The Anup Engineering Limited
1,688words
6turns
0analyst exchanges
0executives
Key numbers — 40 extracted
rs,
26
%
44%
3%
6%
32%
15%
20.0%
22.4%
23.0%
22.6%
21.3%
Guidance — 8 items
Ref.
opening
“Investor Presentation Q1 FY26 05th August 2025 | Ahmedabad INVESTOR PRESENTATION Q1 FY26 SAFE HARBOR Certain statements contained in this document may be statements of future expectations and other forward looking statements that are based on management‘s current view and assumptions and involve known and unknown risks and uncertainties that could cause actual results, performance or events to differ materially from those expressed or implied in such statements.”
Ref.
opening
“2 INVESTOR PRESENTATION Q1 FY26 CONTENT CONTENTS 1.”
Ref.
opening
“• Now Phase-2(A) construction at Kheda is in progress with capex of INR 50 Crore, which will have TWO Bays (1 complete bay and 1 open bay) and likely to commission in Q2 FY26.”
Ref.
opening
“11 INVESTOR PRESENTATION Q1 FY26 04 ANNEXURES INVESTOR PRESENTATION Q1 FY26 ANNEXURES ABOUT THE GROUP ₹4620Cr in revenues • Branded Apparel • Accessories • Speciality Retail ₹8329Cr in revenues • Denim, Woven and Knitted fabrics • Garments • Advanced Materials (including Composites) • Water and waste water solutions • Telecom ₹733Cr in revenues ₹713Cr in revenues • Engineered Heavy Process Equipment • Heat Exchangers, Pressure Vessels etc.”
MANUFACTURING PLANT
opening
“AHMEDABAD HIGHLIGHTS • Total shop area: 45,000 m2 • Covered area (under the hook): 23,000 m2 • Under the hook height: up to 15 m • Maximum diameter: 5.5 m (Transportation Limitation) • Production length: up to 50 m • Weight capacity: up to 500 MT for single-piece equipment ISO 8 Class Clean Room for Exotic Material Fabrication (500 m2 Area) 17 INVESTOR PRESENTATION Q1 FY26 ANNEXURES”
MANUFACTURING PLANT
opening
“KHEDA HIGHLIGHTS • Total shop area: 125,000 m2 • Covered area (under the hook): 10,000 m2 PHASE 1+ • Under the hook height: up to 17 m • Maximum diameter: 8.5 m (Transportation Limitation) • Production length: up to 100 m • Weight capacity: up to 1000 MT for single-piece equipment • Operational from June 2023 Phase 1 (2 bays) - commissioned in June 2023 Phase 2A (2 bays) – Construction started on 1st Oct 2024 Phase 3 (3 bays) – Future Plan 18 INVESTOR PRESENTATION Q1 FY26 ANNEXURES”
MANUFACTURING PLANT
opening
“• Has Site fabrication capabilities 19 INVESTOR PRESENTATION Q1 FY26 ANNEXURES LICENSES & COLLABORATIONS GERMANY POLYMARIZATION REACTORS (Licensee) ITALY: EM BAFFLE HEAT EXCHANGERS (Licensee) NETHERLANDS: HELIXCHANGERS (Licensee) USA: HEAT EXCHANGERS & PRESSURE VESSELS (Manufacturing Collaboration) 20 INVESTOR PRESENTATION Q1 FY26 ANNEXURES OUR ENGINEERING CAPABILITIES CODES AND STANDARDS • ASME Sec I • CRN (Canada) • ASME Sec VIII Div.”
MANUFACTURING PLANT
opening
“21 INVESTOR PRESENTATION Q1 FY26 ANNEXURES OUR DESIGNING CAPABILITIES SOFTWARE • HTRI (Xist & X Vib; Version 8 SP3) • ANSYS 18 & NozzlePRO • PVElite • Autopipe (Microprotol) • PDS (Inventor) • 3D PV • AutoCAD Our team of experts boasts specialized skills in Thermal & Mechanical Design, Vibration Analysis, Finite Element Analysis (FEA), and 3D Modelling.”
Advertisement
Risks & concerns — 2 flagged
11 INVESTOR PRESENTATION Q1 FY26 04 ANNEXURES INVESTOR PRESENTATION Q1 FY26 ANNEXURES ABOUT THE GROUP ₹4620Cr in revenues • Branded Apparel • Accessories • Speciality Retail ₹8329Cr in revenues • Denim, Woven and Knitted fabrics • Garments • Advanced Materials (including Composites) • Water and waste water solutions • Telecom ₹733Cr in revenues ₹713Cr in revenues • Engineered Heavy Process Equipment • Heat Exchangers, Pressure Vessels etc.
— Ref.
• Has Site fabrication capabilities 19 INVESTOR PRESENTATION Q1 FY26 ANNEXURES LICENSES & COLLABORATIONS GERMANY POLYMARIZATION REACTORS (Licensee) ITALY: EM BAFFLE HEAT EXCHANGERS (Licensee) NETHERLANDS: HELIXCHANGERS (Licensee) USA: HEAT EXCHANGERS & PRESSURE VESSELS (Manufacturing Collaboration) 20 INVESTOR PRESENTATION Q1 FY26 ANNEXURES OUR ENGINEERING CAPABILITIES CODES AND STANDARDS • ASME Sec I • CRN (Canada) • ASME Sec VIII Div.
— MANUFACTURING PLANT
Speaking time
3
1
1
1
Advertisement
Opening remarks
Sub.
Investor Presentation on Unaudited Financial Results of the Company for the quarter ended on 30th June, 2025
Ref.
Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015 Pursuant to Regulations 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, we enclose herewith Investor Presentation issued by the Company in respect of Unaudited Financial Results of the Company for the quarter ended 30th June, 2025. The copy of Investor Presentation will also be made available on Company’s website i.e. https://www.anupengg.com/quarterly-report/. You are requested to take the above on your records. Thanking you, Yours faithfully, For, The Anup Engineering Limited Lay Desai Company Secretary Membership No.: A57117 Encl.: As Above THE ANUP ENGINEERING LIMITED CIN: L29306GJ2017PLC099085 Registered Office: Behind 66 KV Elec. Sub Station, Odhav Road, Ahmedabad-382 415, Gujarat, India. T: +91 79 4025 8900 E: anup@anupengg.com The Anup Engineering Ltd. Investor Presentation Q1 FY26 05th August 2025 | Ahmedabad INVESTOR PRESENTATION Q1 FY26 SAFE HARBO
MANUFACTURING PLANT
AHMEDABAD HIGHLIGHTS • Total shop area: 45,000 m2 • Covered area (under the hook): 23,000 m2 • Under the hook height: up to 15 m • Maximum diameter: 5.5 m (Transportation Limitation) • Production length: up to 50 m • Weight capacity: up to 500 MT for single-piece equipment ISO 8 Class Clean Room for Exotic Material Fabrication (500 m2 Area) 17 INVESTOR PRESENTATION Q1 FY26 ANNEXURES
MANUFACTURING PLANT
KHEDA HIGHLIGHTS • Total shop area: 125,000 m2 • Covered area (under the hook): 10,000 m2 PHASE 1+ • Under the hook height: up to 17 m • Maximum diameter: 8.5 m (Transportation Limitation) • Production length: up to 100 m • Weight capacity: up to 1000 MT for single-piece equipment • Operational from June 2023 Phase 1 (2 bays) - commissioned in June 2023 Phase 2A (2 bays) – Construction started on 1st Oct 2024 Phase 3 (3 bays) – Future Plan 18 INVESTOR PRESENTATION Q1 FY26 ANNEXURES
MANUFACTURING PLANT
MABEL HIGHLIGHTS • Total shop area: 20,000 m2 • Covered area (under the hook): 5,100 m2 • Under the hook height: up to 10 m • Maximum diameter: 5.0 m (Larger dimensions Site fab) • Weight capacity: up to 75 MT • U Stamp Certified • Manufactures and qualified under EIL for SILOS. • Has Site fabrication capabilities 19 INVESTOR PRESENTATION Q1 FY26 ANNEXURES LICENSES & COLLABORATIONS GERMANY POLYMARIZATION REACTORS (Licensee) ITALY: EM BAFFLE HEAT EXCHANGERS (Licensee) NETHERLANDS: HELIXCHANGERS (Licensee) USA: HEAT EXCHANGERS & PRESSURE VESSELS (Manufacturing Collaboration) 20 INVESTOR PRESENTATION Q1 FY26 ANNEXURES OUR ENGINEERING CAPABILITIES CODES AND STANDARDS • ASME Sec I • CRN (Canada) • ASME Sec VIII Div. I & II • ARH (Algeria) • EN 13445 / PED • GOST R / TRCU • IBR • TEMA / API • AD-2000 Merkblatt HP0 • SAS (South Africa) • NR 13 (Brazil) • AS (Australia) • DOSH (Malaysia) At The Anup Engineering Limited, we pride ourselves on our commitment to excellence and adherence to global