Vikram Solar Limited has informed the Exchange about Investor Presentation
September 10, 2025
BSE Ltd. Department of Corporate Services P. J. Towers, Dalal Street, Mumbai – 400 001.
(Scrip Code: Equity - 544488)
Dear Sir/ Madam,
VSL/CS/196/2025 dated 10.09.2025
National Stock Exchange of India Ltd. Listing Department Exchange Plaza, Bandra-Kurla Complex, Bandra (E), Mumbai – 400 051 (Symbol: VIKRAMSOLR, Series EQ)
Sub: Disclosure under Regulation 30 of SEBI (Listing Obligations and Disclosure Requirements) Regulations 2015 – Investors Presentation on Q1FY26
Pursuant to Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, we are enclosing herewith the copy of Q1FY26 Investor Presentation of the Company for the quarter ended June 30, 2025.
We request you to kindly take the aforesaid information on record.
Thanking You,
For and on behalf of VIKRAM SOLAR LIMITED
SUDIPTA BHOWAL Company Secretary & Compliance Officer
Encl. As Above
Investor Presentation Q1 FY2026
| PAGE 1
Safe Harbour
This presentation and the accompanying slides (the “Presentation”), which have been prepared by Vikram Solar Limited (the “Company”), have been prepared solely for information purposes and do not constitute any offer, recommendation or invitation to purchase or subscribe for any securities, and shall not form the basis or be relied on in connection with any contract or binding commitment whatsoever. No offering of securities of the Company will be made except by means of a statutory offering document containing detailed information about the Company.
This Presentation has been prepared by the Company based on information and data which the Company considers reliable, but the Company makes no representation or warranty, express or implied, whatsoever, and no reliance shall be placed on, the truth, accuracy, completeness, fairness and reasonableness of the contents of this Presentation. This Presentation may not be all inclusive and may not contain all of the information that you may consider material. Any liability in respect of the contents of, or any omission from, this Presentation is expressly excluded.
Certain matters discussed in this Presentation may contain statements regarding the Company’s market opportunity and business prospects that are individually and collectively forward-looking statements. Such forward-looking statements are not guarantees of future performance and are subject to known and unknown risks, uncertainties and assumptions that are difficult to predict. These risks and uncertainties include, but are not limited to, the performance of the Indian economy and of the economies of various international markets, the performance of the industry in India and world-wide, competition, the company’s ability to successfully implement its strategy, the Company’s future levels of growth and expansion, technological implementation, changes and advancements, changes in revenue, income or cash flows, the Company’s market preferences and its exposure to market risks, as well as other risks. The Company’s actual results, levels of activity, performance or achievements could differ materially and adversely from results expressed in or implied by this Presentation. The Company assumes no obligation to update any forward-looking information contained in this Presentation. Any forward-looking statements and projections made by third parties included in this Presentation are not adopted by the Company and the Company is not responsible for such third-party statements and projections.
All Maps used in the presentation are not to scale. All data, information, and maps are provided "as is" without warranty or any representation of accuracy, timeliness or completeness.
V i k r a m S o l a r L i m i t e d
2
2
About Vikram Solar
Introduction
4.5 GW Module manufacturing capacity
17.5 GW Planned Capacity in India (FY27)
Reliable BRAND in Solar Solutions for the World’s Clean Energy Future
12 GW Solar Cell
5 GWh BESS
7.88 GW
Manufacturing Capacity Planned (FY27)
Manufacturing Capacity Planned (FY27)
Modules Sold since Inception*
10.96 GW Order Book*
>2X of Total Rated Capacity
One of India's largest Solar PV module manufacturer, growing from 4.5 GW operational capacity in FY25 to 17.5 GW in 2 years
12 GW capacity backward integrated to cell by FY27, poised to capitalize the large DCR market (including ALMM List-II compliance)
Automatic turnkey module production line with robotic process automation to enhance agility and efficiency; entirely compliant with N-Type Technology
8th time featured in KIWA PVEL Reliability Scorecard Top
Performer list
6th consecutive quarter Tier-1 Manufacturer in bankability test (Bloomberg NEF rankings)
NABL and ILAC MRA Accredited lab consistently producing accurate testing, sampling and calibration results
Designed and installed the world’s first fully solarized airport in Kochi, Kerela of 100kW capacity
Featured in the KIWA Photo-Voltaic Evolution Labs (PVEL) module reliability scorecard for the 8th time since 2017
Listed as one of the first few players to introduce half-cut cell module technology in India as per ALMM notified by MNRE in March 2021
*As on 30th June 2025
V i k r a m S o l a r L i m i t e d
4
4
Legacy Built on Strong Brand Recognition and Reliability
VISION
To become one of the most valuable solar company delivering benchmark sustainable energy solutions worldwide
MISSION
Deliver reliable solar solutions through world class technology and innovation
Incorporated
Contributed to 1st Fully Solarized Airport
500 MW Production Capacity
Rooftop Project : 2.15 MW 200 MW project in AP
3.5 GW production capacity. NABL Accredited Lab
4.5 GW production capacity Won 1 GW module supply order
2005
2013
2015
2019
2023
2025
2011
2014
2017
2022
2024
2025
3MW Capacity Installed
BNEF Tier 1 Manufacturer List
1 GW Production Capacity
2.5 GW annual rated production capacity
PVEL : 8th Time Top performer BNEF Tier 1 : module manufacturer
Listed on Stock Exchanges BSE & NSE
V i k r a m S o l a r L i m i t e d
5
State of the Art Manufacturing Facilities
Tamil Nadu
West Bengal
Both facilities are certified with •
ISO 14001:2015,
•
•
•
•
ISO 45001:2018,
ISO 9001:2015,
ISO/IEC 27001:2013 &
SA 8000:2014
Location
Capacity
Chennai
1.3 GW
Falta Sez, Kolkata
3.2 GW
Area
>1,00,000 sq. feet
>4,50,000 sq. feet
All facilities are N-Type and MONO-PERC capable
Automatic turnkey module production lines with robotic process automation
Real time data capturing and machine, manufacturing process monitoring
V i k r a m S o l a r L i m i t e d
6
Robust Dealer & Distributor Network
Presence in
19
States
2
Union Territories
With
95+
Authorized Distributors
375+
Dealers Pan India
75+
Systems Integrators
Capitalize on demand from rooftop-based solar solutions
Pan-India presence through extensive distributor & dealer network
Launched Digital Platform for distributor network & customer relationship management
Manufacturing Plant
Authorized Distributors
Map not to scale
V i k r a m S o l a r L i m i t e d
7
Vikram Solar’s Competitive Edge
Scale & Size ✓ Two Manufacturing locations at proximity to the ports ✓ 4.5GW of annual operational capacity to be expanded to 17.5GW by FY27
Reliability ✓ 8th time feature in KIWA PVEL Reliability Scorecard Top Performer list
Strong R&D Focus ✓ NABL accredited and ILAC MRA accredited Lab ✓ 196 Members in R&D and QC team
Technology ✓ Automated manufacturing process ✓ SAP/BI based control algorithms to track product quality ✓ In-house R&D driving innovation and cost-efficiency
Product Improvements in last 2 Decades ✓ Continuously improved module wattages and efficiencies ✓ Wattages improved from 200W to 735W; 250%+ growth ✓ Efficiencies improved from 11.5% to 23.66%, 100%+ growth
Brand ✓ One of India’s leading module manufacturers with global presence ✓ Recognized for quality Certifications and customer trust
Our Brands
Tech & Specifications
- HJT-Technology - Bifacial Solar cells - Up to 23.66% Efficiency - 710-735W
- N-Type - Bifacial Solar cells - Up to 23.51% Efficiency - 690-715W
- MONO-PERC - Bifacial Solar cells - Up to 22.01% Efficiency - 655-680W
- MONO-PERC - Bifacial Solar cells - Up to 21.89% Efficiency - 655-680W
- MONO-PERC - Monofacial Solar cells - Up to 21.94% Efficiency - 655-680W
V i k r a m S o l a r L i m i t e d
8
Brand Building through Strategic Campaigns
BRAND STRATEGY IN ACTION
Customer Focused
Campaigns tailored to B2B and B2C needs
Emotional + Product Appeal
Hanji builds trust, G12R showcases innovation
Trust & Quality
Precision Outreach
360° Brand Presence
Backed by Tier-1 status, strong warranties, and industry awards
Programmatic ads, influencers, and regional targeting
Consistent voice across TV, digital, print, OOH, and sports
VISUAL SHOWREEL OF CAMPAIGNS
Khushiyon wali Sunshine
G12R Launch Campaign (Product-led, High-tech credibility)
Hanji Campaign & TVC (Mass media appeal)
“KKR Partnership” (Sports Sponsorship - Brand each & Mass Recall)
V i k r a m S o l a r L i m i t e d
9
9
Future Ready with Capacity Expansion & Backward Integration
India expansion plans and project timeline in place to reach 17.5 GW Module & 12 GW Cell Capacity by FY 2027
Modules (GW)
Solar Cells (GW)
17.5
by establishing a Solar Cell manufacturing facility in
Strategically Integrating Backward into the solar value chain
15.5
Gangaikondan, Tamil Nadu
12.0
3.5
4.5
2.5
FY 2023
FY 2024
FY 2025
FY 2026E
FY 2027E
FY 2027E
Expanding Module Manufacturing Capacity to 17.5 GW
Backward Integration into Solar Cell Manufacturing with 12 GW Capacity
Strengthening the Value Chain, Accelerating Growth
V i k r a m S o l a r L i m i t e d
10
Project Updates
Vallam, Tamil Nadu (5GW Module)
Gangaikondan, Tamil Nadu (6GW Module + 12GW Cell)
Strategic Partnerships to Strengthen Project Execution
Project Status
Project Status
✓ Engineering & Procurement Complete ✓ Delivery & Construction in full swing ✓ Commissioning expected as per project
timelines
✓ Long lead engineering & procurement
complete
✓ All preconstruction approvals received ✓ Production equipment tied up & construction
in full swing
Project Management Partner
Integrated Turnkey Partner
Equipment Vendors and System Integrators
Technology Partner
Design Engineering Partner
Driving timely project completion through Strategic Partnerships and Proven Execution Track Record
V i k r a m S o l a r L i m i t e d
11
Q1FY26 Financial & Operational Highlights
Key Updates
1
Secured 250 MW Solar Module Supply Order from Bondada Group in Maharashtra
2
Secured Solar Module Supply Orders of 326 MW and 336 MW from GIPCL and L&T respectively
6
Launched its first ever TVC ad campaign — ‘Khushiyon Wali Sunshine’
3
Recognized as Top Brand PV India 2025 From EUPD Research
4
Achieved “Top Performer 2025” Status in Kiwa PVEL’s PQP for the 8th Time
5
Received an EcoVadis Platinum Medal, ranking it in the top 1% worldwide for sustainability performance
V i k r a m S o l a r L i m i t e d
13
Key Operational Highlights – Q1 FY26
Order Book*
Revenue (INR Cr)
Gross Profit (INR Cr)
80%
1,134
95%
356
10.96 GW
631
182
Q1FY25
Q1FY26
Q1FY25
Q1FY26
EBITDA (INR Cr)
EBITDA Margin (%)
117%
242
370 bps
21.4%
17.7%
111
PAT (INR Cr)
484%
133
23
Q1FY25
Q1FY26
Q1FY25
Q1FY26
Q1FY25
Q1FY26
*As on 30th June 2025
V i k r a m S o l a r L i m i t e d
14
Consolidated Profit & Loss Statement – Q1 FY26
Profit and Loss (INR Cr)
Revenue from Operations
Cost of Goods Sold
Gross Profit
Gross Profit Margin
Employee Cost
Other Expenses
EBITDA
EBITDA Margin
Depreciation
Other Income
EBIT
EBIT Margin
Finance Cost
Exceptional Item Gain / (Loss)
Profit before Tax
Profit before Tax Margin
Tax
Profit After Tax
Profit After Tax Margin
EPS (Basic)
Cash PAT*
Q1FY26
Q1FY25
1,133.6
777.8
355.8
31.4%
35.4
78.2
242.2
21.4%
33.5
4.2
212.9
18.8%
32.3
0.0
180.6
15.9%
47.2
133.4
11.7%
4.21
166.9
630.9
448.6
182.3
28.9%
26.6
44.2
111.5
17.7%
37.3
6.2
80.4
12.7%
44.9
0.0
35.5
5.6%
12.7
22.8
3.6%
0.75
60.1
YoY
79.7%
95.2%
250 bps
117.3%
370 bps
164.9%
610 bps
408.7%
1,030 bps
483.9%
810 bps
FY25
3,423.5
2,554.6
868.9
25.4%
124.4
252.5
492.0
14.4%
156.0
36.1
372.1
10.9%
154.7
0.0
217.4
6.3%
77.6
139.8
4.1%
4.61
177.5%
295.8
FY24
2,511.0
1,678.9
832.1
33.1%
96.3
337.2
398.6
15.9%
138.0
12.9
273.5
10.9%
154.6
11.6
107.3
4.3%
27.6
79.7
3.2%
3.08
217.7
YoY
36.3%
4.4%
(770 bps)
23.4%
(150 bps)
36.0%
-
102.6%
200 bps
75.4%
90 bps
35.9%
*Cash PAT = PAT + Depreciation
V i k r a m S o l a r L i m i t e d
15
Annexures
Multiple drivers supporting India’s moment in the Energy- Transition Supercycle
Energy and Energy transition supply chain trends
Domestic tailwinds that fuel this megatrend
AI to drive energy demand
Solar + Storage Boom imminent
Policy support to scale supply chain
Shift to a self- sustaining market
Integrated players to win the market
PM KUSUM
CPSU & Grid Connected scheme
PLI
PM Surya Ghar Muft Bijli Yojana
ALMM List 1 & 2
Net zero target by 2070
3,700 GW Global additions till 2030(1)
180 GW India’s solar additions by 2030
236 GWh India’s Storage target(2) by 2030
10,830 GW India’s Solar Potential(3)
1. 2. 3.
As per Crisil Report As per National electricity plan by CEA As per TERI report, 2025
V i k r a m S o l a r L i m i t e d
17
India’s energy transition underway: solar demand set to soar backed by a rapidly unfolding supply chain
Clear runway for Solar to lead the renewable energy capacity mix; policy tailwinds such as RPO, Green energy corridor making solar preferred choice for future capacity additions
Energy Outlook
1
20
9
49
Coal
Gas
Diesel
Nuclear
Large Hydro
Renewable
221
12
5
Solar Target 2030
185
52
280 GW
116
Domestic Demand
Domestic installation additions (AC) in GW
Module demand - 1.5X DC OVERLOADING
Open Access
Rooftop
Utility
50
40
30
20
10
0
24 3 6
15
25 3 5
17
26 3 5
18
37
7
8
22
40
7
9
24
43
8
11
24
As on 30th June 2025
Solar Wind
Bio power
Small Hydro
FY25
FY26P
FY27P
FY28P
FY29P
FY30P
Comprehensive Policy Support
Infrastructure
ALMM
Renewable
Installations
4
H1 CY 2025
18
Solar
Other Renewable
Demand-side
Supply-side
Infrastructure
DCR Focused Schemes
▪ Net Zero by 2070 ▪ National Green Hydrogen Mission (125
GW)
▪ CPSU Scheme Phase II (12 GW) ▪ Government bidding of
50GW annually
▪ Renewable Purchase obligation
trajectory up to 2030 ▪ Green Ammonia Push
▪ PLI scheme for solar PV
▪
(48GW bids)
▪ ALMM ▪ BCD on Modules and
cells
▪ Domestic Content
Requirement ▪ State incentives
Issued Transmission System plan for integration of over 500 GW of RE power
▪ Ultra-mega renewable energy
parks
▪ Green energy Corridor
scheme
▪ T&D Infrastructure growing at
3-7% CAGR
▪ CPSU Scheme Phase II (12 GW) ▪ Government bidding of 50GW annually, DCR
offtake 25-30%
Rooftop Demand ▪ KUSUM Scheme (34.8 GW) ▪ PM Surya Ghar Muft Bijli Yojana (30 GW)
(1)
ALMM-II
GW
75+
Source: CRISIL Report and Company Estimates 1. By March 2026
V i k r a m S o l a r L i m i t e d
18
Experienced Board of Directors & Advisory Board
Hari Krishna Chaudhary Chairperson - Emeritus
Board of Directors
Gyanesh Chaudhary Chairman & Managing Director
Krishna Kumar Maskara Interim CEO and Whole-Time Director
Neha Agrawal Whole-time director & Head Corporate Strategy
Subramanya Krishnappa Independent Director
Ratnabali Kakkar Independent Director
Sumit Binani Additional Independent Director
>24 years of experience in the solar and tea industry
>20 years of experience in finance and the solar industry
>14 years of experience in consultancy and the solar industry
>42 years of experience in the solar and renewable energy industry
Extensive experience in wealth management industry
Management degree from IIM Kolkata, CA, CS and ICWA with rich experience in capital markets industry
Advisory Board
19
Dr. Alok Srivastava Chairman
Santi Pada Gon Chaudhuri Advisor
J.P. Dua Advisor
Suresh G Menon Advisor
Pankaj Agrawal Advisor
Jyotirmoy Roy Advisor
Jasbir Singh Bajaj Advisor
V i k r a m S o l a r L i m i t e d
19
Led by a Professional Management Team
Gyanesh Chaudhary Chairman & Managing Director
Krishna Kumar Maskara Interim CEO and Whole-Time Director
Neha Agrawal Whole-time director & Head Corporate Strategy
>24 years of experience in the solar and tea industry
>20 years of experience in finance and the solar industry
>14 years of experience in consultancy and the solar industry
Ranjan Kumar Jindal Chief Financial Officer
Kunal Motwani Chief Operating Officer
>20 years of experience in financial planning, treasury, risk assessment, and corporate finance
>20 years of experience in branding strategies and marketing campaigns
Santosh Goyal Chief Commercial Officer
Anil Bhadauria Head Manufacturing Operations
Sumit Kumar Head Operations – Manufacturing & Technology
Arindam Chakraborty Head – Global Human Resources
Rony Banerjee Head India Sales
>16 years of experience in exports and supply chain management
>35 years of experience in manufacturing, process excellence, & operational leadership across clean energy & telecom sectors
>20 years of experience in technology, manufacturing and R&D in the solar industry
>25 years of experience in human resource management across talent strategy, engagement, & succession planning
>25 years of experience in revenue growth strategy, sales planning, & commercial leadership across life sciences & diagnostics
Member of both Board and Leadership Team
V i k r a m S o l a r L i m i t e d
20
20
Quantifying our ESG Impact
s u c o F r u O
a e r A
R S C g n v i r D
i
s e v i t a i t i n
I
s d r a w A
Environment
Social
Scope 2 Emissions Reduction
Climate Change
Workforce Diversity & Inclusion, Occupational
Energy Management
Greenhouse Gas
Water Stewardship
Health & Safety, Community Engagement
Governance
Monitoring Waste Management
Solarization of manufacturing Plants
Ethical Conduct, Risk Mitigation, Leadership
Supply Chain Ethics & Policy Compliance
899 Kwp Falta Rooftop Solar facility
Renewable Energy Power Purchase Agreement Sourcing power for Oragadam facility
EcoVadis Platinum Badge
2025
Certificate of Participation
2024
Certificate of Endorsement
2024
QEOHS Policy Certificate
2018
Sustainable Development Goals
Company of the Year: Module Domestic (Platinum) & Smart Technology Innovation of the Year (domestic manufacturer)
Gold Medal NAMC 2023-24 by International Research Institute for Manufacturing
Best Project of the Year Ground Mount Category 2024
Aligned to National & International frameworks
Notable Awards
V i k r a m S o l a r L i m i t e d
21
Key Operational Highlights - Historical
Total Rated Capacity (MW)
Module Sales (MW)
Total Order Book Quantity (MW)
+13%
4,500
3,500
3,500
1,900
+80%
879
588
2,787
10,341
+93%
4,376
FY23
FY24
FY25
FY23
FY24
FY25
FY23
FY24
FY25
Revenue (INR Cr)
EBITDA (INR Cr)
PAT (INR Cr)
+29%
2,511
3,423
2,073
+63%
399
492
186
140
+211%
80
14
FY23
FY24
FY25
FY23
FY24
FY25
FY23
FY24
FY25
CAGR Growth
V i k r a m S o l a r L i m i t e d
22
Historical Consolidated Profit & Loss Statement
Profit and Loss (INR Cr)
Revenue from Operations
Cost of Goods Sold
Gross Profit
Gross Profit Margin
Employee Cost
Other Expenses
EBITDA
EBITDA Margin
Depreciation
Other Income
EBIT
EBIT Margin
Finance Cost
Exceptional Item Gain / (Loss)
Profit before Tax
Profit before Tax Margin
Tax
Profit After Tax
Profit After Tax Margin
EPS (Basic)
Cash PAT*
FY25
3,423.5
2,554.6
868.9
25.4%
124.4
252.5
492.0
14.4%
156.0
36.1
372.1
10.9%
154.7
0.0
217.4
6.3%
77.6
139.8
4.1%
4.61
295.8
FY24
2,511.0
1,678.9
832.1
33.1%
96.3
337.2
398.6
15.9%
138.0
12.9
273.5
10.9%
154.6
11.6
107.3
4.3%
27.6
79.7
3.2%
3.08
217.7
FY23
2,073.2
1,616.6
456.6
22.0%
91.2
179.2
186.2
9.0%
63.9
18.6
140.9
6.8%
122.0
0.0
18.9
0.9%
4.4
14.5
0.7%
0.56
78.4
CAGR
28.5%
38.0%
62.6%
62.5%
239.4%
210.6%
94.2%
*Cash PAT = PAT + Depreciation
V i k r a m S o l a r L i m i t e d
23
Mar-25
Mar-24
Mar-23
Equity & Liabilities (INR Cr)
Mar-25
Mar-24
Mar-23
Historical Consolidated Balance Sheet
Assets (INR Cr)
Non - Current Assets
Property, plant and equipment
Capital work-in-progress
Right-of-use assets
Intangible assets
Intangible assets under development
Financial Assets
Other Financial Assets
Deferred tax assets (net)
Other non-current assets
Current Assets
Inventories
Financial Assets
671.3
488.3
62.6
56.3
9.8
0.0
51.8
0.1
2.4
607.2
449.4
27.8
49.4
6.7
0.0
56.5
0.0
17.4
723.4
572.4
17.1
60.8
11.2
0.7
55.1
0.1
6.0
2,160.8
1,978.3
1,752.9
428.6
393.3
373.2
(i) Trade receivables
1,228.6
1,185.3
959.0
(ii) Cash and cash equivalents
39.2
9.0
1.6
(iii) Bank balances other than cash and cash equivalents
Loans
Other Financial Assets
Current Tax Assets (Net)
Other Current Assets
Total Assets
149.8
106.8
102.6
0.0
190.2
0.0
124.4
0.0
202.5
0.0
81.4
6.4
193.5
6.7
109.9
Total Equity
Share Capital
Other Equity
Non-Current Liabilities
Financial Liabilities
(i) Borrowings
(ii) Lease Liabilities
(iii) Other Financial Liabilities
Provisions
Deferred tax liabilities (net)
Deferred income from grant
Other non current liabilities
Current Liabilities
Financial Liabilities
(i) Borrowings
(ii) Trade Payables
(iii) Lease Liability
(iv) Other Financial Liabilities
Other Current Liabilities
Deferred income from grant
Provisions
Current tax liabilities(net)
1,242.0
316.5
925.5
192.7
77.4
32.1
7.5
26.6
46.6
2.5
0.0
445.4
258.8
186.6
717.8
198.7
36.9
7.5
18.5
7.6
14.4
365.2
258.8
106.4
814.9
214.2
45.0
7.5
7.8
0.0
12.4
434.2
528.0
1,397.4
1,422.3
1,296.2
153.3
828.3
9.1
112.2
278.5
2.4
0.3
13.3
609.7
647.1
9.1
54.9
94.7
2.7
0.7
3.4
523.6
445.9
9.4
82.8
230.4
1.4
1.3
1.4
2,832.1
2,585.5
2,476.3
Total Equity & Liabilities
2,832.1
2,585.5
2,476.3
V i k r a m S o l a r L i m i t e d
24
Historical Abridged Cashflow Statement
Particulars (INR Cr)
Net Profit Before Tax
Adjustments for: Non -Cash Items / Other Investment or Financial Items
Operating profit before working capital changes
Changes in working capital
Cash generated from Operations
Direct taxes paid (net of refund)
Net Cash from Operating Activities
Net Cash from Investing Activities
Net Cash from Financing Activities
Net Decrease in Cash and Cash equivalents
Add: Cash & Cash equivalents at the beginning of the period
Exchange difference on translation of foreign currency cash and cash equivalents
Cash & Cash equivalents at the end of the period
Mar-25
Mar-24
Mar-23
217.4
336.6
554.0
107.3
365.4
472.7
18.9
177.6
196.5
-226.9
-309.7
1.1
327.0
163.0
197.6
28.3
298.7
-168.8
-99.8
30.1
9.0
0.1
39.2
11.0
152.0
-63.7
-81.0
7.3
1.6
0.0
8.9
2.2
195.4
-110.5
-102.2
-17.3
18.9
0.1
1.6
V i k r a m S o l a r L i m i t e d
25
Key Ratios
ROCE
20.8%
24.5%
12.8%
FY23
FY24
FY25
ROE
19.7%
16.6%
4.0%
FY23
FY24
FY25
Current Ratio
Debt/ Equity (x)
1.4
1.4
1.6
2.0
1.8
FY23
FY24
FY25
FY23
FY24
0.2
FY25
V i k r a m S o l a r L i m i t e d
26
GLOBALLY We are much Closer to You
India
Kolkata
Gurugram
Chennai
International
Massachusetts
Berlin
Shanghai
THANK YOU!
For further information, please contact:
Vikram Solar Limited
CIN: U18100WB2005PLC106448
Investor Relations: Strategic Growth Advisors (SGA)
CIN: U74140MH2010PTC204285
Ms. Rinal Shah - General Manager - Corporate Finance
investor.relations@vikramsolar.com
Mr. Sagar Shroff / Mr. Ayush Haria sagar.shroff@sgapl.net / ayush.haria@sgapl.net
+91 98205 19303 / +91 98204 62966
Map not to scale