POWERMECHNSE2 September 2023

Power Mech Projects Limited

3,370words
1turns
0analyst exchanges
0executives
Key numbers — 40 extracted
rs,
ses such as ‘will’, ‘expected to’, ‘horizons of growth’, ‘strong growth prospects’, among many others, or similar expressions or variations of such expressions. These forward-looking statements involve a
Rs. 3,524
ng projects 17 Overseas projects 49 O&M/ AMC projects(domestic) Largest O&M Service provider1 Rs. 3,524Cr Order book at IPO (FY16) Rs. 53,320Cr* Order book as on 9th Aug’23 Industrial plants Railway
Rs. 53,320
&M/ AMC projects(domestic) Largest O&M Service provider1 Rs. 3,524Cr Order book at IPO (FY16) Rs. 53,320Cr* Order book as on 9th Aug’23 Industrial plants Railways & Metro Roads Water Mining Sector
Rs. 3,618
r book as on 9th Aug’23 Industrial plants Railways & Metro Roads Water Mining Sectors FY23 Rs. 3,618cr Rs.421cr/12% Rs.209cr/6% Total Revenue EBITDA/ margin PAT/ margin Pan India presence with i
Rs.421
9th Aug’23 Industrial plants Railways & Metro Roads Water Mining Sectors FY23 Rs. 3,618cr Rs.421cr/12% Rs.209cr/6% Total Revenue EBITDA/ margin PAT/ margin Pan India presence with internation
12%
3 Industrial plants Railways & Metro Roads Water Mining Sectors FY23 Rs. 3,618cr Rs.421cr/12% Rs.209cr/6% Total Revenue EBITDA/ margin PAT/ margin Pan India presence with international ope
Rs.209
dustrial plants Railways & Metro Roads Water Mining Sectors FY23 Rs. 3,618cr Rs.421cr/12% Rs.209cr/6% Total Revenue EBITDA/ margin PAT/ margin Pan India presence with international operations
6%
plants Railways & Metro Roads Water Mining Sectors FY23 Rs. 3,618cr Rs.421cr/12% Rs.209cr/6% Total Revenue EBITDA/ margin PAT/ margin Pan India presence with international operations and
Rs. 9,294
try experience 11,866 Manpower base Q1’FY24 1 2 3 4 5 6 7 8 *Including MDO contracts of Rs. 9,294Cr and Rs.30,438Cr (Execution considered only upto 30th June 2023) 1. For power in terms of MW 3 B
Rs.30,438
11,866 Manpower base Q1’FY24 1 2 3 4 5 6 7 8 *Including MDO contracts of Rs. 9,294Cr and Rs.30,438Cr (Execution considered only upto 30th June 2023) 1. For power in terms of MW 3 Business Overview
150 MW
teel & Minerals  Caters Coal-based Power Plants BTG & BOP works with unit capacities ranging from 150 MW to 800 MW including FGD & SCR.  Cross Country Pipelines, Erection of Piping Packages & Tankages
800 MW
erals  Caters Coal-based Power Plants BTG & BOP works with unit capacities ranging from 150 MW to 800 MW including FGD & SCR.  Cross Country Pipelines, Erection of Piping Packages & Tankages Infrastru
Guidance — 7 items
Fax
opening
9,294Cr Kotre Basantpur Pachmo Open cast project Executable over 25 years* Order #2 Steel Authority of India Limited Rs.
Fax
opening
In IT Project Management & & delivery, client engagement, IT strategy, business development • Holds Post-Graduate in Management from ISB and MS in Electrical and Computer Engineering from the University of Texas 12 Professional and Experienced Management Mr.
Fax
opening
Chandrashekar Chilka (Executive Director Non-Board Project Management) • • 32+ years experience In energy and infrastructure sector Previous associations include Tata, Toshiba, NCC Ltd.
Fax
opening
Srinivasulu (Executive Director Non-Board) • 30+ years experience in the Power Sector dealing in Project & Construction Management, Erection & Commissioning Mr.
Fax
opening
VP - Electrical T&D) • 28+ years experience in Business Development, Project Management & Site Execution of T&D • MBA in Project Management, B.E.E.
Fax
opening
S Kodandaramaiah (Director – BD Non-Board) • 40+ years experience in power and industry sector related to EPC, Construction, project management, Business Development Previous associations include BHEL, GE • Mr.
Fax
opening
Vijay Kumar Reddy Botta (AVP – Project Management) • • 20+ years experience in a wide range of projects Previous associations include M/s Megha Engineering and Infrastructure Ltd, M/s GVPR Engineering Ltd & M/s Ramky Infrastructure Ltd.
Advertisement
Risks & concerns — 1 flagged
Manufacturing & Heavy Fabrication  Backward integration advanced manufacturing facility at Noida for service need of Power and Non Power sector to O&M business,  Cates to fabrication of heavy structures, large & high-pressure tanks, hydro turbines etc.
Fax
Speaking time
Fax
1
Advertisement
Opening remarks
Fax
040-30444400 E-mail ;info@powermech.net Website: www.powermechprojects.com -+- Power Mech Projects Limited Corporate Presentation Disclaimer This investor presentation has been prepared by Power Mech Projects Limited and does not constitute a prospectus or placement memorandum or an offer to acquire any securities. This presentation or any other documentation or information (or any part thereof), delivered or supplied, should not be deemed to constitute an offer. No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness, or correctness of such information or opinions contained herein. The information contained in this presentation is only current as of its date. Certain statements made in this presentation may not be based on historical information or facts and may be ‘forward-looking statements’, including those relating to the general business plans and strategy of Power Mech Projects Limited, its futur
Advertisement
← All transcriptsPOWERMECH stock page →