The Anup Engineering Limited
1,825words
6turns
0analyst exchanges
0executives
Key numbers — 40 extracted
rs,
20%
19%
22%
₹568 Crore
₹49
₹150
3x
27%
26
%
42%
4%
Guidance — 1 items
Ref.
opening
“Investor Presentation Q2 & H1 FY26 10 th November 2025 | Ahmedabad SAFE HARBOR Certain statements contained in this document may be statements of future expectations and other forward looking statements that are based on management‘s current view and assumptions and involve known and unknown risks and uncertainties that could cause actual results, performance or events to differ materially from those expressed or implied in such statements.”
Advertisement
Speaking time
3
1
1
1
Opening remarks
Sub.
Investor Presentation on Unaudited Financial Results of the Company for the quarter and half year ended on 30th September, 2025
Ref.
Regulation 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015 Pursuant to Regulations 30 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, we enclose herewith Investor Presentation issued by the Company in respect of Unaudited Financial Results of the Company for the quarter and half year ended 30th September, 2025. The copy of Investor Presentation will also be made available on Company’s website i.e. https://www.anupengg.com/quarterly-report/. You are requested to take the above on your records. Thanking you, Yours faithfully, For, The Anup Engineering Limited Lay Desai Company Secretary Membership No.: A57117 Encl.: As Above THE ANUP ENGINEERING LIMITED CIN: L29306GJ2017PLC099085 Registered Office: Behind 66 KV Elec. Sub Station, Odhav Road, Ahmedabad-382 415, Gujarat, India. T: +91 79 4025 8900 E: anup@anupengg.com The Anup Engineering Ltd. Investor Presentation Q2 & H1 FY26 10 th November 2025 | Ahmedabad SAFE HARBOR C
MANUFACTURING PLANT
AHMEDABAD HIGHLIGHTS • Total shop area: 45,000 m2 • Covered area (under the hook): 23,000 m2 • Under the hook height: up to 15 m • Maximum diameter: 5.5 m (Transportation Limitation) • Production length: up to 50 m • Weight capacity: up to 500 MT for single-piece equipment ISO 8 Class Clean Room for Exotic Material Fabrication (500 m2 Area) 19 ANNEXURES
MANUFACTURING PLANT
KHEDA HIGHLIGHTS • Total shop area: 125,000 m2 • Covered area (under the hook): 10,000 m2 PHASE 1+ • Under the hook height: up to 17 m • Maximum diameter: 8.5 m (Transportation Limitation) • Production length: up to 100 m • Weight capacity: up to 1000 MT for single-piece equipment • Operational from June 2023 Phase 1 (2 bays) - commissioned in June 2023 Phase 2A (2 bays) – One full bay is commissioned in Q2 FY26 and one open bay will be ready by end of Q3 FY26 Phase 3 (3 bays) – Future Plan 20 ANNEXURES
MANUFACTURING PLANT
MABEL HIGHLIGHTS • Total shop area: 20,000 m2 • Covered area (under the hook): 5,100 m2 • Under the hook height: up to 10 m • Maximum diameter: 5.0 m (Larger dimensions Site fab) • Weight capacity: up to 75 MT • U Stamp Certified • Manufactures and qualified under EIL for SILOS. • Has Site fabrication capabilities 21 ANNEXURES LICENSES & COLLABORATIONS GERMANY POLYMARIZATION REACTORS (Licensee) ITALY: EM BAFFLE HEAT EXCHANGERS (Licensee) NETHERLANDS: HELIXCHANGERS (Licensee) 22 ANNEXURES OUR ENGINEERING CAPABILITIES CODES AND STANDARDS • ASME Sec I • ASME Sec VIII Div. I & II • CRN (Canada) • ARH (Algeria) • EN 13445 / PED • GOST R / TRCU • IBR • TEMA / API • AD-2000 Merkblatt HP0 • SAS (South Africa) • NR 13 (Brazil) • AS (Australia) • DOSH (Malaysia) At The Anup Engineering Limited, we pride ourselves on our commitment to excellence and adherence to global standards. As a leading engineering solutions provider, we recognize the importance of compliance with internationally recognized
Investor Relations Team
Mr. Satya Prakash Mishra Head of Investor Relations Email: satyaprakash.mishra@arvind.in M: +91 7036228882 T: +91 79 4025 8900 Email: investorconnect@anupengg.com Website: www.anupengg.com
Advertisement