CEMPRONSE31 May 2021

Cemindia Projects Limited

3,668words
9turns
0analyst exchanges
0executives
Key numbers — 40 extracted
rs,
Quality Dept. of Corporate Services - Corporate Relationship, BSE Limited, Phiroze Jeejeebhoy Towers, Dalal Street, Mumbai 400 023. National Stock Exchange of India Limited, Listing Department, Exchang
46.64%
TD CEMENTATION – AN OVERVIEW 1 Strong international parentage with promoter ITD Ltd*. holding 46.64% in ITD Cementation India Ltd Sectoral Presence *Italian Thai Development Company Ltd • Urban
Rs. 117,323 million
footprints in Urban Infra, Metro, Airports 2 3 Robust Orderbook of • Hydro/Tunnel/Irrigation Rs. 117,323 million - • Highways/Bridges & Flyovers Executable over ~ 36 months • Water & Waste Water Pedigree of s
2 million
for over 60 years.  Listed on the stock exchange of Thailand with an initial capital base of Baht 2 million in 1994  Received the Royal Seal of Garuda, the highest and most honorable achievement for civili
Rs 35,777 million
ruda, the highest and most honorable achievement for civilian Co’s in Thailand in 1985  Net worth Rs 35,777 million (Consolidated) as at 31 December 2020  Work in hand (Construction & Concession) Rs 8,47,893 milli
Rs 8,47,893 million
Rs 35,777 million (Consolidated) as at 31 December 2020  Work in hand (Construction & Concession) Rs 8,47,893 million (Construction Rs 5,05,347 million) as on 15 February 2021. Projects with lowest bid / Under negoti
Rs 5,05,347 million
s at 31 December 2020  Work in hand (Construction & Concession) Rs 8,47,893 million (Construction Rs 5,05,347 million) as on 15 February 2021. Projects with lowest bid / Under negotiation Rs 60,619 million.  ITD h
Rs 60,619 million
truction Rs 5,05,347 million) as on 15 February 2021. Projects with lowest bid / Under negotiation Rs 60,619 million.  ITD has expanded to overseas countries such as India, Bangladesh, Cambodia, Lao Pdr, Indonesia
Rs. 2.32
d engineering organisation as well as skilled personnel to augment our local strength. * 1 Baht = Rs. 2.32 Page 5 VISION & MISSION VISION Our aim is a satisfied client, a strong and proactive workforce
100%
aste water segment, Industrial structures/buildings and Specialist foundation engineering projects 100% 80% 49% 40% 95% 60% 51% ITD Cementation Projects India Ltd. ITD CemIndia JV ITD - ITD Ce
80%
ater segment, Industrial structures/buildings and Specialist foundation engineering projects 100% 80% 49% 40% 95% 60% 51% ITD Cementation Projects India Ltd. ITD CemIndia JV ITD - ITD Cem JV
49%
segment, Industrial structures/buildings and Specialist foundation engineering projects 100% 80% 49% 40% 95% 60% 51% ITD Cementation Projects India Ltd. ITD CemIndia JV ITD - ITD Cem JV ITD-
Guidance — 1 items
Projects under Execution
opening
• 6 laning Pune Satara road project in Maharashtra • Steel Bridge over river Ganga in Uttar Pradesh Dharma Bridge, Nashik
Advertisement
Risks & concerns — 2 flagged
There is significant risk that the assumptions, predictions and other forward- looking statements may not prove to be accurate.
Encl
Accordingly, this Presentation is subject to the disclaimer and qualified in its entirety by the assumptions, qualifications and risk factors referred to in this document.
Encl
Speaking time
Projects under Execution
4
Encl
1
Scope
1
Key Projects Executed
1
Key Project executed
1
WATER AND WASTE WATER
1
Advertisement
Opening remarks
Encl
as above ITO CEMENTATION INDIA LIMITED Registered & Corporate Office: National Plastic Building, A - Subhash Road, Paranjape B Scheme, Vile Parle (East), Mumbai - 400057. Tel.: 91-22-66931600 Fax: 91-22-66931628 www.itdcem.co.in Corporate Identity Number: L61000MH1978PLC020435 EXCELLENCE IN EXECUTION Udangudi project Mumbai Metro underground tunneling ITD Cementation India Ltd Investor Presentation May 2021 Nagpur Metro Station Building Palta Water Treatment Plant Illuminatiion LNG Jetty at Dhamra Port Aerial View of Underground Bangalore metro Page 1 CAUTION REGARDING FORWARD-LOOKING STATEMENTS (DISCLAIMER) information only and may contain statements This Presentation is for general about expected future events and financial and operating results of ITD Cementation India Limited, which could be forward-looking. By their nature, forward-looking statements require the Company to make assumptions and are subject to inherent risks and uncertainties. There is significant risk that the assu
Scope
Myanmar Project • Jetties, dolphins & service platforms, quay, berths on concrete & steel piles & sold gravity type wharf structures • Ship lift, dry dock, wet basin & inclined berth • Building of jetties for handling liquid and solid cargo, wharfs, berths and quays for handling of containers  Major Projects under Execution: • Coal Jetty, Breakwater and Conveyor System for Udangudi Supercritical Thermal Power Project in Tamil Nadu • Development of Container Terminal in Myanmar • Multi Modal IWT terminal for Haldia in West Bengal • Improving Capacity Utilization for Visakhapatnam Port Trust • Development of Refit Jetty and Allied Facilities in Port Blair • Construction of Break water at Vizhinjam Port in Kerala • Development of Liquid Cargo Jetty at JNPT in Maharashtra • Bulk Berth & Approach Trestle at Chhara Port in Gujarat • Piers, Landside Tunnels and Building in Karwar, Karnataka Key Clients Dubai Ports World Port of Singapore Authority Adani Yangong International Terminal Ltd JSW
Key Projects Executed
• Successfully completed entire TBM tunneling work by ITD-ITD JV in Kolkata Metro East – West corridor • Under ground Tunnels, Viaduct, Stations and Track works for Metros in Delhi, Kolkata, Jaipur and Bangalore • Construction of Integrated Passenger Terminal Building at NSCBI Airport, Kolkata  Major Projects under Execution: • Bangalore Metro, Kolkata Metro, Mumbai Metro and Nagpur Metro • Up-gradation of Passenger Terminal New Building in Trichy • Integrated Terminal Building and Reconstruction of Old Terminal Building at Pune Airport Key Clients Kolkata Metro Rail Corporation Ltd Mumbai Metropolitan Region Development Authority Bangalore Metro Rail Corporation Ltd Maharashtra Metro Rail Corporation Ltd Mumbai Metro Rail Corporation Ltd Airport Authority of India Rail Vikas Nigam Ltd Page 21 HYDRO / DAMS / TUNNELS / IRRIGATION Orderbook : Rs 21,759 million   Scope: Concrete, earth fill, rock fill dams and tunnels Railway Tunnel Project, Sikkim
Projects under Execution
• Water conveyor system of lined gravity canal/tunnels in Telangana • Laying of Trunk by Microtunneling method in Kolkata • Sewage Trunk main by Microtunnelling method in Ahmedabad • S&D network in Churial Extension Canal sub through Microtunneling method for KEIIP • Construction of tunnels New Single Broad Guage Rail Link between Rishikesh And Karanprayag in Uttarakhand • Construction of Tunnels for Sivok in West Bengal Key Clients Govt of Telangana Rail Vikas Nigam Ltd Ircon International Ltd Municipal Corporation of Greater Mumbai Ahmedabad Municipal Corporation Tata Power Page 22 INDUSTRIAL STRUCTURES & BUILDINGS Orderbook : Rs 13,309 million  Scope: Civil structures for academics institutes, residential complexes, refineries, petrochemicals, power, steel and fertilizer plants 
Key Project executed
• Haj Tower in Kolkata • Super Structure for UAC Bose Institute in Kolkata • Buildings for IIT Ropar in Punjab • LNG storage tanks in Mundra • Industrial structure for IOCL refinery, Paradip 
Projects under Execution
• Redevelopment of General Pool Residential colony at Kasturba Nagar in New Delhi Key Clients CPWD, New Delhi RITES Limited NTPC IOCL Page 23 HIGHWAYS, BRIDGES & FLYOVERS Orderbook : Rs 1,847 million   Scope: Roads, bridges and flyovers construction