JSW Steel Limited
6,097words
4turns
0analyst exchanges
0executives
Key numbers — 40 extracted
₹38,071 crore
₹9,132 crore
₹4,516 crore
1.02x
1.73x
94%
4.41mt
3.91mt
0.64mt
0.58mt
5mt
47%
Guidance — 3 items
Climate Change
opening
“World AEs US Euro area Japan EMDEs India China PMI - Manufacturing Index of Industrial production (% YoY) • World Bank reduced 2022 global GDP forecast by 20 bps to 4.1%, due to Omicron, diminishing fiscal support and supply bottlenecks.”
Climate Change
opening
“Note: * GDP forecast for India pertains to fiscal year.”
Credit Ratings
opening
“Phased commissioning from Q4 FY23 JSW Steel Q3 FY22 Results Presentation 40 Key Project Updates - Others Vasind and Tarapur: Downstream projects • Modernisation-cum-capacity enhancement projects o All expansions commissioned, including 0.45 mtpa GI/GL at Vasind in October 2021.”
Advertisement
Risks & concerns — 1 flagged
• Inflation is a risk to growth, with possible faster monetary tightening and impact on consumers • US: Growth to moderate in 2022 on slowing consumption, manufacturing and Omicron related headwinds.
— Climate Change
Speaking time
1
1
1
1
Advertisement
Opening remarks
Climate Change
• Aligned to India’s Nationally Determined Contributions for Climate Change as per Paris Accord • Carbon neutrality at JSW Coated by 2030 • >42% reduction in specific CO2 emissions by 2030 (vs. base year 2005) Waste: 100% solid waste utilization Biodiversity: No Net Loss for Biodiversity Waste Water: Zero Liquid Discharge Water Resources: >25% reduction in fresh water consumption by 2030 (vs. base year 2005) Resources Sustainable Mining Social Sustainability Local Considerations Indigenous People Human Rights Supply Chain Sustainability Employee Wellbeing Air Emissions Business Ethics Cultural Heritage Energy Aligned to National & International Frameworks Governance & Oversight By Board-level Business Responsibility And Sustainability Committee t n e d n e p e d n I s r o t c e r i D e v i t u c e x E s r o t c e r i D Mr. Malay Mukherjee Dr. (Mrs.) Punita Kumar Sinha Mrs. Nirupama Rao Mr. Seshagiri Rao M. V. S. Dr. Vinod Nowal Mr. Jayant Acharya Integrated Reporting FY 2018 FY 2019 FY
Joint Control Entity
JSW Ispat Special Products Ltd. JSW Steel Indian Operations including Joint Control Total Combined Volumes 4.23 0.18* 4.41 0.64 0.16 0.14 5.19 5.35 3.82 0.18 4.00 0.58 0.15 0.13 4.72 4.87 12.43 0.18* 12.61 2.02 0.45 0.41 15.04 15.50 Sales 11.21 0.19 11.40 1.82 0.40 0.41 13.63 14.03 JSW Steel Q3 FY22 Results Presentation Note: Without elimination of inter-company volumes * Excluding the trial production ** BPSL is a subsidiary from 1st October 2021. 20 Branding and Marketing Initiatives JSW Radiance: Digital Campaign JSW Neosteel: IPL TVC Campaign JSW Silveron Galvalume: Brand Launch JSW Steel Q3 FY22 Results Presentation 21 20 Grades/ Products Approved with OEMs in Q3 FY22 (1/3) Pre Painted (including EMBO) development for Appliances - Refrigerator Doors ,Frames, Freezer High Strength & Structural Steel for automotive - 2 wheeler & Commercial Vehicle Applications Refrigerator Cabinet (IS 277 GPL(SGCC) –Embo) 2 Refrigerator Cabinet (IS 277 GPL(SGCC) – Embo) Freezer Cabinet (IS277 GPL(IS
Credit Ratings
o o International: Fitch: BB- (Positive outlook) and Moodys: Ba2 (Positive outlook) Domestic: CARE: AA (Stable outlook), IndRa: AA (Stable outlook), ICRA: AA (Stable outlook) Debt Profile • • • • Access to diverse pools of liquidity. Strong relationships with domestic and international banks and financial institutions Net Gearing and Leverage well under stated caps of 1.75x and 3.75x, respectively Successfully raised US$3.69bn through global bond markets since 2014 Issued global steel industry’s first USD Sustainability Linked Bond in September 2021 JSW Steel Q3 FY22 Results Presentation Note: Net Debt/EBITDA on LTM basis 37 Agenda Sustainability Business Environment Operational Performance Financial Performance Project Updates Digitalisation at JSW Steel JSW Steel Q3 FY22 Results Presentation 38 Key Project Updates - Dolvi Expansion from 5 to 10 mtpa Integrated Steel operations commenced in October 2021, and commercial production started on 15th November 2021. Ramp-up is under way 5 m
Advertisement