25%
: 122: 2021 The Secretary BSE Limited Phiroze Jeejeebhoy Towers Dalal Street Mumbai 400 001 25% June, 2021 The Secretary National Stock Exchange of India Limited Exchange Plaza, Bandra Kurla
rs,
e. These forward looking statements, which may include statements relating to future state of affairs, results of operations, financial condition, business prospects, plans and objectives, are based on t
Rs. 847
RE  FINANCIALS 3 OPERATIONAL HIGHLIGHTS Operations  The Company has recorded Gross Revenue of Rs. 847 Crs. for FY21 as compared to Rs.760 Crs. for FY20 resulting in an increase of ~ 12%. • Revenue of
Rs.760
IGHTS Operations  The Company has recorded Gross Revenue of Rs. 847 Crs. for FY21 as compared to Rs.760 Crs. for FY20 resulting in an increase of ~ 12%. • Revenue of Rs. 847 Crs includes Rs. 136 Crs, t
12%
Revenue of Rs. 847 Crs. for FY21 as compared to Rs.760 Crs. for FY20 resulting in an increase of ~ 12%. • Revenue of Rs. 847 Crs includes Rs. 136 Crs, towards supply to step down subsidiary Nani Viran
Rs. 136
red to Rs.760 Crs. for FY20 resulting in an increase of ~ 12%. • Revenue of Rs. 847 Crs includes Rs. 136 Crs, towards supply to step down subsidiary Nani Virani (SECI II SPV) which has got eliminated in t
80 MW
ing exceptional provision of ECL), as a result of ramp up in new supplies.  We have commissioned 80 MW during FY21, which includes commissioning for Continuum, Renew Power and certain retail customers.
324 MW
tomers.  We have multi year O&M agreements with customers. During the year, a significant volume (324 MW) was added to the paid O&M services, taking the revenue earning fleet to 1514 MW.  The foundatio
1514 MW
ignificant volume (324 MW) was added to the paid O&M services, taking the revenue earning fleet to 1514 MW.  The foundation work of the 3.3 MW turbine is complete and the supply chain is now in place for
3.3 MW
o the paid O&M services, taking the revenue earning fleet to 1514 MW.  The foundation work of the 3.3 MW turbine is complete and the supply chain is now in place for serial production. The first turbine
1324.7 MW
mercial production shall commence immediately thereafter.  Our consolidated order book stands at 1324.7 MW. 4 OPERATIONAL HIGHLIGHTS Operations  Execution of the Continuum project, Nani Virani (SECI I
100 MW
es is taking place progressively.  We have already achieved financial closure for un commissioned 100 MW of SECI SPVs with PFC. This will enable us to free up significant short term capital blocked in a
Guidance — 8 items
State auction
opening
The 3.3MW wind turbine will have a 146 meter rotor dia which will probably be the largest rotor dia in India and will be available in a host of hub heights which can be selected as per site conditions.
State auction
opening
 Moreover, with the increase in the fleet size on the back of strong auction order inflow, we expect this revenue stream to pick up strongly in the coming years.
State auction
opening
This also includes the project work in progress at sites which will be commissioned over the coming quarter(s).
State auction
opening
Going ahead, we expect inventory levels to further come down as the execution picks up pace in the coming quarters.
State auction
opening
As we ramp up supply and execution, we expect this to improve further.
State auction
opening
• RPO target increased to 21% for FY22 for state discoms from 17% in FY19**.
State auction
opening
Going forward we expect 3~5 GW of wind installations will take place every year.
State auction
opening
Tower capacity can also be outsourced depending on project location.
Advertisement
Risks & concerns — 1 flagged
3.2 3.3 2.3 1.7 1.7 2 2.3 Tariff Cap Removed 1.7 1.5 2.1 Impacted by COVID 1.6 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 Feed In Tariff Regime (FIT) Auction Regime Impact of the abrupt transition to Auction Regime from FIT Regime seen in wind installations in FY18, FY19 and FY 20.
State auction
Speaking time
State auction
1
Advertisement
Opening remarks
State auction
50MW Agreement signed with leading MNC IPP for 3.3 MW ( C) Order from Continuum Supplied Net order book (D) 23.1 250 (92) 158 Total (A+B+C+D) 1324.7 •Above order book will translate into revenues of ~Rs.7800 crores over the next ~ 24 months. 11 TECHNOLOGY  Inox Wind extends its existing 2MW product offering with the launch of the 3.3MW wind turbines which are ideally suited for low wind regimes in India. Technical Specification Rated power: 3300KW  The 3.3MW turbine is a globally operating proven platform which will further improve energy yields and reduce levelized cost of electricity. The 3.3MW wind turbine will have a 146 meter rotor dia which will probably be the largest rotor dia in India and will be available in a host of hub heights which can be selected as per site conditions. Drive Train : DF, 6 Pole Generator Turbine Design : AMSC, Austria Rotor diameter : 146m Tower construction type : Tubular Steel Cut-in wind speed (10 min mean) Vin : 2.9 m/s Rated wind speed (st
Advertisement
← All transcriptsINOXWIND stock page →