order of Rs.2,200 Crores for 1600 megawatts. So it is coming about 1.3 crore

per megawatt. So is it the whole EPC contract that we understand or there is some any

clause or conditions in that partially if it is there anything?

Page 14 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

Bahadur Dastoor:

Rs.2,200 Crores for 1.5 gigawatt includes O&M for three years and includes the taxes. If

you exclude all of this out, the value comes closer to about Rs.1.2 Crores per megawatt

which is the average BOS price. It is not a full EPC contract. If one were to do EPC it

would be upwards of Rs.3 Crores per megawatt.

Anupam Goswami:

I understand and how much margin are we commanding on BOS supplies?

Bahadur Dastoor:

I already answered that question a little before, that I do not want to go to project level

margins, but on an average it is low double digit that we work towards.

Anupam Goswami:

My last question on the kind of module prices we are so our EPC contracts domestic if we

say what kind of margins do we see going forward do we see any challenges in that to

maintain the margins?

Bahadur Dastoor:

So modules does not have an impact as far as domestic is concerned because almost all our

orders in the domestic front are without modules. So the margin profile that I gave you

includes what we do in India as well.

Anupam Goswami:

Where are we sourcing mostly for our equipments and modules?

Bahadur Dastoor:

Modules worldwide would obviously have China as a great factor. As far as the job that we

are working on in Nigeria, since it is US EXIM funded we assume that US EXIM will have

a great role to play in determining who are the major vendors for that particular job.

Anupam Goswami:

I understand, I will join back in the queue. Thank you.

Moderator:

Thank you. The next question is from the line of Manoj from Geometric Wealth Advisors.

Please go ahead.

Manoj:

Congratulations Sir on winning lot of orders and bringing back the company on the order

front. My first question is let us assume go forward two, three years when the company

balance sheet is more strong and hypothetically if you are getting Rs.30000 Crores of order

in a particular year so is there any capacity constraint in terms of labor or in terms of

sourcing. How to think of in terms of the capacity of taking order? And similarly how much

we are taking orders around $1.5 billion this year hypothetically, the project schedule is 15

to 24 months, how much we can execute in a particular year? Can you take an NTPC

example in that it will be very helpful? Thank you.

Amit Jain:

As we explained earlier during the call that we are increasing our capacity, we are

increasing our bandwidth to address the increased market size. So this year itself, we are

adding people in excess of more than 1,000 people. We are strengthening our engineering

Page 15 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

procurement and project execution team to address the increased market size and the

increased order book for which we anticipate. So anytime, we are negotiating any particular

order book so we have some time in hand and we have a clear visibility in which quarters

we are going to book and what would be the execution plan look like. So we start working

in advance and start adding capacities. Like NTPC we have time of like execution time is

18 months and we have sufficient bandwidth to execute that order in the particular

timeframe. If you see historically, we have achieved the turnover around in excess of

Rs.8500 crore in particular year. If you address, that we can easily handle a turnover of

Rs.10000 to 12000 Crores without much increase in our overheads and we have that

bandwidth. So, we are very, very well placed to handle any increase in the order book and

we are very well placed for that and our organization expansion plan based on anticipated

order books are well in place.

Manoj:

Thank you. So let me take a summary of that for having more order we need more

employees for that..

Amit Jain:

No, we need the employees for execution, but our backend for the management teams are in

place, but wherever we need like most of the works will be carried out through

subcontractors and where we have a need to execute in-house - so we are very well

positioned for that expansion and we are expanding our engineering teams. And we will be

able to cater to that, but it will not be lead to any significant increase in overheads.

Manoj:

I understand. Coming back to my question. looks like we are going through a lot of orders

from our Reliance group also and you are bidding in more area and that there is a lot of

tailwind also in this sector. So if that kind of orders we want if you are getting Rs.25000,

30000 Crores we can increase our capacity for that. Is it possible for organization Sterling?

Amit Jain:

Absolutely it is possible to expand the capacity to that. It is absolutely possible and we are

working towards that and if we foresee that, that kind of order booking is happening, that

will be addressed accordingly.

Manoj:

My second question is for the time being we can take a fixed recurring overhead cost as

Rs.400 Crores is it my right assumption?

Bahadur Dastoor:

Between Rs.400 to 450 Crores over the next two to three years considering inflation or

some little addition to backend is the kind of range that we are working towards.

Manoj:

My question is in terms of procuring raw material how much dependency still solar industry

have on China and how much it is do you think going forward into three years it can be

reduced - as a lot of people are putting capacities in India and outside also?

Page 16 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

Amit Jain:

As far as the module sourcing is concerned, at this point of time there is a major

dependence on China because China controls most of the capacity of solar modules, but as

you yourself has said there is a lot of capacity addition is happening not only in India but

most of the other parts of the world. So I see a lot of capacities coming online in the next

couple of years in India and other parts of the world, which would significantly reduce

dependency on China. And will be able to source the modules and all other materials from

either India or multiple other markets.

Manoj:

Thank you. I will join back in the queue for questions.

Moderator:

Thank you. Next question is from the line of Shantanu Mantri from Think Investments.

Please go ahead.

Shantanu Mantri:

Thanks for the opportunity. So I have two questions. My first question is that last couple of

years our projects in Australia, US we faced huge losses and now we are coming to kind of

fag end of all those orders. The quantum of these losses were massive like we have just

eroded almost our entire net worth. Having said that now we stand at a point where we have

these big orders coming in from Nigeria and we have the whole Indian domestic story. So

coming on to my question what are the few big risks you see in this Nigerian order that can

affect us or rather what is the comfort you have that whatever we have seen in the past will

not repeat again? If you can just share like how we have changed on our risk analysis will

be really helpful?

Amit Jain:

As you have started the question with US and Australia I would like to point out that the

last two years were exceptional for the whole world because of the pandemic, the

breakdown of the entire supply chains and the entry restriction in those two geographies

where we cannot supplement the teams with expertise and workers. So they were very, very

different circumstances and we are over that and that particular part of the order book is to

the fag end and we can see projects are about to be over. As you are aware that we have a

strong presence in Africa and we have executed projects successfully we have won more

than 10 countries in Africa, we have already have a huge presence in Nigeria. Our group

companies have carried out projects in Nigeria. Sterling & Wilson Solar has already

executed though on a smaller scale four projects in Nigeria. So as far as the African and

Nigerian execution piece is concerned we were very, very confident and we are one of the

most successful contractors in Africa. Now coming back to the supplier part - this Nigeria

job is funded by EXIM Bank of US and most of the suppliers are going to be from US or

the allied countries and it is the sanctity of the contract in those geographies is very, very

high. So like it is not the kind of problems which we faced in Australia that the suppliers

reneged on their contracts. That is not going to happen on the Nigerian contract. And

coupled with our execution experience in Nigeria, most of the construction jobs will be

Page 17 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

subcontracted and risk sharing will be done with the subcontractors. So, I feel that as far as

the Nigerian piece is concerned, we are very well protected and we have ring-fenced our

risks to most of the extent for Nigerian projects.

Shantanu Mantri:

Got it, that is really helpful and my second question is more on our balance sheet

particularly our debt. So I see right now we have around some Rs.850, 880 odd Crores of

net debt. I believe that this will increase by another Rs.300 Crores by end of March. So we

will be somewhere around. This is excluding any advances from the NTPC order - I do not

want to get into those advances. But on a pure legacy order whatever we executed we will

end up somewhere around Rs.1100 or 1200 odd Crores of net debt. Now just if we take this

number I wanted to understand based on the indemnity agreement what would be the total

number that either our third parties who have to pay us or in case it comes up on the

promoters what would be the total number that we can expect obviously this will happen

when the liability materializes, but I just wanted to know that what would be the inflow to

the company that will knock off against this Rs.1,200 odd Crores net debt probably in the

next 12 to 15 months if you can just give some colour on that?

Bahadur Dastoor:

Yes, I will try to answer that question. The total indemnity inflows which would come in

either from the promoters or the customers or the authorities would be approximately

Rs.600 to 650 Crores on account of liquidated damages and perhaps about another Rs.300

to 400 Crores on other items including things like receivables or if you have any of your

input stuck with the authority. So we are talking of a ballpark number of items covered in

the indemnity to be between about Rs.1000 to 1200 Crores.

Shantanu Mantri:

The timeline for this could be in the next 12 to 15 months or much earlier?

Bahadur Dastoor:

It cannot be. Because we have to raise indemnity claims only once in a year. So after

considering the 300 Crores which had to be borne by the company, the company has

already raised an indemnity claim for September 30, 2022. The earliest we can raise the

next claim and the number that I am talking about is not what is included in the present

claim - it is only going to be September 2023. So it will definitely not be all fructified in 15

months, it can be something fructified in 12 months, 24 months or if there are legal cases

then it may take longer to fructify as well.

Shantanu Mantri:

Maybe the timelines would be different, but on a number-to-number basis so we have

almost Rs.1000 odd Crores that should eventually come into the company and so whatever

debt we are generated now…

Page 18 of 19

Sterling & Wilson Renewable Energy Limited October 14, 2022

Bahadur Dastoor:

Rs.1000 to 1200 Crores - a pretty significant portion may come in not just from the

promoters but even from the customers with whom we will finalize our LD settlement over

the next 12 months.

Shantanu Mantri:

Any realistic number you would want to give us for next September 2023 or maybe a not a

realistic, but a conservative number that this should definitely come in by September 2023?

Bahadur Dastoor:

So, if it was already crystallized I would have already taken it in my September 2022 claim.

So I do not want to put out any kind of number conservative, realistic, pessimistic. I have

given you what is the overall number. We are all striving to see that we recover everything

as fast as we can, not necessarily from the promoters but even from the customers or the

authorities wherever it is stuck.

Shantanu Mantri:

Okay that is it from my end. Thank you so much.

Moderator:

Thank you. I now hand the conference over to Mr. Amit Jain for closing comments.

Amit Jain:

Thank you. With the robust backing of Reliance Group and Shapoorji Pallonji Group we

endeavor to accelerate our growth trajectory by aggressively pursuing large markets

globally where we foresee a huge potential of growth. India too has reached an inflection

point from where we anticipate the growth of solar power industry to garner further pace

and momentum. With our deep-rooted client relationships, global presence, ability to

provide customized solutions, strong track record of executing complex and large-scale

projects supported by robust balance sheet and the strong parentage of Reliance group and

Shapoorji Pallonji Group we are confident of regaining our leadership position. I would like

to thank everybody for joining the call. I hope we have been able to address all your

queries. For any further information kindly get in touch with Sandeep Thomas Mathew or

Strategic Growth Advisors our Investor Relationship Advisors. Thank you once again and

have a great day. Thank you.

Moderator:

Thank you very much. On behalf of Sterling & Wilson Renewable Energy Limited that

concludes this conference. Thank you for joining us. You may now disconnect your lines.

Page 19 of 19