Welspun Enterprises Limited has informed the Exchange about Investor Presentation
WEL/SEC/2025
To, BSE Limited 1st Floor, Rotunda Bldg., Dalal Street, Fort, Mumbai - 400 001. Scrip Code: 532553
Dear Madam / Sir,
February 03, 2025
National Stock Exchange of India Limited Exchange Plaza, C-1, Block-G, Bandra Kurla Complex, Bandra (East), Mumbai - 400 051. NSE Symbol: WELENT
Subject: Investor Presentation pursuant to Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015.
This is with reference to our letter dated January 30, 2025, intimating the schedule of earnings call, and pursuant to Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, please find attached herewith the Investor Presentation on the Un-audited Financial Results of the Company for the quarter ended December 31, 2024.
The presentation www.welspunenterprises.com
is also being hosted on
the Company website simultaneously at
Please take the same on record.
Thank you,
For Welspun Enterprises Limited
Nidhi Tanna Company Secretary ACS – 30465
Encl: as above
WELSPUN ENTERPRISES LIMITED
Q3FY25 Investor Presentation 03rd Feb 2025
BSE: 532553 | NSE: WELENT |ISIN: INE625G01013
Safe Harbor
The information contained in this presentation is provided by Welspun Enterprises Limited (the “Company”). Although care has been taken to ensure that the information in this presentation is accurate, and that the opinions expressed are fair and reasonable, the information is subject to change without notice, its accuracy, fairness or completeness is not guaranteed and has not been independently verified and no express or implied warranty is made thereto. You must make your own assessment of the relevance, accuracy and adequacy of the information contained in this presentation and must make such independent investigation as you may consider necessary or appropriate for such purpose. Neither the Company nor any of its directors assume any responsibility or liability for, the accuracy or completeness of, or any errors or omissions in, any information or opinions contained herein. Neither the Company nor any of its directors, officers, employees or affiliates nor any other person accepts any liability (in negligence, or otherwise) whatsoever for any loss howsoever arising from any use of this presentation or its contents or otherwise arising in connection therewith.
The statements contained in this document speak only as at the date as of which they are made, and the Company expressly disclaims any obligation or undertaking to supplement, amend or disseminate any updates or revisions to any statements contained herein to reflect any change in events, conditions or circumstances on which any such statements are based. By preparing this presentation, none of the Company, its management, and their respective advisers undertakes any obligation to provide the recipient with access to any additional information or to update this presentation or any additional information or to correct any inaccuracies in any such information which may become apparent. This document is for informational purposes and does not constitute or form part of a prospectus, a statement in lieu of a prospectus, an offering circular, offering memorandum, an advertisement, and should not be construed as an offer to sell or issue or the solicitation of an offer or an offer document to buy or acquire or sell securities of the Company or any of its subsidiaries or affiliates under the Companies Act, 2013, the Securities and Exchange Board of India (Issue of Capital and Disclosure Requirements) Regulations, 2009, both as amended, or any applicable law in India or as an inducement to enter into investment activity. No part of this document should be considered as a recommendation that any investor should subscribe to or purchase securities of the Company or any of its subsidiaries or affiliates and should not form the basis of, or be relied on in connection with, any contract or commitment or investment decision whatsoever. This document is not financial, legal, tax, investment or other product advice.
This presentation contains statements of future expectations and other forward-looking statements which involve risks and uncertainties. These statements include descriptions regarding the intent, belief or current expectations of the Company or its officers with respect to the consolidated results of operations and financial condition, and future events and plans of the Company. These statements can be recognized by the use of words such as “expects,” “plans,” “will,” “estimates,” or words of similar meaning. Such forward-looking statements are not guarantees of future performance and actual results, performances or events may differ from those in the forward-looking statements as a result of various factors and assumptions. You are cautioned not to place undue reliance on these forward looking statements, which are based on the current view of the management of the Company on future events. No assurance can be given that future events will occur, or that assumptions are correct. The Company does not assume any responsibility to amend, modify or revise any forward-looking statements, on the basis of any subsequent developments, information or events, or otherwise.
Any reference herein to "the Company" shall mean Welspun Enterprises Limited, together with its consolidated subsidiaries.
Welspun Enterprises At a Glance
FINANCIAL STRENGTH
ROBUST ORDER BOOK
HEALTHY PROFITABILITY
~20% Revenue CAGR
₹ ~14,500 Cr.*Consolidated Order
(FY2021-24)
Book
Higher profitability - average PAT margin for last 4 years ~13.3%
₹844 Cr. Cash on Hand
Focused on execution
Well-positioned to capture emerging opportunities in India’s Water, Transportation & Tunnelling needs
New order flows to be consistent
with premium returns expectations
Returned ~₹ 800 crore by way of
dividends & buyback over FY18 - FY24
CAPABLE ORGANIZATION
DIVERSIFIED OFFERINGS
ASSET LIGHT MODEL
Achieved Prestigious Great Place to Work (GPTW) certification – Best in Industry for Construction & Infrastructure
Motivated, Experienced &
Committed Leadership Team
Fosters a Culture of Learning, Innovation, Trust, & Endurance
Verticals : Transportation, Water &
Focus on operational excellence
Wastewater and Niche technologies (Welspun Michigan)
Core project management expertise
Delivery Models - HAM, BOT & EPC
Monetization of completed assets
Geographies: Maharashtra, UP, Bihar, Tamil Nadu, Haryana and more…
Execution through specialized
partners
* Consolidated order book as on September 30th 2024 and incl. ~₹ 4,400 cr. for O&M & asset replacement in MCGM STP project & Bhandup WTP project. Also includes WMEL has ~₹ 1,500 cr. of order book.
Inside this Presentation
About Welspun World
Advantage Welspun Enterprises Ltd.
Financials Q3FY25 & 9 month FY 25
Opportunities Ahead
Welspun Michigan Enterprises Ltd.
WEL – ESG At the Core
Summary Historical Financials
Appendix – Project & Investment Details
05
06
13
17
22
26
30
35
Industrial Water Treatment Plant, Dewas, Madhya Pradesh
Global Conglomerate
The USD 3.6 Bn Welspun Group is one of India’s fastest growing global conglomerates with business interests in Line Pipes, Home Textiles, Infrastructure, Steel, Advanced Textiles, Warehousing and Flooring solutions.
The group has a strong foothold in 50+ countries and its clientele includes Fortune 500 companies. USD 3.6 Bn Revenue
USD 1.8 Bn Net Fixed Assets
30,000+
Workforce
9
Manufacturing Facilities in India, USA, and Saudi Arabia.
w e l s p u n e n t e r p r i s e s . c o m
Global leader in Home Textiles
Amongst world’s largest Line-Pipe manufacturers
Robust portfolio of Roads & Water Infra projects
Integrated Grade-A Warehousing Solutions
Advantage Welspun Enterprises
This is a 3-D Render of Dharat WwTF
Creating Value through a Clear Strategy
Remain “Asset Light” + Ensure P&L supports new business
Bid for selective projects
Asset Monetization Monetize balance sheet heavy assets
Deploy right mix of contractors & support them for seamless execution
Undertake O&M Create capacity for lifecycle O&M various segments of Water projects
Manage, Complete & Stabilize Project
Municipal Water Treatment
Industrial Water Treatment
Sewerage Treatment
Rural Water Supply
National/State Highways
Niche Tunneling
Through an experienced Management
Sandeep Garg Managing Director
Abhishek Chaudhary
Saurin Patel
Chief Executive Officer
Managing Director, WMEL
Asim Chakraborty
CEO (Transportation)
Yogen Lal
CEO – Strategy , Business Development
Lalit Jain Chief Financial Officer
Lekha Raghavan Head - HR
Proven track record
~570 km
Experience of operating ~570 km of Toll projects
₹ 4,100 cr. ~65 km
Robust road portfolio
Capability to execute complex projects WEL has demonstrated high level of operational excellence with the execution of several complex projects.
Key projects :
Mukarba Chowk – Panipat Chikhali-Tarsod Gagalheri-Saharanpur-Yamunanagar Chutmalpur-Ganeshpur & Roorkee-Chutmalpur-Gagalheri Maharashtra Amravati - Package no. AM 2
Delhi Meerut Expressway
Welspun Enterprises’ completed portfolio includes the Delhi–Meerut Expressway / National Expressway 3 which was featured as an Engineering Marvel of India
India’s FIRST 14-Lane Expressway
India’s FIRST Green Expressway
Received the “Gold Award” in the
excellence in Project Management from MORTH
India’s FIRST HAM project to be
awarded AAA (SO) credit rating
India’s FIRST HAM project to receive
annuity
₹ 27 Cr.
19 Months
Early completion bonus from NHAI
Record
completion time
India’s FIRST HAM project to be re-
financed post completion
India’s FIRST Completed HAM project
(332 Days ahead of schedule)
Engineering Marvel of India Featured on History Channel
Engineering Marvels: Extreme Connects Watch Video
Awards, Accreditation & Accolades
Letter of appreciation by Prime Minister of India Shri Narendra Modi
ASSOCHAM Unique Project of the Year award presented by Shri Nitin Gadkari
“Gold award” for Excellence in Project Management under PPP mode from MoRTH
“Excellence in Project Management” award for ASRP, at ASSOCHAM Awards 2024
‘Innovative Project Design’ award to WMEL at IndSTT Trenchless Excellence Awards 2024
“Construction & Infrastructure Company of the Year” award, at Construction Times Awards 2024
Strong platform set for future growth
Robust portfolio of Water, Tunnelling, Road & WMEL
Current order book at
~₹ 14,500 Cr.* (excluding GST)
Segment Break-up
Order Book By Source
93% E X T E R N A L
Water 64%
Road 12%
WMEL 10%
Tunnelli ng 14%
C A P T I V E ( H A M P r o j e c t s ) 7%
* Consolidated order book as on December 31, 2024 and incl. ~₹ 4,400 cr. for O&M & asset replacement in MCGM STP project , Bhandup WTP project & UPJJM project. Also, includes WMEL’s order book of ~₹ 1,500 cr.
Current Order Book provides strong revenue growth visibility
Trends towards Diversification
Trend in Order Book By Source
WEL Portfolio (in ₹ Cr.)
External EPC, 4%
FY17
Captive (HAM), 96%
Way forward
Continuous focus on both development and EPC projects
Q3FY25
4,100
14,500
9,049
Development
Orderbook*
Development (Divested)
Continue approach of prudent bid strategy to strengthen portfolio
Water & Wastewater to be the key growth driver and focus area
Strategic positioning towards BOT and EPC projects
Apart from NHAI, evaluate road projects of select State and local agencies
* Consolidated order book as on December 31, 2024 and incl. ~₹ 4,400 cr. for O&M & asset replacement in MCGM STP project , Bhandup WTP project & UPJJM project. Also, includes WMEL’s order book of ~₹ 1,500 cr.
Financials
Income Statement Snapshot - Consolidated
Particulars
Q3 FY25
Q3 FY24
YoY %
9 Month FY25
9 Month FY24
YoY %
Revenue from Operations
Other Income
Total Income
EBITDA
867
52
919
180
707
47
754
174
23%
10%
22%
4%
2,563
154
2051
145
2,717
2,197
523
460
25%
6%
24%
14%
~23% Revenue CAGR over last 4 years
~25% EBITDA CAGR over last 4 years
Average PAT margin of 14% over last 4 years
EBITDA margin
19.6%
23.0%
-340 bps
19.2%
20.9%
-168 bps
PBT
Profit from discontinuing operations
PAT
Segment Revenue
Transport
Water
Tunneling and Rehabilitation
117
-6
77
328
365
174
136
-18
80
347
259
100
-14%
-4%
-6%
41%
73%
372
-24
248
359
-22
242
1241
1275
899
422
611
166
4%
3%
-3%
47%
155%
Note: Cash PAT = PBT before Exceptional Item +Depreciation + Non-cash ESOP expenses – Current tax | Prior figures have been restated wherever necessary.
Income Statement Snapshot - Standalone
Particulars
Revenue from Operations
Other Income
Total Income
EBITDA
EBITDA margin
PBT
PAT
PAT margin
Q3 FY25
Q3 FY24
YoY %
9 Month
9 Month
YoY %
683
26
709
105
584
23
607
122
17%
12%
17%
2093
1,807
81
81
2,174
1,887
-14%
333
342
16%
0.2%
15%
-3%
14.8%
20.1%
-532 bps
15.3%
18.1%
-283 bps
95
69
112
78
-15%
-11%
301
223
309
221
-3%
1%
9.8%
12.8%
-300 bps
10.3%
11.7%
-144bps
~20% Revenue CAGR over last 4 years
~30% EBITDA CAGR over last 4 years
Average PAT margin of 13.3% over last 4 years
Note: Cash PAT = PBT before Exceptional Item +Depreciation + Non-cash ESOP expenses – Current tax | Prior figures have been restated wherever necessary.
Returned ~INR 800 crore through buyback & dividends over FY18 -FY24
Grew Net worth at ~10% CAGR over 4 years, post paybacks
Balance Sheet Snapshot
Long Term Debt Short Term Debt (Working Capital Loan)
Consolidated Balance Sheet Snapshot (₹ Cr.) Net worth Gross Debt - - Cash & Cash Equivalents# Net Debt / (Cash) Other Long Term Liabilities Total Net Fixed Assets (incl. CWIP) Net Current Assets (Excl. Cash & Cash Equivalents) (adj.)*
Other Long-Term Investments and Assets (adj.)
Long Term Debt Short Term Debt (Working Capital Loan)
Standalone Balance Sheet Snapshot (₹ Cr.) Net worth Gross Debt - - Cash & Cash Equivalents# Net Debt / (Cash) Other Long Term Liabilities Total Net Fixed Assets (incl. CWIP) Net Current Assets (Excl. Cash & Cash Equivalents) (adj.)* Other Long-Term Investments and Assets (adj.)
# Includes Fixed Deposits kept with banks & investments * Mobilization advance has been included into Net Current Assets
31st Dec 2024 2,598 1,119 1,088 31 862 257 137 236 584
2,172
31st Dec 2,605 0 - 0 844 -844 11 17 403 1,352
31st March 2024 2,490 572 558 13 982 -410 126 212 258
1,736
31st March
2,422 0 - 0 923 -923 8 16 297 1,194
WEL The Road Ahead
03
Water - To be a technology-led solution provider for all needs
• Treatment solutions for Industrial / Domestic / Municipal
○ Large Volume Plants: Create platform with global technology partners such as Veolia &
Xylem for a sustainable Moat.
○ Distributed Plants: Driven by Smart Ops
○ Small scale: Product based on Smart Ops, leveraging distribution network of Welspun
Sintex
○ Operation & Maintenance – as a separate revenue stream
• Transmission Solutions
• Distribution for Industrial area / Municipalities - Non Revenue Water, One City One
Operator
• Municipal Utility Tunnels
Transportation – Pursue opportunities under asset light model
● BOT (Toll)
● Tunnel – Strategic technology collaborations for
Roads/Railways/ Metro
₹ 6.6 tn opportunity across verticals
TRANSMISSION
TREATMENT
DISTRIBUTION
-Lift Irrigation -River Linking -Water Grid Management -Municipal Tunnels
-WTP/WwTF –Wastewater Recycle Reuse -River Rejuvenation -Desalination
-Industrial/ Urban Water Distribution
-NRW reduction -One City One Operator
ROADS
TUNNELLING
Public Private Partnership
Large Diameter Tunnels
20
Retain Focus on Selected States: Across Identified Segments
•
India’s water challenge is to cater to ~18% of world population with ~4% of world’s fresh water resources
• Share of unirrigated area out of net cropped
area in India is ~45% (Niti Aayog)
•
India’s Waste Water treatment plants treat only 1/3rd of the waste water generated daily (CPCB)
• Close to 1/4th of Indian households are yet to have access to pipe water supply (Ministry of Jal Shakti)
₹ 3.6 tn across focus segments
TRANSMISSION
TREATMENT
DISTRIBUTION
- Lift Irrigation -River Linking -Water Grid Management -Municipal Tunnels
-WTP/WwTF -Wastewater Recycle Reuse -River Rejuvenation
₹ 2.1 tn
-Desalination
₹ 1.0 tn
-Industrial/ Urban Distribution
-NRW reduction -One City One Operator ₹ 0.5 tn
Wastewater Generation & Treatment Capacity GAP at City level in India (2023)
Welspun SmartOps – Unique proprietary Bioengineered Solution S.A.B.R.E*
Low on Capex & Opex
No Drain Network
Low Land Footprint – Up to 1/5th
Welspun SmartOps Treatment Plants
No Pumping Station
Low Deployment Time – Up to 1/10th
Low Energy Cost – Up to 1/10th
Source: Central Pollution Control Board
*Stabilized Aerobic & Anaerobic Bioengineered Reaction Environment
Building Water Resilience in India Bagged First Order worth ~INR 25 crores in Maharashtra
•
India’s length of NH increased to 146,000+ kms (by 2023)
• Additional 50,000+ kms to be added
• PPP is going to be one of the way to ensure
above development
₹ 3.0 tn Across Focus Segments
ROADS
TUNNELLING
Public Private Partnerships – ₹ 2.0 tn
Large Diameter Tunnels - ₹ 1.0 tn
23
Welspun Michigan Engineers Ltd. (WMEL)*
*(Formerly known as Michigan Engineers Private Limited)
About Welspun Michigan Engineers Ltd. (WMEL)
WMEL, now part of Welspun World was established in 1973. WMEL is positioned as a prominent EPC company in India with specialisation in niche business of Tunnelling and Pipeline Rehabilitation in the water & waste water segment.
Pioneer and leader in the niche segment of Trenchless Technology in India, with projects in Mumbai, Delhi, Kolkata, Gujarat & Odisha
Strong working relationships with Municipal Corporations which are. responsible for development and maintenance of Urban infrastructure in Indian cities
An integral aspect of our operations is vertical integration, which includes the presence of an in-house manufacturing and fabrication facility. This strategic setup allows us to maintain a high degree of control and quality assurance throughout the production
Proven track record (WMEL)
Tunneling teams can
execute projects requiring pipes ranging from 450 mm diameter to 3850 mm diameter.
Marine teams can execute dredging using drill blast to lay pipelines underwater. Urban teams can build deep excavation pumping stations upto 36 cusecs handling capacities.
Successful track record of
executing numerous projects across India’s largest Metropolitan cities including Mumbai and New Delhi. Executed variety of urban
specialty infrastructure projects including Marine, Bridges, Sewage and Drainage involving mechanized tunnelling solutions, pumping stations, lake taps etc.
Strong vertical integration with in-house engineering, fabrication and assembling capabilities.
In house manufacturing of all the RCC pipes and segments required for the micro tunneling and segment lining projects.
Company also manufactures the GRP and CIPP liners for rehabilitation jobs
Capability to execute complex projects
Flood mitigation in Mumbai City Watch Video
Welspun Michigan Engineers (WMEL) - Snapshot
Acquisition by Welspun Enterprises in August 2023 – Expertise and reach of Welspun Group to transform Growth Trajectory
Mr. Saurin Patel has led WMEL into New Segments to cater to Emerging Needs in India
Financial Snapshot
Unexecuted Order book of ~ 2,600cr including subcontracting of DGT order by WEL .
Financial Year (₹. Cr.)
FY21
FY22
FY23 FY24 CAGR
Revenue
209
293
320
412
25%
EBITDA
39
57
69
99
36%
EBITDA Margin
19%
20% 22% 24%
-
Rehab 12%
Bridge 5%
Pumping Station 7%
Marine 1%
Tunneling 75%
Segment tunneling Micro tunneling • Rehabilitation of Underground pipelines
• Deep Storm water pumping stations • Underwater, Drilling, Blasting, Dredging • Bridges, Subways
• SmartOps
WEL - ESG At The Core
Leading Practices - Environment, Health & Safety
01
GHG Inventory and Data Management
• Scope 1 & 2 emission adopted India GHG inventory program, IPCC Guidelines for
National GHG inventories and Central Electricity Authority (CEA) India
02
Water Management
• Regular trainings & awareness sessions for water savings, reducing
bottled water consumption & Active tracking of domestic & processed
03
Health and Safety
• Various HSE campaigns like Road Safety, National Safety Day,
World Environment Day, etc. were organized for Transportation & Water business projects
• WEL HSE received recognition at multiple forums, securing 5 HSE awards from CIDC (GOI), OHS India & World Safety Organization for ongoing projects i.e. ASRP, VARP & UPJJM
04
ESG Disclosures
• Published 1st Business Responsibility & Sustainability Report (BRSR) • Received C-CDP ESG rating, aspiring for higher rating in FY24-25
05
Governing Purpose
source points encompassing 16 contractors
• Monitoring data from all projects sites involving 10 parameters from 37
• Adopted Core governing principles of Transparency & Accountability, Board Oversight Committees, Code of Ethics and Climate-Related Risk management
Key Performance Highlights ESG
Leading Practice – CSR initiatives 3Es
Audit Committee
• 3 Members - all Independent Directors
Nomination & Remuneration Committee
• 3 Members - all Independent Directors
Stakeholders’ Relationship, Share Transfer & Investors’ Grievance
• 3 Members - all Independent Directors
Risk Management
• 3 Independent Directors & Managing Director
Environment, Social & Governance & Corporate Social Responsibility
• 3 Independent Directors
Project Review
• 2 Independent Directors & Managing Director
Summary Historical Financials
Highway Portfolio Monetization - Actis Deal
Project Name
Contract Type
Authority /Client
Status
In ₹ Cr.
2,309
1,715
1.5x
Delhi-Meerut Expressway (Pkg 1)
Chutmalpur-Ganeshpur
Gagalheri-Saharanpur-Yamuna nagar
Chikhali-Tarsod
Maharashtra Amravati (Pkg AM 2)
HAM
HAM
HAM
HAM
HAM
NHAI
NHAI
NHAI
NHAI
COD achieved
COD achieved
COD achieved
COD achieved
MH PWD
COD achieved
Mukarba Chowk – Panipat
BOT (Toll)
NHAI
PCOD achieved
Receivables
Obtained all necessary regulatory and statutory approvals for First Closing and divestment of 100% stake in HAM assets and 49% stake in BOT toll assets from NHAI, PWD and lenders.
Received ₹ 244.5 cr. against total receivable of ₹ 259.5 cr From Actis
₹ 269 cr. to be received from Actis on 51% equity approval from NHAI for Mukarba Chowk – Panipat project
Equity Invested (Book Value)
Proceeds from Divestment
~₹ 6,000 Cr. Enterprise Value
# Excl. ~₹ 3,000 Cr. Construction linked milestone / grant payments received/receivable from NHAI and PWD - Government of Maharashtra
~₹ 3,544 Cr. Debt* As on the date of First Closing
*includes the undisbursed portion of ₹ 92 cr.
Summary Standalone Financial Highlights
Particulars (₹ Cr.)
Revenue
Operating EBITDA
Other Income
Exceptional income
Finance Cost
Depreciation
Tax
PAT (With Exceptional)
PAT Margin
FY-21
1,410
169
29
0
45
12
34
108
7.5%
FY-22
1,307
144
38
0
53
12
23
95
7.1%
FY-23
2,676
237
99
510
76
10
47
710
25.6%
FY-24
2,450
337
102
-
33
10
111
285
11%
Steady & Prudent Growth
Revenue CAGR of ~20% delivered over 4 years from FY21 to FY24
Average PAT margin of ~13% over a 4 years period encapsulates our strategy of Value Creation through monetization of project portfolio
Early and successful creation of Water vertical, to accelerate growth
Balance Sheet Summary
Particulars (₹ Cr.)
Gross Debt
Cash & Cash Equivalent
Net Cash
Net Worth
Core Investments
Long Term Investments
Payback to Investors
FY-21
602
381
-221
1,819
1,622
320
30
FY-22
502
194
-307
1,894
1,812
393
22
FY-23
292
1,842
1,549
2,465
488
424
135
FY-24
-
923
923
2,422
751
448
42*
Value Creation at its Core
Returned over ₹ 800 crore by way of dividends & buyback over FY18-FY24
Net worth increased from ~ ₹ 1350 crore in FY17 to ~ ₹ 2400 crore in FY24
Well placed for next leg of growth
Consistently Light on Working Capital
Net Working Capital (Days)
71
73
60
3
FY-23
FY-22
-19 Debtor Days
Net Working Capital
FY-21
-5
Key Highlight of WEL Model • WEL Consistently operates with near negative working capital
• Selective sourcing of inventory to ensure quality & timely work progress
89
15
FY24
WEL has returned CAGR of 63%, against Nifty Small Cap 250 return of 46%
19%
20%
17%
38
13%
ROE & ROCE computed by apportioning exceptional gains in FY23, over FY20-23
APPENDIX
Existing Portfolio of Projects
1
2
3
4
5
6
7
8
9
HAM: Aunta - Simaria (Ganga Bridge with Approach Roads)
HAM: Sattanathapuram – Nagapattinam
EPC: Varanasi Aurangabad NH2 Project
EPC: UP State Water and Sanitation Mission
EPC: Dharavi Wastewater Treatment Facility (Mumbai)
EPC: Bhandup Water Treatment Complex (Mumbai)
EPC: Water Conveyance Tunnell (Mumbai)
BOT: Dewas Water
Investment in oil & gas blocks: potential value accretion
10
Portfolio of Welspun Michigan Engineers Projects
Diversified Infrastructure Portfolio
Water/ Wastewater
Treatment
Tunneling
Welspun Enterprises
Road Assets
Oil & Gas
Welspun Michigan Engineers
Project Names
Contract Type
Authority / Client
Status
Dewas Water
UP State Water and Sanitation Mission
Bhandup Water Treatment Complex (Mumbai) Dharavi Wastewater Treatment Facility (Mumbai)
Water Conveyance Tunnel
Aunta-Simaria (ASRP)
Sattanathapuram-Nagapattinam (SNRP)
Varanasi Aurangabad NH2 Project (VARP)
3 Oil & Gas Blocks
3 Segment Tunnelling Projects
6 Micro Tunnelling Projects
6 Pumping Station Construction
3 Sewer Line Rehabilitation
2 Bridges
1 Marine Disposal Line Replacement
BOT
EPC
EPC
EPC
EPC
HAM
HAM
EPC
-
EPC
EPC
EPC
EPC
EPC
EPC
MPSIDC
Operational
SWSM
BMC
MCGM
MCGM
NHAI
NHAI
Under Execution
Under Execution
Under Execution
Awarded in Oct ‘24
Under Execution
Under Execution
SIVAPTL
Under Execution
-
BMC
BMC
Revenue from first block expected in FY26 -27
Under Execution
Under Execution
BMC/NMMC
Under Execution
BMC/AMC
Under Execution
BMC
MIDC
Under Execution
Under Execution
HAM Aunta-Simaria (Ganga Bridge with Approach Roads)
SCOPE Six- Laning from Aunta-Simaria (Ganga Bridge with Approach Roads) Section from km 197.9 to km 206.1 of NH-31 in Bihar. Includes widest extradosed bridge on Ganga river
STATUS NHAI declared the Appointed Date as 30th August 2018
The project is under execution
BARAUNI REFINERY
SIMARIA
MALHIPUR
AUNTA
Project details
Project Length (Kms)
Acquisition Date
Financial Closure
Appointed Date
08.15 Km
Aug 2018
Achieved
30th Aug 2018
Scheduled Construction Period
42 Months^
Concession Period after COD
15 Years
^ EOT up to 31st May 2025 recommended by RO,NHAI
Project cost & financing * (₹ Cr.)
Bid Project Cost (with forecasted escalation)
Means of Finance
NHAI
Debt
Sponsor’s Commitment
O&M Payment (First Year)
* Forecasted figures
1,568.0
627.2
648.0
156.0
9.9
HAM Sattanathapuram- Nagapattinam (SNRP)
SCOPE 4 laning of Sattanathapuram to Nagapattinam (Design Ch Km 123.8 to Km 179.6) section of NH-45A (New NH -332) in Tamil Nadu
STATUS Received Appointed Date on 5th October 2020 with 4 lane road & 4 lane structures as against 4 lane road & 6 lane structures specified in the Concession Agreement
The project is under execution.
SATTANATHAPURAM
NAGAPATTINAM
Project details
Project Length (Kms)
Award Date
Financial Closure
Appointed Date
55.755 Km
July 2018
Achieved
5th Oct 2020
Scheduled Construction Period
24 months^
Concession Period after COD
15 Years
^ EOT up to 31st Oct 2025 recommended by IE
Project cost & financing * (₹ Cr.)
Bid Project Cost (with forecasted escalation)
Means of Finance
NHAI
Debt
Sponsor’s Commitment
2,511.0
1,000.9
1,057.0
265.0
O&M Payment (First Year)
5.0
* Forecasted figures
EPC Varanasi Aurangabad NH2 Project (VARP)
SCOPE
Six laning of Varanasi –
Aurangabad section of NH-2 from
km 786.00 to km 978.00 (length
192.400 km) in the State of Uttar
Pradesh & Bihar
Project details
Project Length (Kms)
192.4
Original Contract
Commencement Date
30th Sep 2021
Construction Period
24 Months
Additional Contract
Construction Start Date
Construction End Date
^ EOT up to 30th Jun 2025 recommended by IE
May 2022
Nov 2023^
Status
•
Total contract value of ~₹ 3,266 Cr. (excluding GST) comprising original scope and order for additional scope
EPC UP State Water and Sanitation Mission
SCOPE
Rural Water Supply project under
Jal Jeevan Mission by State
Water Sanitation Mission UP,
scope includes Survey, Design,
Preparation of DPR, Construction,
Commissioning and O&M for 10
years of various Rural Water
Supply Projects in the State of
Uttar Pradesh
Project details
Project Scope
Water Supply to Villages
Est aggregate contract value (excluding O&M value and GST)
₹ ~ 2,800 Cr.
S No. Revenue
District
Division
No of Villages
1
2
3
4
5
Varanasi
Jaunpur
Varanasi
Sant Ravidas Nagar
Ayodhya
Ambedkar Nagar
Ayodhya
Amethi
Meerut
Bulandshahr
Total No of Villages
747
877
241
240
439
2,544
EPC Wastewater Treatment Facility - Mumbai Sewage Disposal Project, Dharavi
SCOPE
Design, Build, Operation and
Maintenance of 418 MLD Dharavi
Wastewater Treatment Facility
including 209 MLD Tertiary
treatment facility under Mumbai
Sewage Disposal Project, Stage II
(Priority Works)
Above is a 3-D model
Project details
Contract period
60 Months for Design Build, 15 years of operation and maintenance
Status
LOA received on May 27, 2022
Project Commencement date – July 4, 2022
Total consideration of ~₹ 4,636 Cr. (inclusive of GST)
EPC Dharavi Project - India’s First Multi-Storeyed Wastewater Treatment Facility
• A first-of-its-kind project in the country, this facility is being constructed vertically, due to the space constraints at the project site.
• Being built on just 12.7 acres of land, it has one of the lowest footprint per MLD
• Capable of treating sewage
generated by a population of nearly 3.5 million people
• 50% of this treated wastewater
will be tertiary treated
Above is a 3-D render
EPC Water Treatment Plant – Bhandup Complex, Mumbai
SCOPE
Design, Build, Operation and
Maintenance of 2,000 MLD Water
Treatment Plant at Bhandup
Complex, Mumbai.
Above is an illustrative image
Project details
Contract period
48 Months for Design Build, 15 years of operation and maintenance
Status
LOA received on Feb 29, 2024
Received Notice to Commence effective July 23, 2024
Total consideration of ~₹ 4,123.8 Cr. (inclusive of GST)
EPC Water Conveyance Tunnel from Dharavi WWTF to Ghatkopar WWTF– Mumbai
SCOPE
Design and construction of
Tertiary Treated Water
Conveyance Tunnel of 8.48km
length with a 3,500 mm bored
diameter.
Above is an illustrative image
Project details
Contract period
93 Months for Design Build of a 8.48 km tunnel with a 3,500 mm bored diameter
Status
LOA received on Oct 8, 2024
Received Notice to Commence effective Nov 29, 2024
Total consideration of ~₹ 1,989.4 Cr. (Excluding GST)
BOT Dewas Water
Sector
Project Name
Location
COD
Concession End
Water Supply
Dewas Water*
MP
Apr-20
Jun-37
*Dewas Water – Modified Project
Modified project involves the supply of treated water of up to 23 MLD to industrial customers in Dewas
FY24 revenue stands at ₹ 12.37 Cr. with EBITDA of ₹ 6.27 Cr.
• Adani Welspun Exploration Ltd (AWEL), a 65:35 JV between Adani
Group & WEL, is the key investment vehicle, with 2 blocks in development
• MB-OSN-2005/2 “Mumbai Block” (100% stake) – Field Development
Plan (FDP) is awaiting DGH clearance
• B9 Cluster (100% stake) - FDP is in place
• The above blocks have potential Gas Initially in Place (GIIP) in the
range of 600 billion cubic feet
• Expect Revenue to commence in FY27/28
• Future capital spend decision will be post FDP approval and subject
to Board clearance
50
Thank You
For further details please contact
investorrelations_WEL@welspun.com/sangeeta_tripathi@welspun.com Ms. Sangeeta Tripathi, Lead - Investor Relations Mr Salil Bawa, Head – Group Investor Relations
CORPORATE OFFICE WELSPUN ENTERPRISES LIMITED CIN: L45201GJ1994PLC023920 C/8, BKT House, Trade World, Kamala City, Senapati Bapat Marg, Lower Parel, Mumbai - 400 013, India
Connect with us:
/WelspunWorld
/WelspunWorld
/welspungroup
/company/welspunworld
51